Good evening everyone. I'd like to call to order the September 10th, 2026, hearing of the Clark County Land Use Hearings Examiner. My name is Daniel Keirns, and I'll be presiding over tonight's hearing, which consists of five agenda items. I'll go through them in a little bit, but let me begin with a brief introduction to me and an explanation as to how the process is going to work this evening. For each of these five hearing items. First of all, I and one other examiner we serve by appointment from the Board of County councilors to review and decide development proposals in unincorporated Clark County. We. We do that by reviewing the record. All the written materials, the application, all the agency and staff comments, plus all the public comments. And finally, we convene a public hearing such as this to take public testimony. Before we close the record. And once the record closes, we issue our decisions approximately two weeks after that happens, after the record closes. In each of these, we are required to apply the applicable approval criteria. They control our decision in each of these cases, and those are the standards that were in place in the county's Unified Development Code. On the day each of these development applications came in. And so that freezes in time. The set of approval standards that control my decision and control the fate of each of these applications. And if you have any question as to what those approval standards are for the development that you're interested in, consult the staff report. The staff report goes through those standards and makes a recommendation as to whether, in staff's view the application meets or doesn't meet the approval criteria. That's my ultimate job, is to make that decision as to whether, in fact, they do meet those criteria in convening this proceeding and making that decision, I'm required to be objective and impartial, and I believe that I am with all five of these items. I don't have any business or personal or familial relations with any of the the applicants or any of the parties that have weighed in on each of these items. What I know about each of these cases is what I have gleaned from the record. I've had my record for about two weeks now on each of these, and I as I mentioned, I don't have any particular biases either. So if anyone has any questions or wishes to challenge or question me about any of my potential conflicts of interest or ex parte contacts, feel free to do so. During the public testimony portion of tonight's hearing. With regard to each of these items, though, here's the process that we're going to follow. We'll take them in order in which they appear on the agenda. Let me run through them quickly. First is Cresap Meadows subdivision. That's PLD 2026-52 and then is 39th Avenue Subdivision. PLD 2025-94. Then Hartwood North Subdivision as PLD 2025-114. The fourth one is O'Donnell Estates Cluster Subdivision. PLD 2025-8, and finally, Pleasant Wood North Subdivision. PLD 2026-21. So we'll take those in order in which they appear. We'll begin with a staff report, which is a verbal rendition of the written staff report that was issued prior to tonight's hearing. On each of these items. After the staff report, I'll take the applicant's presentation. The applicant you can you can assume I'm generally familiar with the proposal, but there are a couple of things I really want to know kind of up front from you about about the project. First of all, what is the current version of the plan before us tonight? So I and everyone else that's zooming in on this knows what is the latest version of the proposal. Second, I need to know your. If you have any corrections or objections or changes you would like to see in the staff report, either in the findings or the staff's recommended conditions of approval. Give me those with specificity so that I and staff and everyone else can understand exactly what changes you want to see to the staff report. And finally, in all of these, I want the applicant to keep track of the testimony that comes in and to be prepared during your rebuttal, to respond to the testimony that is presented by public. And I say that because a lot of times the testimony that I get from the general public comes in the form of questions about or assumptions about how this project is going to work, how it's going to impact the neighborhood, how it's going to impact neighbors, how the stormwater system works or doesn't work. Those sorts of questions are often best addressed by the applicant's team, so be prepared to respond to those things during your final rebuttal. So after the applicant's presentation, I'll take testimony from anyone else in favor of the proposal. After that, I'll take testimony from anyone with neutral testimony or questions. And finally, I'll take testimony in opposition to the proposal. After that, I will take the the applicant gets final rebuttal. And all of these cases, the applicant gets the last word because the applicant has the burden of proof. That is the burden of proving that they have met all of those approval criteria that I mentioned and are addressed in the staff report. So after the applicant does their final rebuttal, I turn to staff to see if they have any additional comments they would like to share. Based on the public testimony that's come in. And