>> I will call to order this hearing of November 24th, 2026 for Clark County. My name is Joe Turner. I am the county's hearing examiner. I'll start with some brief announcements and a summary of the process that will follow so everyone understands how you can participate in the hearing tonight. I start by saying I'm not a county employee. I'm licensed as an attorney and trained as a planner. I serve under contract to the county counsel. I say that so, you know, you're getting an independent review of the applications before me tonight. My role is the hearings examiner is conduct is to conduct public hearings and make decisions about certain land use matters in Clark County. In making those decisions, I am required to apply the county's existing laws. I'm not a policymaker. I don't have the authority to vary from or change the laws. If you think that the laws need to be changed, you can work with the Planning Commission and. Keip straight. I keep wanting to say the board, but the county counsel to do that. But state law requires that this application be judged based on the laws and effect. When the application was filed. As a hearing examiner, I'm to provide an unbiased decision maker. I believe I am unbiased with regard to the applications before me tonight. I've not had any pre-hearing contact with any of the parties regarding the substance of the applications, and I don't have any interest in the subject properties or any of the surrounding properties. But anyone has the right to challenge my impartiality, to argue that I'm biased in one way or another. And you can do that when it's your opportunity to testify. Procedure will follow. I'll start by asking staff to summarize the. Well, there's two cases on the agenda tonight. We'll take them one at a time in the order that they're listed actually in the Repass Road subdivision and then the sewer. Connection waiver request for appeal. But for each case, I will start by asking staff for that case to summarize their staff report, copies of which are available on the county's website. Then the applicant for that application will have or appeal will have the opportunity to present their proposal and respond to the staff report. Then, if anybody else wants to testify about the application, whether in support, in opposition or with questions or concern may do so. Once everyone has had an initial opportunity to testify about an application, I will give staff and the applicant alone the opportunity to respond to the testimony that was offered. If the responses include any new evidence, I will give everyone a chance to respond to the new evidence. Otherwise, I'll close the public portion of the hearing and announce what I'm going to do without taking further public testimony. It is important that all parties make their best case to me. My decisions are final for purposes of the county but may be appealed to circuit court. However, the court generally excuse me, superior court, wrong side of the river, the Superior Court generally will not allow new testimony and evidence on appeal. They'll decide any appeal based on the record before me. So if you feel it's important that myself or any future decision maker knows something about this application, you need to make sure it gets into the record before me in order to preserve your right to appeal. Excuse me? You or someone expressly representing you must testify orally or in writing before the close of the record. And in order to raise an issue on appeal, someone must have raised that issue before me with enough specificity that everyone can understand what the issue is. If you feel you need more time to prepare, you can ask me to hold the record, open or continue the hearing. If I hold the record open, you'll have the opportunity to submit additional written testimony and evidence before I make a decision. I continue the hearing. We can come back and do this again at a later date. For all cases on the agenda tonight, it's county policy. I will hold the record open for an additional week, at least for submittal of additional additional testimony and evidence from anybody. But if anybody wants me to hold the record open for a longer period or to continue the hearing, you must make that request before the close of the hearing tonight and provide some support for why you can't submit at the hearing tonight, whatever you would want to submit during the Or during the next week by that couldn't be submitted during those periods rather than continuing or holding the record open for longer period. When you testify, please begin by stating your name and full mailing address. Please spell your last name so I get it right. Although a lot of people's names appear on my screen printed out, so it's easy to do that. Not everybody does. That testimony is limited to 20 minutes for the applicant for each case, and three minutes for the general public. Also, please don't repeat testimony offered by yourself or earlier witnesses, and testimony should be relevant to the approval criteria which are set out in the staff report. That concludes my introduction. Staff will give us an overview of the online process so everybody understands how you can indicate if you want to testify. >> All right. >> Thank you, Mr. Examiner. For everyone participating in tonight's hearing, if you wish to testify about a specific agenda item. Staff asks that you raise your hand so that we can gauge who wishes to testify. If you are a call in user, you can dial star three. If you are a web participant, you need to click the hand icon located in the lower right hand corner of your screen or next to your name in the list of participants. Here is a graphic showing where you may find the hand icon shown by the Red arrows. You May 1st need to turn on the list of participants. You can do this by clicking the participants button shown by the purple arrow. The hand icon locations are indicated by the red arrows. Once you have given your testimony, we would ask that you put your