So we're going to start. >> Yedda. Good afternoon. It is November 3rd, 2026. We're going to call this regular meeting to order the RTC board. Can we start with roll, please? >> Michelle Belkot. Sue Marshall here. >> Wil Fuentes here. >> Anne. McEnerny. Ogle. Eric. Paulson. Eric Lopossa Shyshkina. Here. Roy McCoy here. Asa Leckey. Ron. Eric. Leanne Keever. >> Present. >> Devin Rec here. Temple Lentz here. Bill Iyall. Chris Ford. >> Here. >> Unmuting here. Bill. I'll thank you. >> Christine Lewis. And House and Senate members of the 14th, 17th, 18th, 20th and 49th districts. >> All right. Thank you. I believe that gives us a quorum. So we'll move on to board agenda. If anybody has anything they wish to change on the agenda, now would be the time. Otherwise, I'll entertain a motion for approval. >> Move to approve Linse. >> Second and McEnerny Ogle. >> I have a motion and a second. Any discussion? Seeing none. All in favor? >> Aye, >> Aye aye. >> Any opposed? Passes unanimously. Next up, public comments. I believe we had one online two online. Okay. And none in person. So I'll hand it over to you guys to. >> Kaydee you are ready for public comment. >> Thank you. Good afternoon. My name is Heidi Pozo. I'd like to comment on the Clark County Transportation Alliance's 2027 priorities. The county's new comprehensive plan pushes significant density to the edges of the Vancouver Urban Growth Area around 1/79, 119 72nd and SR 503. Much of that land was in urban holding until recently and is now being built out, but the roads there are still rural and need to be built out to urban standards. And 1/79 and SR 503 already have concurrency issues. Infrastructure needs to accompany the areas where the urban holding was removed and density is being added. The alliance list does not fully reflect that first one. 79th. The list includes 1/79 from 15th to 50th, but Dellville is left out. The urban holding was lifted seven years ago on a promise of road improvements, and the work has barely started. Much of the road isn't even in the six year tip or is not reasonably funded. Funding is needed for the whole corridor. The I-5 interchange at 1/79 is not on the list either. Wasch Dot's 2026 project delivery plan now puts it at 117.8 million, up from 86 million on its project page. It is not clear if the additional funding will be there. Second, phase two of the Salmon Creek interchange is not on the list, and it seems to be a low priority, but has been a need since phase 1 in 2013. Third, the north south roads that connect battleground are heavily impacted and are not getting enough funding focus. Washdot says the county's approach to 503 at 1/19 already exceeds levels. Service standards 72nd needs to be improved from 1/19 to two 19th, and is mostly beyond the six year tip. The segment from 1/19 to 1/39 where the county placed our 50 zoning is not reasonably funded. Finally, the shift to preservation comes to early preservation matters, but the areas receiving the density still need their roads built to urban standards. I ask that the regional priorities include the full 1/79 corridor, the I-5 interchange at 1/79, phase two of the Salmon Creek interchange, and the north south routes to battleground so that the infrastructure accompanies the density that is coming. I also ask that the shift to preservation comes after the areas that need urban infrastructure receive it. Thank you. >> And we have one more online. Mrs. Tweet. We're ready for public comment. >> Can you hear can you hear me now? >> Yes. >> Thank you. This is Margaret Tweet and I would like to urge Odot and Washdot not to not ignore the lawsuit by Ion Partners about another bridge design that's too low for companies who manufacture equipment and ship on the Columbia River. The Coast Guard made clear in letters sent in 2022 and 2023 that maintaining the existing 178ft of vertical clearance under the bridge is vital. For years, IBR has justified a two mile light rail extension with claims that 26,000 to 33,000 daily riders will use light rail. That's a 20 times increase. However, Tri-met light rail unrealistic ridership forecasts have never materialized yet. This claim likely won't either. Just reviewing the Max Green Line made a forecast that by 2020, there would be 33,270 average daily weekly riders, but instead, in 24 through 26, the actual number is 10 to 11,000. That's about a third of the forecast. Let's look at the orange line. It was predicted to be 17,000 daily riders, but 2426 it's actually 5400. About a third. Let's go to the yellow line that to by 2020 it was supposed to be 18,100. But at no point has it ever attained that by 2019, it was 1320 6.7% less than projected, 13,270. So it's never happened before. It's unlikely to happen again. And yet you want to spend $3.5 billion for this transit component that Clark County voters have repeatedly rejected. I urge you to revisit, to reconsider what is a wise use of our tax dollars. The current C-TRAN bus ridership over the I-5 bridge is lower by half than it was 20 years ago. There is no way that these forecasts are going to be attained. We're lower than 20 years ago. What you're planning is to waste a lot of our money on something we don't need, and that voters have rejected a lane of traffic that accommodates freight and busses. >> Thank you Margaret. >> A much better use of our taxpayer dollars. >> Thank you Margaret. That ends our public comment portion of the meeting brings us into our action items. First up is consent agenda boards. What's your pleasure? >> Move to approve the consent agenda. >> McEnerny Ogle. Second. >> Motion a second to approve consent agenda as presented. Any discussion? Seeing none. All in favor, I, I. >> I I aye. >> Any opposed? Passes unanimously that ends our action items. Bring it on discussion informational items. Our Executive Director is going to present the calendar year. Okay. I'll be. >> Referring to the memo and the presentation, but primarily the presentation I'm to present to you each year a budget, the fiscal year of the organization for more traditional budgeting purposes is January 1st to December 31st. So this report this evening covers that period of time. I'll be referring also to a work program. And that's the Unified Planning Work program, which is adopted on a different calendar year. That's the state fiscal year, July 1st to June 30th. So as part of the budgeting process, for those of you new to this report, I try to straddle both the fiscal and calendar year, but today's reports on calendar year. Next slide. Okay. The purpose of the budget is really to present a oh sorry. Go back Jordan. The purpose is I'm highlighting just in summary, is the annual forecast and the plan for fiscal operations. This is where we more traditionally estimate salaries and benefits, lease costs, paper materials supply, etc. So you'll see in the report summaries of the anticipated expenses that the agency will incur. I'll also make an assessment of revenues to ensure that revenues will cover those planned and forecast expenses. I'll report on that this evening. Variables that affect our budget each year are relatively few, but those notable include do we have consistent revenue flows? Recognizing that the agency has largely grant reimbursement in terms of the revenue, state and federal grants, I'll report on just the variabilities that we're seeing currently. And the other variable is just the extent of the work program commitments that we have either made as part of the PWP or