it's my typical habit then to close the record, unless someone has requested a continuance or that the record be kept open. I think in all of these, though, the county's notice said that the record would be kept open at least one week for each of these items. So that puts us out at least a week before the record closes. And that's important because for anyone who wants to get anything into the record before me, for me to consider, that ends your chance to raise new issues or to present evidence. Also, that ends your chance to make your record for potential appeal. My decisions are the final decision at the county level. They are appealable when they are. When they come out to Clark County Superior Court through the Land Use Petition Act. But to bring a LUP appeal, you have to participate either orally or in writing before the record closes, and you have to raise before me any issue that you want to preserve for that appeal. And you also need to present to me any evidence or documents or memos or anything that you want to rely upon in a subsequent appeal. So it's important for all of you to understand when the record closes on each of these items. >> Let's see. >> Here are some basic do's and don'ts for testifying tonight. First of all, I think we're going to have limitations on time because we have so many proposals before us tonight. Five of them. The applicant will give you a maximum of 20 minutes for your primary presentation. Then after that, every any individual that wants to testify, you have three minutes pop to testify. But understand, we take unlimited written comments and memos. And I know that a lot of you who may be tuning in tonight have taken advantage of that and submitted your comments in writing well before this hearing. That's a good thing to do because for a couple of reasons. First of all, it makes a permanent record that no one can dispute about the issues that you raised and the points that you articulated and the evidence that you pointed to. It's in writing, it's submitted to the record. Secondly, I'm a terrible note taker, so I'll sit here and listen to what people say. And while I'm doing that, I forget to write things down. So if you could submit your comments in writing, it really is more effective. When it comes time for me to sit down at my kitchen table and write this opinion, I have your written comments right in front of me, and I can kind of make notes on the written copy. So it's a very effective way to get your issues and arguments before me. So understand you'll have a chance to do that if you haven't already done so following tonight's hearing. But it's not an unlimited opportunity. And we'll talk about those open record schedules before we conclude each of these items tonight, when it's your turn to testify, and we'll get a primer from the staff planner at the beginning, when I'm done talking, you'll get a primer on how to function in this WebEx internet based environment. But basically, when it's your turn to testify, raise your hand. There's a little raise your hand icon, and we'll kind of take everybody in order. And we will unmute your microphone, start with your your name and give me I don't I don't need your mailing address, but you'll need to get your mailing address to the staff planner at some point so that we can provide you a copy of my decision when it comes out. So by participating, you're entitled to a copy of the decision. And that's how we fulfill that obligation. So tell me basically where you live or what's your kind of geographic connection to the development that you're testifying about. So I can better appreciate the impacts that you will be talking about. Then go raise the points that you want me to know about. Remember, limit your testimony to the approval criteria because that's all I can take into account. I'm purely co-driven. None of these cases are popularity contests. I'm. I have to look and decide whether there's sufficient evidence in the record to determine whether each of those standards is met or not, and a general complaint about a development is not going to be sufficient for me to give any credence in that context. So focus on the approval criteria. Also, don't be repetitious. If you agree with something someone has said or that you've said in writing, tell me that and move on to your next point. So for those of you who have submitted written comments, I've gone through most of them. I'm generally familiar with them. Let me know if you have something new or additional to say. And don't. Don't repeat what you've already submitted in writing. If you have new and interesting things to say, submit that in writing at the conclusion of tonight's hearing. You do that by emailing it to the staff planner. So even if you weren't planning to submit written comments, but just give oral testimony, submit your script, submit your notes, make them an exhibit item you're interested in, and then I'll have a copy of that. Remember to raise any issue during your testimony that you might want to preserve for a subsequent appeal, remember to submit any documents or evidence that you want me or a subsequent judge to take into consideration. And if you want more of an open record, then just one week, let me know that and we will talk about the open record schedule. Before we conclude each of these