hand down. You can accomplish this action by either clicking the hand icon again or dialing star three again. We will also ask everyone to keep their microphones on mute at any time they are not speaking. I will show you how to do that in the next slide. Prior to the close of each agenda item, we will open all microphones for everyone in attendance to ensure that everyone who wants to testify has the opportunity. Please, please be aware that any noise in your personal environment will be broadcast at this time. If you miss your opportunity to testify for some reason, the record on each case will be open for a period of time so that you can submit your testimony in writing. Finally, the chat function has been disabled for public records purposes. As I mentioned, we ask everyone to keep their microphones muted at any time they are not speaking. There are a few ways in which to mute yourself. If you are a web user and are using your computer for audio, you can simply click the mute button at the bottom of your screen or next to your name in the list of participants shown by the Red arrows. If you are a web user and using a phone for audio, you can either mute yourself on your computer or use your phone's mute capability. Phone only users can use the mute capability on their phone. We would ask that you stay muted any time you are not speaking. Thanks, everyone. >> Mr. Kitterman, it's my understanding that the county is not doing the open mic at the end after all. Any more? I thought it had been removed from the script. It just didn't work very well. >> Okay, perfect. Yeah, I'll have to adjust that. >> I will not. >> Be doing adjusted. All right. Fair enough. Okay. And did you want me to just jump into it then, Mr. Examiner? Okay, perfect. All right. Case here before us. Okay. Good evening, Mr. Examiner. County staff and the general public. For the record, my name is Joe Kinsman, and I'm the land use planner for this project. The name of this project is the Repass Road Subdivision. The case before the hearings examiner this evening is a request to divide 0.73 acres into a 16 lot attached townhome subdivision utilizing the narrow lot standards and is located in the R 40. >> Mr. Kinsman. Did you intend to change your PowerPoint presentation? Is still the hearing procedures. Were not seeing the subdivision yet. >> There we go. Right. I should have been right there. Good catch. >> No problem. >> All right, here we go. Utilizing the narrow lot standards in the R 43 zone. And as I said, my name is Joe Kinsman and I am the review planner for this project. Alistair Dawson is the review engineer. And Mr. Craig Caudill reviewed this for transportation concurrency. I know we do have Mr. David Jardine here as well this evening. That can speak to that. And Jason Noble reviewed this for the fire Marshal's office. Tonight. During our presentation, staff will provide an overview and summary of the proposal, identify any major outstanding issues or concerns, and make our recommendation to the examiner. On the vicinity map. The subject property is identified by the black dot or reference. North is oriented to the top of the page. In this map, we can see that it lies west of highway 99, south of northeast 78th Street and north of northwest 68th Street. The zoning map provides a closer look at the parcelization of the subject and abutting lots. The site is highlighted in red. The site is zoned R 43, with the adjacent sites being Keesee to the north and west and R 43 to the south and east. >> It says our 50 on your map. I assume that's just an error. >> Yeah, I was going to address that the. Since the update in code, the GIS packet was updated. But this. This site is specifically in R 43 are vested to those standards. So. Okay, this slide is an aerial view of the subject area with the subject property lines in red. In this view we can see the surrounding developments in the area. We can also see northeast Hazel, Dell Avenue to the west to the west and northeast Repass Road to the north. This slide shows the proposed plan for the site. On this plan, North is oriented to. The top of the slide shows the two accesses coming in off of northeast Repass Road and Hazel Dale Avenue. There to the west. Okay, and on the staff report page. The fully complete application was submitted on January 13th of 26 and after some early issues, a case. The staff report was final and issued to the examiner on November November 9th of 2026. As far as our recommendations, staff recommends approval of this proposal subject to the findings and conditions within the staff report, which is exhibit 43. Here is the proposed plan again for your view, Mister Examiner. >> Okay. >> I'll stick around for any questions. >> A couple of appear to be typo on the first page under the request it lists. The site size is 0.43 acres. I understand 0.73. That was, I assume, just a typo. >> Yes. Correct. Yep. >> Okay. And page seven. Under three B. It says the applicant is proposing on street parking at 20 residential units proposed. I understand they're proposing 16 now, correct? >> Yeah. It was revised throughout the early issue process and we went down to 16 lots. >> Okay. And then I understood. I got an email today that this one was going to be continued because of a notice issue. I was there was that how was that corrected the notice. >> The affidavit had the, the date on it that met and we didn't catch that in time. So okay. Did it did in fact meet the 30 days based on that affidavit? >> Great. Thank you. I don't have any other questions, Mr. Kinsman. Thank you. Is the applicant here represented for this one? >> Can you hear me? Yep. Yeah. My name is Paul Williams. I'm the engineer for the project. My mailing address is 6168 Northeast Highway 99, suite 103, Vancouver, Washington, 98665. Let me give my email too, because if there are some neighboring has additional questions, you know, they're free. They're free to either call me or email me. So my telephone number is area code (360) 931-3122. My email address is Paul Williams pe@gmail.com. I have reviewed the staff report. I do not have any issues with the conditions of approvals. I do appreciate staff's time in putting this all together. I have received a couple of phone calls from the neighbors, and most of them, of course, is just parking. But if any of the neighbors have any additional questions, they feel free to reach out to me. But I have no further questions. >> Thank you, Mr. Williams. Is there anybody else who'd like to say anything about this application, whether in support, in opposition or with questions or concerns? If so, please click on the Raise Your Hand button now. And Mr. Dayley, let me know if we get any raised hands. >> We have A Travis B. And I just sent Travis B. You should be able to unmute yourself. Oh, looks like you got it. >> Can you hear me? >> Yep. >> Okay, good. Travis Browne, address is 453 North North East 71st Street, Vancouver, Washington, 98665. And this is in a pose, I guess, a puzzle to to this particular project, mostly due to the parking on Repass Road. I'm glad to see that the project has been reduced in scope to 16 units instead of 2020. Was was quite a eyesore looking at the project earlier, but I do believe that the parking needs to be removed from on street parking to on lot parking. No on street parking should be allowed in this project about 1 to 3 days a week. The employees who work across the street, across Hazel Dale Avenue Park along the street where that bank is, across the site, across the street. >> So I, I'm not familiar with the area West, east, North, South, west. >> So west of this site, across Hazel Dale Avenue, there's a government agency that employs a large number of employees, and several days a week, they don't have enough space within their lot to park. And they park on the street on Repass Road, across from this site. As it stands, when they park there, if there is a vehicle heading out of the neighborhood or into the neighborhood, there is not sufficient space for two cars to pass by. The application stated that there was 28ft of space from site to site across Repass Road. I actually took a tape measure out there. I measured 25.5, not 28. Keep in mind this road is used for not just the fire services, but the school busses that leave the Hazel Dell Elementary School that neighbors this area, as well as an RV repair site that's just down Repass Road. All of these vehicles would not fit with two cars on opposite sides of the road. And that's specifically my opposition for this particular project. I'm happy for the houses to be there, for there to be parking, ample parking on the site itself, but I, I cannot accept there being on site or on street parking for this project. >> Thank you, Mr. Brown. The applicant will widen Repass Road to accommodate that additional. So they. It will be wider. I'm not sure exactly how much wider. I'm going to ask the applicant and or staff to tell us, but. Excuse me. >> Excuse me. >> But that I just wanted to give you that information. >> Thank you. Yeah, that was that was my entire piece. Like I said, there's, there's issues with being able to pass through there with, with cars even on one side. So having two would make it very difficult for us. And again, remembering this is where fire service comes through. This is where school busses come through. This is where RVs go. >> To. >> That business. >> The county code, as adopted by the county Council, allows 28 foot wide streets with parking on both sides. It does narrow it down to effectively one through lane, but that's has a it serves a traffic calming function. It forces drivers to slow down. It also creates some congestion. But balancing that, the County Council determined that that was the correct balance was 28ft. It's the less pavement, so less impervious, less runoff. But that's that's what the code allows is parking on both sides of 28 foot wide streets. So I can't prohibit them. >> Thank you. >> Thank you, Mr. Brown. Any other raised hands? Anybody else want to say anything about this application? >> No, I don't see anybody else right now. Nobody else is great. There's not many people there. So. Yeah. >> Thank you, Mr. Daviau. Mr. Kinsman, anything further from county staff? >> No, Mr. examiner, that is everything that we've got. >> Mr. Williams. >> Hopefully you can hear me. >> Yep. >> I believe this gentleman reached out to me. I know when we're looking at the drawings or at 1 to 40 scale, but what we're actually doing at the intersection itself, because Repass is by county standards, is local access. And you're correct on the dimensions on this, but we're tying into an arterial street. So as we as we reconstruct, we're actually tapering it at the intersection. Of course, adding the appropriate radius for an arterial to accommodate RVs and busses. So if the gentleman can either email me or contact me anytime, I maybe can send them a zoomed in drawing to see how that intersection looks looks like, because once again, at the 40 scale, it's really hard to tell the transition widening as we get to Hazel Avenue. The on street parking requirement is a compact design. So this is like an additional. So not only do we need to have on site parking, for example, like the driveway and garage, that narrow lot standards require that we provide additional off street parking and local access does qualify for meeting that standard. So that's pretty much it. And so if the gentleman wants to reach out or anybody wants to reach out to me, feel free to do so. But thanks. >> Thank you. Mr. Mr. Williams. With that, I'm going to close the hearing. I'll hold the record open for a week until. December 1st for any if anybody wants to submit additional written testimony and evidence, anything you want to submit has to be physically received by the county by 5 p.m. on December 1st. You can send it to Mr. Kinsman. I will try and get my decision out within two weeks after the close of the record, which would be