that we anticipate or would like to make. And I'll report on a few of those this evening. And as I described, the work program is the Unified Planning Work program. So next slide. This is our federal and state work program. On the left are those listed activities. Many of them are routine, including, for example, regional transportation planning, their preparation and management of our transportation improvement program reporting each year as part of the congestion management process, etc. occasionally we list or as it's required. Rather, we list specific program or project activities. For example, referring to element H and the top quadrant of that table regional signal timing plan. That's a special one off activity that we have been working on. You've heard reports in prior meetings about this, the current planning process and pilot program wraps up early next year. We'll report the conclusion of the phase one and phase two pilots, I believe, at the January meeting. So that's just again, orienting you as to what's in the work program. On the right are activities that I'm planning to include in the work program, not amend in per se, but that I'm planning for, for budgeting purposes, the first of which is safety action planning, Clark County. It's been the commitment of RTC to support local agencies in Clark County and Skamania and Klickitat, but this is focusing on Clark and updating their data analysis and updating project scoping and writing grant applications for consideration. As part of the Federal Highway Safety Improvement Program. An example of this work is in recent years, we've prepared this type of reporting and analysis, submitted applications on behalf. We don't submit them, but the consultant team prepares the applications. The agency. The sponsor actually submits them. But examples of two grant awards received this year, I think it was announced at the board meeting last month of Vancouver received, I believe, upwards of $3 million for an improvement of safety conditions on 112th Avenue and City of Camas on. I believe it was Lake Road and a multimillion dollar improvement. So that, again, is just an example of leveraging regional resources to carry out and improve safety conditions across our three counties, proposing, once again to commit resources to that activity. It's not currently in the work program, but next year, when we develop the work program, we'll include that and anticipate it for budgeting purposes about $100,000, which would be largely consultant expenses, data collection and so forth, could be less. But that's the planning assumption. The second category is project application that we made last year. It was reported to the board that we were applying for a safe t action plan implementation grant. Turns out even before this report this evening, I think it was on Friday, the federal government released the grant award recipients for the latest round of SS four, a implementation and planning grants. RTC's application was not awarded. I think across the state of Washington, there was 7 or 8 grant awards through this most current call for projects at the federal level, and there was a recipient in Clark County. It was fire district three, fire district three, both in the prior cycle. And then in this current awarded cycle, as it was announced last week, receives implementation funding for a. And I'm going to forget the exact phrasing. I believe a pilot program related to blood transfusion and emergency services after collisions and people that might need assistance in that respect, it's a it's a pilot program. And this would be, I think, the second cycle that they've received grant awards. So congratulations to fire district three. There were a couple other awards across the state of Washington, but good to see that at least some of that money is coming back to Clark County for a obviously, a, a purpose that is in great need. So unfortunate for us. And so we'll strike that actually, for the next report that I give to the board. We'll just strike that. Since that application was not awarded, then the last is a new category of focus for the agency, and that is we are in need of updating some of our database tools. And we're looking closely at I'm referring to it here as AI tools. But essentially there are new tools that are vendors are bringing to market to help us in the data analysis we received reporting and some demonstrations just within the last week or two of a safety analysis software. This is a toolkit that we were reviewing a couple of years ago with members of our TAC. There was interest in it at the time. We didn't feel like the tool was developed enough in our demonstration last week. We think that the tool has taken the next step, and it's integration of looking at the actual police reporting and trying to diagnose more clearly what's happening in terms of collisions and the types of collisions, and then the countermeasures. And we think that it might be a way to optimize both from RTC's planning purposes, but then from the local government side that they would have a almost like an on demand tool that they could go in and very specifically analyze collisions, rates of collisions, sort of trends, so on and so forth. We're going to take this conversation to our TAC next and to see if it would be something where if RTC were to host the license, we could, like we've done in the example of big data collection contracts that we've issued, we secure a license, and then we have Sublicenses that we can allocate for agency use. So I think that's a good use of RTC resources. We have need to look at our tip database and make sure that we're really managing in a very efficient way our grant program. And there are some vendors out there right now offering a tool that might enhance our capabilities and streamline just the efficiency among staff. Since we're trying to cross train within that program, etc. So the long and the short of it is proposing some expenditures, I think roughly about $100,000 programed. I don't know if we'll spend those, but I wanted to communicate that. I think it's our intention to. If the tool made sense that we try to demo the tool and if. If that can optimize staff and provide data in more real time, I think it's a good use of our ETC resource. Any questions about those kinds of activities? Okay. Next slide. I wanted to share with you a new slide that I prepared. Those of you that are familiar with this report from prior years, this is an estimate of revenues. And I've portrayed revenues in two columns. One is what our current balance is, and I'll speak to that in a moment. And then one, what is planned in calendar year 2027. And I'll speak to details here. As I said at the beginning, I want to make sure that our expense profile matches the revenues available. This is a very high level analysis. Points of clarity when it comes to the types of funds. So about 85% of the funds that RTC uses are federal. They come in sort of two categories. One is a general planning grant, which is offered to all MPOs across the nation by formula, through USDOT statute. And then the second are project specific grants. So RTC applies and awards itself for specific project activities, like, for example, the regional signal timing pilot either sdbg the reference there to CRP as congestion reduction program. So occasionally will award project specific grants or will earmark CBG funds for operations. We receive money from the state by appropriation on a biennial basis for