items. So I think that's it. By way of a general rundown on process tonight, if you have questions, as I mentioned, going forward, feel free to ask during the public testimony portion of the hearing. So at this point, we will get a primer on how to function in WebEx. So take it away. Whoever is doing that. >> That would be me. Thank you, Mr. Examiner. Let me pull up the right slide here. All right. For everyone participating in tonight's hearing, if you wish to testify about a specific agenda item, staff asks that you raise your hand so that we can gauge who wishes to testify. If you are a call in user, you can dial star three. If you are a web participant, you need to click the hand icon located in the lower right hand corner of your screen or next to your name in the list of participants. Here is a graphic showing where you may find the hand icon shown by the Red arrows. You May 1st need to turn on the list of participants. You can do this by clicking the participants button shown by the purple arrow. The hand icon locations are indicated by the red arrows. Once you have given your testimony, we would ask that you put your hand down. You can accomplish this accident action by either clicking the hand icon again or dialing star three again. We will also ask everyone to keep their microphones on mute at any time they are not speaking. I will show you how to do that in the next slide. Prior to the close of each agenda item, we will open all microphones for everyone in attendance to ensure that everyone who wants to testify has the opportunity. Please be aware that any noise in your personal environment will be broadcast at this time. If you miss your opportunity to testify for some reason, the record on each case will be open for a period of time, so you can submit your testimony in writing. Finally, the chat function has been disabled for public records purposes. As I mentioned prior, we asked everyone to keep their microphones muted at any time they are not speaking. There are a few ways in which to mute yourself. If you are a web user and are using your computer for audio, you can simply click the mute button at the bottom of your screen or next to your name. In the list of participants shown by the Red arrows. If you are a web user and using a phone for audio, you can either mute yourself on your computer or you can use your phone's mute capability. Phone only users can use the mute capability on their phone. We would ask that you stay muted any time you are not speaking, and thank you everyone. Let me pull up my case here as I'm the first case this evening. Okay? Good evening, Mr. Examiner, County staff and the general public. For the record, my name is Joe Kinsman and I am the land use planner for this project. The name of this project is the Crescent Meadows Subdivision. The case before the hearings examiner this evening is a request to divide 1.97 acres into a 22 lot compact, narrow and zero lot line subdivision within the R-1 six zone. Okay, as I said, my name is Joe Kinsman and I'm the review planner for this project. Hannani Patel Isaacson is the review engineer, and Jason Noble reviewed this from the fire Marshal's office. And Craig Caudill reviewed this for us. Transportation concurrency, although we have Mr. David Jardine here as well to assist in that matter. Okay. Tonight during our presentation, staff will provide an overview and summary of the proposal, identify any major outstanding issues or concerns, and make our recommendation to the examiner. Here we have the vicinity map. The subject property is identified by the black dot. For reference, North is oriented to the top of the page. We can see on this map that it lies south of northeast 139th Street, east of northeast 50th Avenue. West of northeast 87th Avenue, and north of northeast 119th Street. Here we have the zoning map, and the zoning map provides a closer look at the parcelization of the subject and abutting lots. The site is highlighted in red. The site and surrounding parcels are zoned R1 six, with other single family developments to the north, south, North, South, East and west. This slide is an aerial view of the subject area with the subject property lines in red. In this view, we can see the surrounding developments in the area. We can also see northeast 129th Street to the south and north east 64th Avenue to the north, which currently ends at the site, but is proposed to be extended through the site as shown in the next slide. Please. This slide shows the proposed plan for the site. On this plan, North is oriented to the top of the slide. This view shows the extension of northeast 64th Avenue through the site, and the general layout and configuration of the proposed lots. This time, staff will show photos taken from the site and. This photo here is looking east on northeast 129th Street. Out front of the subject property. Here we have the west view on northeast 129th Street in front of the subject property, and this is North Ward facing into the site off of northeast 129th Street. Here we have a west view into the site from the adjacent parcel to the east. And here we have looking diagonally southwest into the site from the northeast corner of the property. And here is looking south into the site from the dead end road. Currently being northeast 64th Avenue. Again, that's proposed