the 15th. I'll try and get my order out by December 15th and I will send my decision to the county. The county will send it to parties of record. So anybody who has testified or who does so in writing during the open record period will be sure and receive a copy of my decision. If you don't want to testify, but you want to get a copy, you can just contact Mr. Kinsman and he'll make sure you're on the list as well. But that concludes the hearing on that item. We'll move to the next item on our agenda. OLR 2026-00120. I hope I'm pronouncing that right. Sewer waiver. I'll just take a second to switch exhibits here. Same staff. >> Correct? Yeah. >> It's me. >> Whenever you're ready then, Mr. Kinsman. >> All right. Let me. Like you said, I'm gonna switch things over here real quick. Okay. There we go. Perfect. Okay. Good evening, Mr. Examiner. County staff and the general public. For the record, my name is Joe Kinsman, and I am the county land use planner representing the permit center for this project. The name of this project is the Right Writer sewer waiver appeal. I'm sure I botched that as well. Mr. examiner. The case before the hearings examiner this evening is a request to overturn a denied sewer waiver under Clark County. Permit number 0LR202600120. As I said, my name is Joe Kinsman and I'm the review planner for this project. The Permit technician and permit center lead that worked on this project were Joe Jameson and Debbie Miller. Tonight during our presentation, staff will provide an overview and summary of the proposal, identify any major outstanding issues or concerns, and make our recommendation to the examiner. On the vicinity map. The subject property is identified by the black dot. For reference, North is oriented to the top of the page. You can see on this map that it lies south of the Clark County Fairgrounds, east of northwest 11th Avenue, west of Interstate I-5 and north of northwest 149th Street. Here we have the zoning map, which provides a closer look at the parcelization of the subject and abutting lots. The site is highlighted in red. The site and surrounding parcels are zoned R1 ten. On this map, you can see northeast 151st Street ending at the West property line. I bring that up because it is also where the current utility line runs to and abuts. Next we have this slide as an aerial view of the subject area with the subject property lines in red. In this view we can see the surrounding development in the area. You can also see northeast second Avenue to the west and northeast fifth circle to the east. On our staff report details. The fully complete application was submitted on August 11th, 2026. Staff requested additional information on August 20th of 2026, and the applicant requested to proceed with the submitted information on September 4th of 2026, which is in the record as exhibit number four. The appeal was then was subsequently submitted on September 17th of 2026, one day prior to the 14 day appeal period, and then the staff report was issued to the Examiner on November 9th of 2026. This proposal, as far as the project issues, the proposal was denied on the grounds that the information submitted did not demonstrate that the public sewer would have to be extended more than 300ft. As the utility review letter identified a point of contact at the subject Parcels West Property line. There are no intervening landowners from whom the applicant would need to obtain permission to establish the public sewer connection, and the applicant has not provided evidence demonstrating that the subject, parcel or any intervening property contains natural or man made obstructions that would make connection to the public sewer system prohibitively expensive. And lastly, when the additional information was requested, requested to work towards an approval, the applicant requested to proceed with the submitted information that they had already submitted. As far as a recommendation, staff recommends upholding the previous denial and the record is exhibit one D for the reasons listed in the staff report, and that is the exhibit one D. The previous denial and the current staff report on this appeal as exhibit five, and staff will remain around for any questions you may have. >> Okay. On page three. AM I correct that you say the county you say a lot? Is the county only requiring that they connect the Adu not extend sewer to the north and south? Is that correct? >> Correct. Yes. We only require the connection the purveyor requires the extension. Beyond that. >> Can the applicant connect the Adu without complying with the north south connection requested by the sewer provider? >> I don't know, that would be it's the requirement is from the purveyor. So I don't know if they would allow the connection without going straight through. >> Okay. So any taking issue would be before the sewer agency not imposed by the sewer agency, not the county. Is that correct? >> That's correct, Mr. Iasmina okay. >> And then just one appears to be a typo. The first full paragraph on page three. But last line says. Not the extension the purveyor requires to the east property line. I assume that was intended to say north and south. >> Correct? Yeah. If they're requiring that connection point from the north to south and the. Yes, that is for sure a typo. >> Okay. Thank you. Just wanted to get that on the record. Yes, sir. Mr. Erickson, I understand you're representing the applicant, I am. Good evening. >> Mark Erickson at 110 West 13th Street, Vancouver, Washington, 98660. May I just begin? >> Yep. >> The applicant's or. Excuse me. The appellants assign error to the land use decision. Chapter 4370 Keesee ordinance 2020 0308. And any authorizing statute, all of which erred in denying or authorizing denial of appellants. Application for Sewer waiver. OLR 2026 00104, which resulted in a taking of appellants property without compensation and deprivation of appellants rights to procedural and substantive due process protected under the fifth