our RTP functions across all three counties. Occasionally, we'll enter into project reimbursement agreements. In this example, we do have an agreement currently with the Interstate Bridge Replacement program to reimburse us for time spent on that project. The board approves the assessment of dues to members, and then Enterprise Services are will provide data to consultants upon demand. So in the left column, if you sum everything up on hand as of July, and I think this is the caveat, as of July, we had revenue contracts to about 3.1 million. You might ask the question why as of July as opposed to December 31st. Well, let me give you the forecast. We spent about $230,000 a month in costs, salaries, benefits, consultant reimbursements and so forth. So if you just generously apply 230,000 for the remaining six months of the year, in current balance of grants available to be reimbursed, we have about a $1.7 million balance. So we can pay the bills through the end of the year and still have money left over to program for activities next year. So we start, let's say, the year with about 1.7 million and then the planned. And here's the caveat. The planned is what we expect or our believe would be committed next year. And so let's begin with the federal government. And there are a lot of caveats, maybe 2 or 3 asterisks behind that in our traditional. Or maybe there's a better term in our recent year experience, we are set to receive about $1 million in federal planning grants. So far, we've only been released to spend about 100,000. And the reason for that is just Congress hasn't committed a new Surface Transportation Act. And so what we expect this next year is that the federal dollars under the PL category will just be released in little tranches ten weeks, two months, three months. This is not unfamiliar territory. All to say, we certainly can't spend what we don't have. And so that's one of the reasons why we sort of carry reserves to to address this fluctuation in federal release of funds, the federal project specific grants as of July 1st of 2027, will release another 975,000. So again, I mean, there's just you can sort of catch the flavor of the trend here. There's cash flow that we have to manage. And so we're always cognizant of how much money we have to reimburse. And then when the money might be released, we assume the legislature will appropriate again, the funds over the past biennium, it's about $344,000. So 177 is roughly half of that. Again, those funds wouldn't be released until July 1st of next year if appropriated. Our agreement with the Interstate bridge replacement program may be revised next year, but I've just carried forward 45,000. Whether we receive that or not is almost insignificant to the operations of the agency, because it truly is just reimbursing us to go to meetings. So in some respects, it's not not required to to fund our operations. The member dues assessed as of January 1st, 2027, the board approved these in April of last year, 295, and that again, helps us address cash flow needs as we go and reimburse grant match requirements and so forth. And we expect about 25,000 again in consultant services. Could be 20, could be 25, you know, but again, generally that's the planning assumption. So in summary, with that long explanation, we have sufficient revenue to fund the operations, recognizing that some of the revenues that we have planned for 2020 7th May not come when we think we should receive them, but they should ultimately come. I feel confident we can pay the bills. Okay. Next slide. With that in mind, this is just another way of looking at it. Let's skip over that because I've talked revenue enough. Let's talk expenses one year to the next. The 2026 budget is on our left, about 3.7 million planned. We make candidly spend quite a bit less than that. And it's just a function of did we reimburse consultants at the rate that we had planned? I generally over plan or over program just to make the capacity available. We do have some vacant positions that were unfilled. ET cetera. You see, if you compare 26 to 27 more or less, our budget is pretty much the same. Knowing that they're just they're not going to be this is an overestimate of probably what we're going to spend. So again, thinking back to the revenue side of it, we have sufficient revenue to cover the expenses. And this is the expense side. Next slide. And actually go back to the slide previous apologize. Let me just make a comment. What's what what have I seen in the last week. And that is benefit costs to RTC is the employer and employee have been significantly increased. So we buy our benefits through Clark County and they have a very comprehensive benefit program and very aggressive in terms of their bidding and market work that they do with their vendors. And we received, as part of an open enrollment, just the cost increases. They're significant. It's not going to, you know, tear a hole in the budget, so to speak. But I just, you know, the board probably is seeing that in your own budgets and just other private. Benefit costs that are out there, Affordable Care Act, etc. We're not immune from that. I can tell you also in conversation with the benefit administrators at Clark County, that they're looking at ways to contain costs, all to say they would also say their benefit program compared to peers is actually still very cost competitive, if cheaper than many peers. And I think it's just a function of how they bid. I don't know all the details. And so excuse me for maybe lack of clarity. Will we see benefit costs continue to increase over time? Yes. But I think we just control those knowing that employees, as part of our employment package, receive health comprehensive health benefits. So the cost of doing business, but we can pay for it. Okay. Next slide. And I'm just going to summarize with just a little bit of detail here. You'll see it all in the budget report. Just recategorization of we spent a lot of our resources on professional services. We have project specific study agreements that are then listed in the lower right quadrant. We have Intergovernmental Contract Services. Those would be services that we purchased through Clark County. For example, we purchase and piggyback onto their IT system, the HRIS system. The auditor's office of the county helps us with accounting and the treasurer controls our money, etc. so we through those agreements, we identify what's going to cost us next year, administrative services that would be for our external outsourced accountant and auditor, legal services, so forth. Technical services. This is we procure services for GIS and other data and support services, website development and etc. programing other which is I call it on demand contingency. I think it's wise to just program some uncommitted resource in case we need to address a problem. If there were to be a cyber attack or, you know, who knows what the circumstance might be. And then on the lower right quadrant are just the planned contracts or availability for commitment to contract. The one on the very bottom is not fully committed regional planning services on demand. So that is to say, if we get into some of our studies or want to initiate new studies based on emergent issues, there's some capacity to do that. Next slide. And this concludes my report. If take any questions this evening or offline and bring it back to the board for December approval. >> Any questions comments concerns. >> Chair and McEnerny