to run through the site. And from here we have the northwest corner of the property or this view is from the northwest west corner of the property. Looking southeast into the site diagonally. And here we have a view from the southwest corner of the property, looking northeast into the site from northeast 129th Street, abutting the subject property. All right. And just comments on our staff report here. The fully complete application was submitted on April 3rd, 2026. The application was deemed fully complete on April 24th, 2026. The Notice of Development application was issued on May 21st, 2026, with the notice of the new hearing date issued on August 4th of 2026. The staff recommendation to the Hearings Examiner was issued on August 26th, 2026 and is in the record as exhibit 28. With this proposal, a sequel, a Baugh, was not applicable to this application. The applicant posted the development sign at the site on June 1st, 2026, and that is in the record as exhibit six and seven, and the updated hearing date was revised on the sign posted on the site on August 11th, 2026, and that is in the record as exhibits 26 and 27. Project issues on the site, which were public comments. There were concerns about the site grading that could cause sewer and drainage violations. The adding to the already existing traffic increase in the area. This increase could put kids, pedestrians and pets at risk. Another comment was the increase in noise that the project would cause. Then we have concerns that the developer may not be aware that by removing the temporary turnaround, they would need to restore the front yards of the adjacent hidden crest addition plat. The hidden crest addition plat was added to the record as exhibit 22, and the applicant has has verified that they are aware of that requirement. Next, we have emergency vehicles being able to access the area with the increase in parking, as well as site distance issues that would arise from street parking. And then we had feelings that this proposal doesn't match the surrounding single family residences, as it's a more compact development. And lastly, we have one commenter did not like the proposed loss of the dead end street that they live on. Next up, we have our recommendation two Mr. Examiner and Staff recommends that this application be approved subject to the conditions of approval identified in the staff report, and the staff Report is in the record as exhibit 28. And here is a photo again of the proposed plan. Mr. examiner, it's all you. >> Thanks. Where is this? There's a turnaround temporary turnaround that will be removed for this connection. Is it to the north? >> I believe it was to the north. Correct? Yeah. Hidden crest addition is up here on the northern point, where 64th ends. Currently into the site. >> Hidden crest addition. >> Correct. The plat. Oh. Didn't mean to change the page there. Sorry about that. >> So the temporary turnaround was constructed as part of that development that stubs to this property line. >> Correct. On the southern point of the hidden crest and the northern point of this proposal. >> Got it. And the main street going through the middle northeast 64th. That'll be a public street. And these tract A and B, will those be dry private driveways or private streets? What's their status? >> Our engineer Hannah would have to speak to the classification of the the different tracks or if they are indeed just a tract, I'm not sure on that point. >> So also if you look to the to the east, there's another development that appears to have a hammerhead stubbing to this property. That's not going to connect, is it? Or what's what's that? >> Correct. No, there's, there's no proposal to connect that hammerhead. >> Not even for emergency access. >> No, I my understanding is there would be some sort of fencing along there. >> Okay. And so cross circulation is achieved simply by the extension of 64th Avenue. >> That's my understanding. But Mr. Caudle would have to confirm the circulation portion or Hannah as our engineer. >> Okay, thanks. And there's mentioned in one of the public comments about sewer and drainage violations. There's not a record of sewer or drainage violations associated with this property yet. Right. So this is a fear of those things. >> Correct. There's so there's in the photos there, you can see there's a bit of a increase in the contour lines and grading on, I don't know, lots one through one through five and 19 through 22. There's a bit of a hump. And I think they just had general concerns that with the grading it could cause drainage issues on adjacent sites. Okay. But there's nothing historically that I've been made aware of. >> Okay. And the existing house on this property is going to be demolished and removed. Be a clean scrape. >> Correct. >> Okay, okay. I think that's it for land use questions. I just, I think I had just a few questions. For Miss Isaacson. She there. Hannah, are you there? >> For the record, I am Hannah Isaacson, Clark County development engineering. Welcome. >> So there's I guess it's not such a pressing question here, but I want to later on tonight on the agenda, the question of public versus private. But in this case, 64th will be public. And these track A and track B connections that serve a lot of the internal lots, those are private driveways or