and 14th amendments to the United States Constitution and Article one, sections three and 16 of the Washington State Constitution. The appellants also assign error to the land use decisions. Violation of Keesee 437010, which provides inside yugas and rural centers served by the public sewer. Connection to public sewer is required for any new structure, which has potential to increase sewer effluent or additions to existing structures, which have potential to increase sewer fluid. With you pump this thing into the septic system. It doesn't increase sewer effluent on the public system. >> That's not what the code says, is that it just says increased sewer effluent. >> That's all. >> It says into the public system. >> That's all it says, right. >> But it doesn't say increase sewer effluent into the public system. You're increasing sewer effluent by adding a bathroom and that other things in this Adu that's going to it's going to go into the septic instead of the sewer, but it's still sewer effluent. >> That's correct. My clock stop when you start asking questions like that. >> Yeah. >> We'll give you some more time. Yes. >> This the Superior Court has inherent authority to review administrative decisions to determine whether the decision or act complained of was or involved, or act complained of, was or involved. Arbitrary and capricious. Illegal actions chase by Spokane Valley fire. The term arbitrary and capricious was defined by the Washington Supreme Court as willful and unreasonable action, taken without, taken without regard to, or consideration of the facts and circumstances surrounding the action. Where there is room for two opinions and action taken after due consideration is not arbitrary and capricious, even though the reviewing court may believe it to be erroneous. King County Washington State Boundary Review Board In reviewing conditions of approval, the Washington Court of Appeals has held that a government body is failure to enter findings of fact and conclusions of law in a rezone. Action constitutes arbitrary and capricious action, while the arbitrary and capricious standard is applied to discretionary acts, questions of law are reviewed de novo. The present case invokes questions of constitutional law regarding the deprivation of appellants, rights to compensation for property, which is taken for public use and deprivation of substantive and procedural due process, and the Subdivision Act was amended laws of 1995 to provide that any decision, approving or disapproving a plan shall be reviewable under chapter 3670CRCW the standards for review of land use decisions are provided in the Land Use Petition Act as be erroneous interpretation of law C not supported by evidence that a substantial. D clearly an erroneous application of law to the facts and f violates the constitutional rights of the parties seeking relief. OLR 2026-00104 is unconstitutional, constitutes arbitrary and capricious and unlawful action, and results in the taking of property. As discussed, the Fifth Amendment to the US Constitution, applied to the States through the 14th amendment, provides in pertinent part, nor shall private property be taken for public use without compensation. The Washington Constitution provides the same right as decided by Cintra, the city of Seattle, which was cert denied by the US court. The Washington Supreme Court and Presbytery held that the determination of whether to apply the test for takings or substantive due process depends upon a threshold inquiry first, whether the challenged regulation safeguards the public interest in health, safety and the environment, or the fiscal integrity of the area. Secondly, the court should ask whether the regulation destroys one or more of the fundamental attributes of ownership the right to possess, the right to exclude others and and to dispose of the property. The second prong of this initial inquiry must be answered in the affirmative. In all cases involving physical occupations of land, as noted by the US Supreme Court in Loretto teleprompter, Manhattan, a permanent physical occupation authorized by government is a. Taking without regard to the public interest that it may serve. This rule was restated by the US Supreme Court in Lucas v South Carolina Coastal Council in clarification of the distinction between occupations of land and mere regulations of use in Lucas, we have described at least two discrete categories of regulatory action as compensable without case specific inquiry. Inquiry into the public interest advanced in support of the restraint. The first encompasses regulations that compel the property owner to suffer physical invasion of his property in general, at least without at least with regard to permanent invasions. No matter how minute the intrusion and no matter how weighty the public purpose behind it, we have required compensation. Now, although the Loretto decision dated 19 years earlier, the Washington Supreme Court seized upon Lucas's requiring a reordering of the presbytery threshold analysis that was Lamont Takach. By the way, all the cases I'm naming are fully cited in the brief. In other. In the words of the court, we must analyze at the outset of the presbytery test whether the fundamental attributes of ownership are impaired through physical invasions or total takings, without engaging in any harm versus benefit analysis or examining the legitimacy of the government interest again. Vermont in 1987, the US Supreme Court coined the term essential nexus to describe the required relationship between development conditions and the state interest served. Nolan the California Coastal Commission. In Nolan, the dedication of a beachfront easement was unconstitutional as the Constitution as a condition for construction, which would not interfere with the public's ability to traverse the beach. Required condition bore no nexus to visual access, which was blocked by proposed construction. Elaborating upon the Nexus requirement, the court reasoned