Ogle. Matt, could you explain that quarter of a million on that regional planning services? What types of things have we done in the past on that? >> We. So, for example, we we may initiate a study. I've told the team. And so I'm going to use a very specific example that hopefully makes sense. We produce a lot of documents, but many of them are very long and not worthy of distributing. And I and I have this goal for the agency to take some of our 100 page documents and turn them into folios. And so, for example, this evening you have in front of you a folio that was done as a wrap up to our phase one of freight study. And these folios, we can either attempt to produce them in-house or we send them out of house. And so that might be an example of to, to have a consultant come in and just produce that folio might be 10 or $15,000. It depends on how much work we might want them to do. So if I told staff, hey, I want these five reports and I have an idea. So I'm just conceptually giving you a sense. I have these five reports that I want to create a folio about so that we can start to share our work. That could be, you know, 50, 75, $100,000. So we have a group of on call consultants that the board approved. I think it's six firms. And if we had an activity like that, just using that example where we wanted the consultant to assist us, there's capacity to do that. So that's that's the idea. There may be a study that might come up, and I'd bring it to the board and say, we'd like to do this study and we have the capacity to do it. So in some ways, it's uncommitted resource to do to do the work of the agency. >> Okay. Thank you. >> Thank you. About a year ago, the board changed some language that said we would begin studying for a third corridor, a third bridge, once the IBR received a record of decision. So we received that record of decision in July. And so I am wondering if the 2027 budget would be an appropriate place to set aside some money to begin studying for a third and potentially a fourth bridge corridor. >> Well, I think the response would be it could be we've identified in the Unified Planning Work Program, a study which is I would conceptually conceptualize that as like a scoping study. I, I don't have the trying to mentally think of how much money was in the up for that activity. If you go to the Up document, there's a series of unfunded planning studies. Another example could be the board last month identified an amendment and approved an amendment to the Up LUP, which added a strategic feasibility study for extending 18th Street between 1/92 and Goodwood Road. I think the proposed scope and again, very high level conceptual feasibility study. Again, I apologize. My recollection is maybe 250 300,000. Another example of the use of this uncommitted resource would be if Vancouver or Camas wanted to come forward and initiate that study. Maybe RTC would contribute and participate as well. So I think the direct answer to your question is if there were resource available to do the work that the board is interested in. I think that's the conversation of the board. In that specific example, there's not enough money right now to do what I think might be a comprehensive scoping study, but maybe it should be looked at. >> Do you have a rough estimate on how much money would be needed to begin that process, or a study so that the board could have a sense of how short we are? >> On the fly? I, I will go back and I'll look at the Unified Planning Work program to see what that number is, and I'll report back to the board what that number is. >> Chair. But that decision on any study would come to the board for their approval. Yeah. Thank you. >> Okay. Comprehensive look at our budget. Thank you. Matt. Adam is going to be presenting the Clark County Freight System plan. >> Good evening. Can everyone hear me? The mouse is on. Okay, so this presentation builds on some of the data and outcomes from the freight mobility study that we produced in 2025. Matt referenced the the folio that was produced to capture some of that information. The study gave us a foundation foundational understanding, I should say, of how freight moves in Clark County and where the system is, is strained. We're now moving into phase two. The Clark County Freight system plan, a little confusing in terms of titles, but I'll try and get it. Hopefully you'll follow along. The focus of this plan shifts from understanding what the system is and tries to define what the needs are, and identifying practical future priorities. The work will include stakeholder input, technical analysis, and development of recommendations for near mid and long term action. The anticipated milestone is a draft plan, which we look to return to you in December of 2027. We will keep you updated and informed should that milestone change. So state phase one study. It helped us understand, as I say, what the model behavior was in Clark County, both for the president and also into the future. Clark County, we learned, you know, handles about 38 million tons of freight annually worth $25 billion. Most of the movement is by truck with a smaller share moved by rail, and an even smaller share moved over the river, each playing significant roles. Though I five and I 205 corridors carry the highest daily traffic volumes, and they include substantial number of trucks. Study also points to significant future growth in truck trips by 2045. The growth has implications for congestion, reliability, industrial access, community livability, the purpose of the freight system plan is not simply to move trucks more efficiently, but to understand how good movement, economic activity, multimodal connections, and community impacts can be balanced over time. The technical findings are only one part of the planning process. In April of this year, we invited port and industry partners to participate in a visioning workshop to help connect those findings with the experiences of communities, businesses and transportation partners across the region. Several themes emerged, and we've included links to those in your meeting packet. They're available online, and those themes were congestion and capacity constraints, the risks created by underinvestment and the importance of multimodal connectivity, as well as the need to balance good movement and community impacts. The emerging values, which I've included on this slide, are a useful yes. Good. It is on the slide. It helps us understand and define what this next phase of work is, and they are aligned with the RTP goals around creating a freight system that is safe, resilient, efficient and sustainable, while also supporting businesses, markets and quality of life. The emerging vision is intended to guide the plan as the analysis moves toward needs, priorities and recommendations. So on October 16th, we held our first Freight Advisory Committee meeting. The committee creates a regular forum for bringing operational experience and system analysis into the planning process. It is a technical advisory committee, or TAC, to the Regional Transportation Advisory Committee, and includes members from many of these organizations that are included on the slide. The range is important because freight challenges often occur across jurisdictions and across many different modes, and so having many people around the table and looking at ways we can expand that tent has been really important. And for that first meeting, I think that that was one of the important things