so. >> Tract A and B are classified as urban private roads. And then they will turn into joint driveways. >> Okay, okay. At the end they become joint driveways. >> Got it? Yes. >> Okay. A quick question about cross circulation. Is it possible to achieve cross circulation with a private road? >> No, we do not consider private roads in our circulation. >> Okay, let's see any road modifications on this one? I don't think I saw any. >> No. There were not any road modifications on this one. >> Okay, okay. I think that does it then. Thank you. >> Yep. Thank you. >> With that, I'll take the applicant's presentation, please. >> Good evening, Mr. Scott Taylor, SGA engineering representing the applicant. So appreciate everyone's efforts staff and Mr. Examiner and reviewing this project and the staff report all the findings and conditions. I've got a few minor edits and questions or comments for staff and the examiner, so I can run down that list. And quickly, I guess to make sure all your questions were answered. Mr. examiner, the temporary turnaround is indeed to the north. It's not shown in this plan, but it is part of their plat. And there's plat notes that talk about the adjacent developer's responsibility to remove that and restore front yards. There's also another option there where if for some reason, neighbors wanted to keep it and did not want it removed and front yards replaced, they could sign an agreement that said that, and we could provide that to Clark County staff. But I believe in this instance, they'll probably want it removed and have a little more front yards, other newer homes. And so, yes, we understand that as a responsibility and that will be part of the construction plans. Tracks A and B are indeed private roads. And then after a short private road track, they would go in shared driveways or joint driveways for the last four lots. So that is accurate. And those, of course do not meet cross circulation needs requirements. But it's nice we finally meet cross circulation with the project and don't need a road mod for that or, you know, other intersection alignments or anything else. So no road mods on this project, which is great. Sewer and drainage concerns are in that northwest corner as property sort of dives down. There's also a rise as you go further north. And so we evaluated that off site drainages actually do sort of drain onto the site from the north. And there's cut off ditches that were provided with previous engineering. Our site will have full infiltration of stormwater. You know, there won't be runoff that will go onto adjacent parcels and sewage, you know, will be public sewer that will be under the driveways and the roads and all gravity fed from this area. So the septic system that's on site would be removed. And so there are no concerns from our viewpoint on sewage or drainage concerns. >> So I don't see any stormwater tracks. So this stormwater will be dealt with through infiltration on this project. >> Correct. Yeah. We didn't need a pond or anything large like that. We had great infiltration rates. And so the systems are under the roads and under the private drives and will be 100% infiltration. >> Okay. What else? Oh, you had a list of. >> I think this is the most yeah. I'll go through my list. Just some comments and findings and conditions. And then just to clarify for you. Yeah, this is the most recent plan that is under review and submitted with staff. >> It's exhibit 17. Is that right, Joe? >> Let me look right now for you. Sorry, I is we're loading correct. Yep. Exhibit 17. >> Okay. >> Yeah. I don't think this one has not gone through a whole lot of revisions unlike some of the others. >> Correct? Yep, yep. We're thankful for that. >> Okay. >> So going right into it in the staff report on page nine, at the top of the page, there is a finding says the applicant provides two common parallel off street parking areas for a total of six parking spaces. Those are actually on street. With this project, we don't have any off street parking, just a minor clarification on that finding. >> Okay. >> And then on page ten, at the very top of the page, we're talking about shared driveways and the finding says no shared driveways are proposed. And I think that's just a carryover from a different project. This one has those two shared driveways. >> Sorry, what page is that again? >> Page ten. >> Got it. >> At the very, very top. It's a single single sentence. And so staff correctly talks about that later in the findings and the conditions. So this is the only spot in the report where it just needed to be clarified. So we do have two shared driveways for lots nine through 12 and 17 through 20. >> Okay. >> On page 12 under finding 11. This is one of my only real points of contention for the evening and to discuss with you and staff on the existing structures on site. So the finding talks about the site has one existing single family home with associated outbuildings. They're proposed to be removed with the development. These structures shall be removed prior to construction plan approval, complying with demolition permits from the jurisdictions. So that's not common and it's not consistent with other projects. A lot of times developers aren't going to be demolishing a home or structures on a property until they've got full plan