that unless the permit condition serves the same governmental purpose as the development ban, the building restriction is not a valid regulation of land, but an out and out plan of extortion. That's Nolan. In 1984, the US Supreme Court added a second requirement to the analysis holding that the governing agency must make must make some sort of individualized determination, that the required dedication is related, both in nature and extent to the proposed developments. Impact. That's Dolan v City of Tiger. Although the required nexus was satisfied, the court found that the city had exceeded its authority in requiring dedication of a greenway when an overlay prohibiting development would suffice to protect the floodplain. The difference to the petitioner observed the court, is the loss of her ability to exclude others. In the present case, the land use decision relied upon anticipations of future development without any supporting findings. The Development Review Decision and Abbreviated Staff Report exhibit A at three and the pages entitled Development Report Sanitary Sewer Needs Serial number 185522-000. There are undeveloped parcels in the basin that are expected to need sewer service in the future. Service of these parcels will be from existing sewers to the southwest. For this reason, the district is requiring that sewers be extended along the west property line within Northeast Third Avenue, private to the north and south Marchel boundaries. Therefore, the permit condition cannot serve the same governmental purpose as development ban. Hence, it lacks the essential nexus required in Nolan. A development ban would not require any sewer extension whatsoever. However, the error of the Land Use Decision chapter 437010 Clark County Code Ordinance 2020 0308 and any authorizing statute is evidenced in the discussion appended as part of the decision, which reads, this policy and specification benefit the entire community by requiring each property to pay their equitable share, by servicing their entire property and constructing a line to the edge of their property for the next developer extension to proceed by all developments participating in this matter, developers are only required to serve their own development. This equitably impacts one development at a time. That was the development review Decision and Abbreviated Staff Report exhibit 83. To the contrary, each property is serving one or more neighboring landowners based upon unsupported estimates of future neighboring impacts. This is precisely what the takings Clause prohibits in Burton v Clark County. The government must show that its proposed solution to the identified public problem is roughly proportional to that part of the problem that is created, or exacerbated by the landowners development. We assume that the government may sometimes rely on the future as well as the present, when attempting to establish these relationships. At minimum, however, it may not rely on the future unless the record furnishes a basis for inferring what the foreseeable future holds. Well, the record in the present case includes no basis for determining if or when neighboring properties will develop, or what future requirements might be, even if the decision did include some basis for inferring the future, the requirement of extending sewer access to neighbors is a permanent physical occupation authorized by government, which constitutes a taking without regard to the public interest it may serve. Moreover, the problem be remedied. Neighboring access is not created nor exacerbated by the petitioners property by the appellants property. In addition to takings claims, appellants allege that the deprivation of their rights to substantive due process, arguing conditions of approval are not reasonably necessary to legit to achieve a legitimate public purpose and are unduly oppressive. In 1987, the Supreme Court of Washington ruled that even regulations, which are insulated from takings challenges, must withstand the due process test of reasonableness. That's a right in the state. In 1989, the court elaborated on this doctrine and adopting the following analysis to determine whether the regulation violates due process, the court should engage in the classic three prong due process test and ask one whether the regulation is aimed at achieving a legitimate public purpose. Two, whether it uses means that are reasonably necessary to achieve that purpose, and three, whether it is unduly oppressive on the land owner. Again, that's presbytery. Now, in response to the staff report and recommendation, Clark County's institutional confusion is reflected throughout the staff report and recommendation to the hearings examiner dated November 9th. Staff requested additional quotes to show compliance with Clark County code 437010C2C2. That intervening property contains natural or man made obstructions such as deep canyons, elevation changes and solid rock impediments, which make public sewer extension prohibitively expensive or undesirable. Following this request, the applicant requested to proceed with the information submitted. Staff then had no option but to deny the applicant's request for a sewer waiver due to insufficient evidence that code compliance was reached. We're not arguing that the code compliance was reached. We're arguing that the code compliance is unconstitutional on its face. Elected officials are not allowed to legislate around the Constitution, giving themselves powers prohibited by the takings of due process clauses. Staff's conclusion of no option to deny appellants request for a sewer waiver. Evidence is misunderstanding of the law, which the county is authorized to enforce. As explained, the Washington Supreme Court in Presbytery held that the court should ask whether the regulation destroys one of the more fundamental attributes of ownership the right to possess, the right to exclude others, and the right to dispose of property. As noted by the US Supreme Court in