that we tried to address. You can also find a link to the meeting notes from from October in the meeting packet as well. And we've included that on our website. The discussion focused on primarily on practical system issues, truck parking and staging, reoccurring bottlenecks, rail capacity and crossings, access to industrial areas, as well as first and last mile connections. The committee's role is to help test the study findings, identify issues that may not appear in the data alone, and inform the priorities developed through the Freight system plan. So this slide shows how we're looking to take that study and move it into planning action. So working from our left side to the right side on the screen, first we need to understand today's system. How does it perform well? How does it underperform? How are conditions changing and how do those different modes connect? Second, we need to understand tomorrow's needs. This includes looking at growth forecasts, future bottlenecks, access gaps, resilience and opportunities to improve the system. Third, the plan will prioritize investments and strategies. Those may include infrastructure projects, operational improvements, technology and policy actions. The outcomes are intended to set a. As I said, near mid and long term priorities along with candidate project lists. These are planning planning recommendations to be evaluated and prioritized, not approved or funded, but simply to understand what those those projects or plans may be. So Clark County's freight needs are part of a larger planning and investment system at the state level. The Clark County Freight System plan will connect with the efforts of Wasch Dot's own freight system plan, which is just wrapping up right now. Fitim six year investment program and Washington State rail plan, as well as truck parking initiatives and the Wasch Dot's Washington Freight and Goods Transportation System, which is completing an update next year. At a federal level, freight funding programs and transportation reauthorization provide broader policy and funding contexts. It's as Matt mentioned, we are looking to learn more about what that context looks like in the new year and how how different funding programs, such as the National Highway Freight program, may be impacted. The important point, I guess I wanted to mention with this slide is the alignment of these three different scales. A locally supported priority is best positioned when it is clearly understood within the state and federal planning contexts. So from the outset, that's how we are really focusing on working forward. The schedule, I think, follows a pretty logical progression. The foundation initial engagement work occurred in 2025 through to the fall of 26. The next phase is that technical analysis and future needs assessment, followed by a development and prioritization of recommendations working our way towards the milestone of a draft plan in 2027. The anticipated draft plan will bring those pieces together for board consideration, and it should provide a clearer picture of system performance and future needs, along with proposed priorities and implementation framework. So for us, success means more than producing another study. Even though they look great, the plan should give the region a clearer understanding of the freight system performance and future needs. It should establish practical performance measures and provide an implementation framework for coordinating future funding opportunities. These recommendations will need to be evaluated through appropriate agencies, funding and public decision making process, and we're looking to work with the the TAC that I mentioned before about six times over the next year. The longer term objectives is straightforward. We're looking to have a more connected, coordinated freight system in Clark County. So I that's the end of my slide. I don't have a question slide, but if there are any questions, I'd be happy to take those now. >> Go ahead. Mayor. >> Since 2019, the City of Vancouver has had an industrial access feasibility study that brings the new freight route down northwest 78th over BNSF onto the new northwest 32nd Avenue extension. Can I assume that it's in this scope? >> Yes. So and we've been already in discussion with the City of Vancouver around the the different freight activity in that area. That project is identified in the six year priority list. I believe I'm looking to you for nods. And will be a part of this this planning effort as well. >> Great. Thank you so much. >> Councilor. >> Thank you, Adam, for the presentation. I have a question. And. Maybe a question not just for RTC, but also for. I have a suspicion Mayor Anne may have an answer to this as well. In the slide deck titled Why Freight Matters to Clark County, we are forecasted to see truck trips grow 67% by 2045. That is incredibly significant, right? And that's all across Clark County. Now, I suspect that a bulk of that truck trip growth will also be to and from the Port of Vancouver. Now, most of the truck trips right now go from I-5 to the Port of Vancouver via Mill Plain Boulevard. Has there been have there been any studies done to identify any alternate routes from I-5 to the Port of Vancouver? And I think a lot of. I drive a lot, and I think a lot about the residential apartment buildings along essentially the heart of the downtown Vancouver Mill Plain Boulevard, and the noise and the pollution that it creates in a very dense urban part of town. And if we see a 67% increase in truck trips over the next 20 years, we're going to see more trucks along Mulqueen Boulevard and some on Fourth Plain Boulevard as well. So I guess going back to my question, have we identified any potential routes that could avoid having trucks go from I-5 to the Port of Vancouver via Plain Boulevard? >> Yeah. So to answer your question, I think the most recent study was produced by the Port of Vancouver, which looked at the access routes between I-5 corridor and the port itself. So yeah, to answer your question, the Port of Vancouver has produced that work. >> Where can I find that information? Port of Vancouver's website. Okay. >> Thank you. Yes. >> If I might add a point, councilor, thank you for bringing that up. Not just because Forth Plain Mill plain are heavily residential, but the new route that we have been pushing for the last eight years brings it behind Fruit Valley Elementary School and the lowest socio economic area in the city. Bringing that back around would help the port tremendously. Right now, the bridge over the BNSF has a weight restriction on it, so it's fine for potato chips from Frito-Lay, but not steel to the industrial area. >> Thank you. >> Yeah. >> I'm really happy that this isn't a question. I don't think we'll see when I get to the end. I'm really happy to see this continuing and developing. And from the perspective of also serving on the Freight Mobility Strategic Investment Board. Considering a coordinated system is so important because it is a freight mobility system, as you've mentioned, that crossing jurisdictions, different types of of mobility. And as we do become denser, we're going to have more people who need more things as well. So the importance of freight to our community in Washington being one of the most freight driven economies in the country, we do need to figure out how to make that balance and move things efficiently and effectively, because we're going to continue to have more and more of them coming through Port of Vancouver, our other ports in the area, and then also coming just through our community on their way. So, you know, that is one of the things that the CIB does is look at that balance. But one of the things that we need to do that work is work like this, so that when projects come through, we're not just hearing from individual project sponsors, individual cities and counties and ports, but from the region about what is needed for a most effective system. So I'm really happy to see this going. One actually. So yes, I do have a question is, how are you looking really mostly at just connecting routes? Or are you also considering like volume and, and tonnage and sort of the weights and the loads that are going through as well? >> Yeah. I think you're the first comment you made. It is incredibly complicated. And we're really lucky to be starting this project on the heels of the Washington state's own freight system plan, which is doing a lot to provide a wealth of information at a county level of of some of the information has yet to be released, but built on, on some of the dashboard information that they had released in the earlier iteration. So we're really looking forward to using that to take this study that we had produced in 25 to the next level. In that study, we looked primarily at truck freight. It does account for about 75% of all freight freight in our region. And that number is we're projecting to grow in the next 20 years. So that was really our focus with the study. With this plan, we're looking to broaden and look at the rest of the freight system across the different modes, which would include rail, river and runway, likely in PDX, but also in some of the smaller runways in the region. So I think to that point, yes, we're looking to look more broadly at freight across different modes. And we are looking at capacity. I mean, something that we heard a lot at our first meeting in October was looking at underutilized. Areas, particularly, you know, River. So seeing those connections, I think is important in the context. Your question about how we're looking at it, if it's project to project or specifically to a project, I think we're we're still early enough in the process that I actually don't have a good answer for you. I think that we're still trying to figure that out. And we're going to be, you know, amenable to what the needs are and what kind of projects and, you know, reflect those those needs in the future. >> Cool. I have one follow up, if I may. I also just want to say that I'm really happy to see policy as part of what you're also going to be reviewing and really look forward to some of those outcomes. Because also when we're talking about transportation planning at the state level, and we're all trying to get money from the state and from the from the federal government with a strapped transportation budget and projects continuing to get more and more expensive, oftentimes the conversation is just around like, what can we afford to do? So getting policy suggestions from the local level to help us determine how can we make projects more deliverable? Where are the policy places that we can make adjustments, whether it's federal or state or local law, to help us do more, to make these connections, to keep our community safe and to keep things moving. So bring on the policy suggestions. Thank you. Thanks. >> Thanks. I think it's important to have somebody like that. Just follow up to Commissioner Lentz. I want to say, knowing that 67%, we're going to have more freight, which is great for economy, but also that means those roadways need maintenance more often than before, 67% increase. So that that hopefully in this study, we can look into the cost of that. So we put money aside for all these future maintenance, pavement maintenance. Thank you. >> All right. Thank you, Adam and board for robust discussion. Bring us to other business. First up, something from the board here. We do have the annual review coming out. All voting board members will be getting the survey monkey. I think most of you have seen it before. If not, it's pretty simple really. I would like to see comments. Those are really helpful. So that'll go out to your email here by the end of the week. If you can get that back by Thanksgiving week, that would be great. Those will then be delivered to the executive committee to compile. If the board wishes, we can schedule an executive session in December. For any discussion that you may want, please reach out to myself or Sue for that. This is a mid contract review, so there's no compensation or anything. It would be more work product related comments and discussion. So but please take some time with that. Please fill those out. And the sooner we get those back, the sooner we can complete that and wrap that up. Any discussions on that? Okay. And then I'll hand it over to our executive director. >> Okay, directors, I have an update. Just wanted to share with you the status of the Clark County Transportation Alliance 2027 policy statement. I reported last meeting that we were imminently going to publish that and take it to a roundtable review, so I'll bring you up to speed. On October 13th, I presented this statement that you have in front of you to the Clark County Government Affairs Roundtable. This is a meeting convened by Identity Clark County and Ron ARP, specifically, as president, it's an opportunity to do two things. One, review the Keesee T statement, which I presented, and I'll go through just the scope of which. And then the second part of that meeting is generally just to talk about high level government affairs and legislative priorities among all the agencies. I think there were upwards of 30 to 40 agencies represented in that meeting. Turning to the KTA statement, it's largely like it has been presented in prior years with just some minor editing and refinement. We tried to just reduce a couple of the words to to finesse the word count a bit. I wanted to point out just one notable shift, and that is how we're talking about the Interstate bridge replacement program. So in prior years, the statement specifically called out the Interstate bridge replacement program. As you know, among the most important regional priorities. Now it's just being restated as among the most important national priorities. And the reason for that, I think, is twofold. One, now the project turns from the environmental study phase to the implementation phase. And there yet pending federal grant awards that are proposed to be applied for, specifically, a federal transit project grant. And so knowing that a lot of the emphasis in the next tranche of funding is geared towards our federal and congressional partners in those processes, we wanted to reinforce just how important this is for the two states, for our nation, candidly, and there's just some repositioning. I think the thrust and the intention is, is the same, which is it is really among the region's top priorities for economic development and infrastructure preservation, so on and so forth. But just again, formatting adjustment and then turning our attention to the state or regional actions, we're just, again, rearticulating how important it is under action one for regional preservation and operations. I think even just as Devin and I were talking before the meeting this last week, we it's currently clear that we need to maintain our interstate and local road systems. There are just as unusual circumstances as it