Loretto, a permanent physical occupation authorized by the government is a taking without regard to public interest that it may serve clearly. In the present case, the required sewer extension will preclude the right to possess and exclude others from the property it occupies. Just as clearly, the sewer extension is a physical occupation of appellants property, the staff report argues as follows. In response to appellant's notice of appeal dated September 16th, the appellant also states that by denying the sewer waiver, the county is taking appellants property. This is inaccurate, says the staff report. The county has not requested or taken any action to transfer land. Actually, the words taking and condemnation refer to different governmental actions. Takings involve the physical occupation of private land ordered by government entities, while condemnation involves the transfer of title to government or public entities that the government's behest takings do not require the transfer of title. They occur at any time. Occupation of private property is ordered by government entities in Lucas, the court said that we have described at least two discrete categories of regulatory action as compensable, without case specific inquiry into the public interest advanced in support of the restraint. The first encompasses regulations that compel the property owner to suffer a physical invasion of his property. In general, at least with regard to permanent invasions. No matter how minute the intrusion and no matter how weighty the public purpose behind it, we have required compensation. In the second situation in which we have found categorical treatment appropriate is where regulation denies all economically beneficial or productive use of land. As we have said on numerous occasions, the Fifth Amendment is violated when land use regulation does not substantially advance legitimate state interests or denies the owner economically viable use of his land. Now, in the present case, OLR 2026, 00104 would require the invasion of a sewer extension on appellants property, which is clearly prohibited. In 1994, the US Supreme Court required an individualized determination that the required dedication is related both in nature and extent to the proposed developments impact. In the present case, no such determinations, no such determination has been made, nor could be made because the proposed development of neighboring lots where where that is, where that ever to occur is the sole reason given for the required dedication. This takes us back to to staff's tortured attempt to satisfy the elements of takings law with an equal burden upon all development. Reading from the Development Review Decision and Abbreviated Staff Report, exhibit A at three. This policy and specification benefit the entire community by requiring each property to pay their equitable charge, equitable share by servicing their entire property and constructing the line to the edge of their development for the next developer extension to proceed. >> But Mr. Kinsman said that's not what the county's requiring. They only are requiring you to connect the Adu. They're not requiring you to extend north and south. >> The staff report says they are that the provider is, and I need to make. >> My order. >> May want that, but the county can't require that. >> You're right. And. >> This might encourage you to make that decision. I'll just finish the a couple pages I have left. >> Yep. Go ahead. >> Hence, the present case represents an unconstitutional taking from all development owners within the area in one fell swoop. What the county does not seem to understand is that proportionality required in takings law is not among various landowners, but between impacts and exactions upon a single landowner. In evaluating petitioner's takings claim, we must first determine whether the essential nexus exists between legitimate state interests and permit condition exacted by the by the city. The county. That's Dolan citing Nolan, which had elaborated upon the Nexus requirement as follows. Unless the permit condition serves the same governmental purpose as the development ban, the building restriction is not a valid regulation of land, but an outand out plan of extortion. The Court and Dolan discussed the second part of the takings analysis as follows. We think in terms such as proportionality, Bestine capsules, what we hold to be the requirement of Fifth Amendment. No precise, precise mathematical calculation is required, but the city must make some sort of individualized determination that the required dedication is related, both in nature and extent, to the impact of the proposed development. In the present case, the exact sewer extension is related, neither in nature nor extent to the proposed development of applicant's appellants property. It is not related in nature because the sewer extension would not serve the same governmental purpose as development ban. If development were banned, no sewer extension would be required whatsoever. Neither is the action of a sewer extension related in extent to the impact of the proposed development. Because service to the proposed accessory dwelling unit would require only connection to the existing septic system, which is what we want. And it sounds like what you have said is that the provider is still requiring that we hook up to their public sewer. If that is the case and the county is not requiring that, we will still supplement the record doing what I think is one week that will follow tonight. >> Okay. The Nexus issue, assuming, you know, as the county said, they're only requiring you to connect to the Adu, they're not requiring north south. So how is there no nexus that this you're creating an Adu that's going to generate septic sewer effluent that needs to go somewhere, either septic system or sewer County requires that it go to the sewer, but it's only going to serve that unit, that new unit. So it seems pretty clear Nexus there. >> There is no