occurred on I-5 last week where, you know, the pavement sometimes mysteriously, you know, deconstruct or whatever the technical term might be. And so we need to just be diligent with our bridges and roadways. And, and so, again, seeking continued support by the legislature for the commitment to preservation, which they've done in recent years. But there's just a lot to catch up for, need for continued enhancement, for safety and safe systems approaches across all three counties, this one specifically for Clark County. And you hear me reinforce as part of the budgeting process, the allocation of RTC resources to leverage and to do the safety planning and grant writing. And I think that's an activity supportive of this overall emphasis on safety. And then third, economic development and and working with the legislature to preserve those programs from key constituencies, including Transportation Improvement Board, the County Road Administration Board, all the Alphabet Soup Siemssen the fund on a competitive basis, regional high priority projects, of which we have over a dozen here. We want to make sure the legislature continues to keep those programs intact and. And if they can add money, great. If they can just, at a minimum, not reduce the funding as they have in recent years with the Public Works Trust Fund, they've reduced or cleared out some of the funding for that program. So that's the legislative intention. And then did some project updates on the list. In recent days, I've had correspondence with the city of LA center, the mayor, Strohbehn, and he wished to express his gratefulness that we added this year because they had completed their prior project, we added a new project for them, project N, which is a strategic road improvement for on the center road from I-5 into downtown city center. That was a new project added. And again, this. The visibility of this statement of reinforcing local agencies priority projects, I think is the key. And that's that's the point. And then I understood from the city of Washougal, their council was briefed on this last night and they offered their endorsement. So I don't know the state of all agency endorsements other than it's out for endorsement if your agency chooses to pick it up. I know Ron ARP, who's here today, would be more than happy to attend any of your council or commissions to support this statement. I can offer my own commentary if that would be desired. And so any questions about the Keesee TAI think once it's completed, it'll be presented to the bi state Legislative Breakfast Committee, I think in mid-December, the Chamber of Commerce with identity. Clark County and Columbia River Economic Development Council will host a bi state legislative breakfast, and this will be presented to the legislature at that time. One other activity that I'll mention is Ron and I have talked about convening just some small focus groups with new members of the legislature. Should they be elected this evening or existing both, and that we socialize this statement before session and be available during session. In years past, we have held a Olympia Day. I'm not sure if that's going to be hosted because of just the logistics of everybody going up to Olympia. However, should the legislature take up a new revenue or transportation funding stabilization package will certainly harness the advocacy that this statement has, and I'll participate in that. So that's my report on Keesee to take any questions if the board has any. >> Chair ready to go back to our jurisdictions and then come back in December and vote on this for approval? >> Yes. The this statement will return to RTC, and it's generally by timing after agencies have supported. There may be an agency that has a meeting after. This could be. For example, there's just the timing. But that's the intention. We wait until December for this board to endorse. That's my report on this. Oh, sorry, representative. >> Thank you. I am wondering and looking at this list, there's a lot to be done. And in Washington state, revenues are extremely tight. And I am wondering if there was any discussion amongst those people about potentially accessing federal funds for potentially third or fourth bridge crossings. Like our number one priority is the Kamea Slough Bridge. Well, if it occurs to me, if we were to tie that into a East County crossing to the Troutdale area, we might be able to access significant federal funds. That would include paying for a portion of the upgrade or replacement of the Camas Slough Bridge as one option. Separate point item J. They're very vital to our ports and our freight haulers there. And again, one of the options in the RTC visioning study was in essence, a port to port bridge in the west part of the county. And so it occurs to me that might be an avenue to pursue both planning for third and fourth bridge crossings, along with accessing significant federal funds. And then next, well, in a week and change item P is the City of Ridgefield having community input on their southern connection to I-5 around the 502 interchange. And that potentially, again, could we access that >> As an option for a Western connection across the Columbia River, all of which to get federal money in this, and I would just welcome. Was there any discussion amongst those 20 or 30 people about other bridges, other corridors, and way to rope in federal dollars in order to reduce the burden on the state, because the state is extremely asset limited? >> Yeah, I'll respond just very briefly. Yes. There's conversation about wrapping in federal dollars for these specific projects. And that's top of mind. You refer to the Kamea Bridge, the West Valley, excuse me, Fruit Valley Freight Access project project J. ET cetera. And so while this statement is in part geared towards state legislature, it's also meant to be leveraged in our federal conversations with the with the delegation, which is in part why we tried to restructure conversation around Interstate Bridge. The second part of your question, which is link to and create a larger project that has not been part of anybody's thought process, I think in part, just focus on these. But but it's an interesting way to think about it. But that has not been part of the conversation today. >> Thank you counselor. >> Thank you. Chair. Matt, I had one question, but now I have one opportunity for you to make clarification. So in the prior question, there was a reference to this being rank order priority. That's not in fact the case. >> No, it's just it's implied because of, you know, top to bottom. But I think as we've expressed in both the round table and each year, this is not a priority array. It's a it's a statement among jurisdictions of their highest priorities that interlay and align with the regional priorities. So it's a priority statement. >> Thank you. And so my question is this. In an earlier public testimony, there were questions about there were questions about the extent of some of these projects not being as extensive as some in the community would like to see. For example, 179th Street was mentioned in it being not extensive enough to support potential future urbanization in some of these areas. With that in mind, would you please speak to the process by which a project is considered for inclusion on this list? And what role does the lead agency play in defining the extent of a project? >> Okay. The sponsoring agency is fundamentally the sponsor. So the example would be as part of my technical review with sponsors, I outreach. And I say, is this project still your priority? And if not, you know, is do you have an alternative or you no longer have a priority in. And the. The way a project becomes a priority is that it truly is of regional significance. There may be projects in any city or jurisdiction that just serve a neighborhood or serve, you know, a connector across town. This could be categorically considered regional, meaning it really benefits a lot more people than fewer people. So the the project sponsors are always in control and how it aligns with our regional plan and how it makes the list is it agencies in a somewhat, I guess just the art of the deal, right? Some agent you can't have ten projects as an agency. So every agency gets to select their most notable priorities. Those most notable priorities should also align with what they are advocating for in Olympia and in Washington, D.C. And I recognize because I, I actually do this, I read your legislative priorities and I monitor your agendas, and I do a little bit of filtering myself, which is, oh, well, this showed up on so and so's agenda. It must be a priority. And that prompts the conversation for me to make sure we have alignment. Ultimately, what we want to express here is this statement is the big umbrella saying a coalition supports these projects and the coalition is the value, the the, the Clark County Transportation Alliance being the coalition by name. And that in the halls of Olympia or the halls of Congress, the sponsors can then leverage that. Not every single word is going to be endorsed. Not every single project is going to be endorsed by all. But generally there's a big umbrella. And I think that's the intention when it comes to these are our priorities. Recognizing that individually, you might think your priority is more important than others. And that's just fully recognized. And I think for members of the legislature, you get that too, right? When people meet with you, you're trying to understand, is this really a priority? And I think that's what we're trying to express here. Thank you. And so the filter is it really does rank as a priority within this region. >> So but very specifically to the concern that certain projects don't appear here or the project itself is not as extensive as folks would like for it to be. Translating what you just said to that particular lens, it would follow that if a person wanted a project within Clark County, for example, to be more extensive or to be considered for inclusion on this list, that the first point of contact would be at the county level to say, please elevate this in your priorities so that it could be considered by RTC for inclusion on this list. Is that correct? >> Yes. The sponsor owns the project. They own the cost estimate. They own the description. I'm the intermediary to filter through and at times say, hey, this project doesn't really qualify. And I had to do that this year with a few sponsors that proposed ideas that it's not really the regional level or in the example of let's, if you have two projects, let's choose the project that is needing the most help that needs the coalition behind it. I'll refer to that example of 1/79. The county has multiple phases of that work. Phase A, phase B, phase C says D, and they presented here. These are the ones that they really have on you know their priority. They're either imminently going for money, they have a backfill of need for money. And so the plan for the county has the entirety. In that example, they have the entirety of the 1/79 corridor from X to Y. And they've just broken it up into different pieces. And so this is a point in time statement about those projects that we want to get behind. And we feel like there's an opportunity to leverage either state or federal resources in addition to local local resources. >> Mayor chair, I am. Thank you so very much. We don't get ten projects, and the federal government doesn't allow us to have ten projects. I appreciate the second bullet here support planning and balanced long term funding for Nepa approved five mile corridor plan, including the bi state transit to Evergreen Station. We're not done funding this project, and this is a 31 year project. And so the federal government asks, what is your priority? We would like to finish this project, and that is why we would not be asking for additional funds for additional bridges. We're not done with the first one. Thank you. >> Okay. Thank you mayor. I would also add. For the catalytic regional projects, I know our two projects are already in right away. I mean, these are I hate to use it shovel ready projects. So I want to thank ICC for being part of this. I know this is it's hard to get this many squirrels running mostly in the same direction. So I also want to point out, I love the fact that preservation is a high priority because that saves us money in the long run. And it's something that present company excluded. Politicians like to cut ribbons for grand openings and new projects. Sometimes preservation slips down the list. So happy to see that as a a high priority. Thank you liane. Oh, I'm sorry. Lehan. >> Yes, I just wanted to confirm the due date because I know Director Matt said that RTC's board was going to be looking to adopt it on the first, but we have till the 11th because we're looking to do it for our board meeting. So it would be after our board meeting for approval. >> Okay. Yes. >> The 11th is the cutoff. >> Yeah. That's correct. The RTC will because of our meeting, cadence, will adopt on the first, knowing that some agencies have a meeting cadence following that. So thank you for that clarification. Thank you for the conversation. I, I would just observe this is important to. One, align behind a subset of regional priorities. And a subset is how it's been characterized here. But the conversation and the dialog around the exchange, it many or most of you are in Olympia often or in DC often, and doing your specific project to project level of advocacy for me as director of this agency, if I can see a project or see the concept on this list, and then I have the opportunity with members of the state or congressional delegation say, hey, this is our priority, that this helps me share the regional priority. I, I can certainly talk about projects specifically some I know more detail than others about. And I'm eager to learn more about each of these if I have any blind spots. But I think as me as an ambassador for the agency, to the extent I can advocate to push us forward and we all know how this will work. You might get the project this year and somebody gets the project next year. I mean, we're all pushing in the same direction, so I think this is really a worthwhile effort. It seems like it's redundant, but it's not because I think we always need to be prepared because we hear that the state and their transportation revenue forecasts, they're short over the next six years, the next three Bienniums, there are some gaps, and the legislature and the transportation committees are going to have to take up the conversation. How do they fill it, or how do they start to move projects aside? And that's very important. We need to be ready for that conversation. So thank you. >> All right. Thank you. With that, speaking of our schedule, the next scheduled RTC board meeting, RTC Board of Directors meeting is Tuesday, December 1st, 2026 at 4 p.m. With that, this meeting is adjourned. Thank you.