Nexus. Well, there's no proportionality because we have the ability to serve more bedrooms within the house. But we're not doing that. This Adu is going to be for the owner's mother whom he takes care of and could could put her in a house, but she prefers to have her own separate residence. If he could, if we could serve it with the existing septic, then there's no proportionality. By making us attached to public sewer. >> Okay, my note down there. On proportionality, you gave us an estimate, I think it was 80. It was some $80,000 something in that area. >> We have that estimate. We provided it. >> Yeah, I read it. I also saw your your I read your, your memo, your brief today too, but that was to extend to connect to the Adu and to extend north and south. How much was it going to be just to connect to the Adu versus how much is it going to cost to connect to the existing septic. Yeah, the septic system, which is quite a ways north, depending on where the sewer line is, it's hard to tell from these plans. The existing sewer line, it may be much just, you know, linear feet of pipe, maybe shorter route. So how is it disproportionate? I understand your argument about the capacity of septic. I'll consider that. But as far as just the cost of installing installation, it seems like it might be cheaper or similar. At least. >> We need to get a separate bid on that. I don't have it, but I think a week is plenty of time. >> Okay. Sorry I can't read my own writing. I think that that was the only questions I had. Thank you, Mr. Erickson. >> Thank you. >> Is there anybody else who'd like to say anything about this application? I'm waiting for any raised hands, but I don't think I expect any. But just in case. >> No. Oh. Well, one of our panelists just raised their hand. Okay, writer. But then he lowered it. Okay, no I didn't. >> Oh you didn't. Okay, Mr. Ryder. >> He's the owner. >> Yeah, I understand if he wants to say something great. >> Yeah, my my statement or. >> Or question is, can I could. >> You state your name for the record, sir? Oh, sorry. >> Chris Ryder, owner of 15015 northeast 21st Avenue. Sorry. Northeast third Avenue. Excuse me. The Vancouver, Washington, 868688685. I'm getting there. >> Your address is in the record that you're the applicant. >> So my my statement or question is concerning the the Adu connecting directly to the sewer. My understanding and our understanding was that it would trigger the house needing to also go to sewer. So that's where a lot of the existing cost comes from, where the Adu is not going directly to sewer. It would it would require the house to tap into sewer and then the Adu tap to the house to the sewer. >> Okay, I'm going to ask staff, but it's my understanding that's not what the county is requiring, and I don't see how there would be any Nexus. Yeah, Nexus there because the existing home is existing. The Adu is new. So that they could they could make you connect that. Okay. But I don't see how the county can require you to connect the existing home. And I don't think the county is requiring that. But I'll ask the staff to confirm that. >> Okay. >> Thank you, Mr. Ryder. Mr. kinsman, any is the county requiring that they connect to existing home? >> No, the current code only allows for connection to the proposed Adu. The existing home can remain on the system. It's on. That. I did have one comment in regards to the the timeline with the the open record, the the legal response that we received, we received that, I believe, yesterday. >> So Mr. Erickson's brief. >> Correct. Yeah. So we'll need about like two weeks, I think, to prepare a legal response to that. >> So then do we get one week after he prepares his response? >> Absolutely. >> Which takes that out to the 22nd, 21st. >> My calendar, because I don't know, can't see that far either. 24th, second. >> Well, it's a Monday. >> Yeah, it's a Tuesday. The 22nd. Sorry. Yeah. So what what unless you have any want a different schedule, I would hold it out for two weeks. Make sure I'm looking at this. Right. Yeah. Until the 14th of December for the the county to submit their legal argument and until the 21st of December for the applicant to submit your final argument and any new evidence you want to submit. Mr. Erickson, if you could submit that by the 14th. >> Wouldn't two weeks be the 8th of December? Mr. examiner. >> I'm sorry. You're right, you're right. Yes. I keep looking at Monday. >> It'd be. >> The morning I was having a hearing on Tuesday is throwing me off. Yeah. Clark County hearing on. Okay, let me rephrase that. I will hold two weeks would be the 8th of September. And then the applicant would have the 15th of December. >> Got it. >> But Mr. Erickson, if you can get your new evidence in within the first week, as you said, then the county would have a week to respond and then you'd have the final argument. >> I will. Ask for you consultant to do that. >> Okay. And anything else you want to add? >> No, I don't think I need any more time than that. >> Okay. With that, I will close the hearing. I will hold it open, make sure I'm right here, Mr. Darvelia, until the 8th of December. Excuse me, the 1st of December for Mr. Erickson's or his client to submit any additional new evidence until the 8th of December for the county to respond to that. And anybody, any public who wants to respond to the new evidence and for the county to respond with legal argument, and then until the 15th of December for the applicant to submit a final written argument for that, any new evidence at that point, then I'll try and get my decision. I will get my decision out by the 5th of January because I leave the next day for vacation, so I will get it out before I leave, and that's what I will do. Anything anybody wants to submit has to be physically received by the county by 5 p.m. you can send it to Mr. Kinsman. He'll forward it on to me. And that concludes our hearing. Thank you all. Thank you. Have a good evening. Happy Thanksgiving to everybody.