approval. They're, you know, setting up on the site with their construction entrances and their erosion control, and they've got their bank financing to do all this site work. >> So, you know, this issue has come up a couple times lately. So what should the trigger be for? >> So my request would be these structures shall be removed prior to construction acceptance. Instead of construction plan approval. >> Prior to construction plan acceptance. Okay. >> So not even plan. So just construction acceptance. So that means when they're out on the site building the project prior to them signing off on construction acceptance, the home has been demolished or the structures have been removed as required. >> Okay, so construction acceptance means county acceptance of the streets and public infrastructure, correct? >> Yeah. And so prior to construction plan approval is just too early. And it's not, you know, in the pleasant woods, you know, staff report that we have later this evening. So that's one point. And so I know, like you said, it's come up a couple times recently and it's a little bit of a cart before the horse situation. So yeah, okay. >> We'll get kind of input from the engineer on whether that'll work. >> For sure. I believe staff discussed it and said they weren't originally in favor or supporting of that, but I think it makes sense. And hopefully with discussions this evening, we can get there. And I'll point to the conditions of approval that associate to that next item on page 20. Under finding eight site distance. On the conclusion, the staff says in summary, concurrency staff recommends approval of the development application with the following conditions and then period. And so I think they might need to point to the specific condition there. And I think that is a nine, a dash nine A through C. >> Okay. >> I think they'll close the loop on that. >> Yeah. I usually pick up on things like that. When I go to write the opinion. I, I hate loose ends that refer to things that are not clear. >> Yep, yep. And it's understanding things always change and findings and conditions and making sure the numbers match. So we appreciate that. >> Yeah, the numbers change and that's always a pain in the neck. >> Alrighty. So on page 24 we're into the conditions of approval. Condition of approval a one h. So landscape this is a landscape condition that's required when you have parking areas that are not on street parking. If they're off street parking in like a tract. And so you're trying to landscape for vehicle headlights. So I believe this item is not applicable for this project. So either just going on the record, that item, you know, condition approval HA1H is not applicable. It could be stricken from the report. I'm good with that as well. But if staff would like to keep it in there, it needs to just sort of say where applicable. I mean it says in the condition provided where vehicle parking or loading or drive through facilities, but a public right of way. So it's already making that clarification, but it's not applicable specifically to this project. So I just didn't want staff to be looking for it later. >> Okay. >> And I know there's a number of things like that in compact code that, you know, if applicable, make sure you're doing A, B, C so it's fine if that needs to stay. Page 27 has condition of approval. A six L. Item L is talking about Bioretention facilities, so the applicant shall submit infiltration testing at the rate of minimum of one test per bioretention facility. We don't have any bioretention with this project. They could potentially use those in the future if that was a different design, but I believe they could just strike the word bioretention and just say one test per facility. And that should cover the storm concepts. >> Okay. What else? >> So on page 29, item B one sorry, condition B1A. So this is the removal of existing structures and the timing. So I think prior to construction acceptance instead of prior to construction plan approval is that same finding language we talked about. I feel this condition could be moved to section C specifically it could be condition of approval C three. And that matches this other project. This evening I'm working on Pleasant Woods. I think this is a sea condition and not a B condition. >> Okay. >> All right. Page 31. We have condition of approval. D4A. So again this property and project does not have guessed parking lots or guest parking areas. It's on street. So a D4A is not really applicable to the project. We could either add some language there about when applicable, or that could potentially be stricken as a condition. And I think my final item is on condition of approval. Page 35E1G. And again this is the removal of existing structures. If we just change that language from prior to construction plan approval to prior to construction acceptance would cover it. >> Okay. >> And that is all I have for the staff report and findings and conditions and definitely available to take notes on people testifying and answer all the questions I can. >> Okay. >> That's it. Yes, that covers it. Thank you very much. >> Yeah. And just preface as well, you know, we're okay with the one week open record and understand the need for that. And then anticipate just a one week response. Rebuttal period is our standard request. >> Okay. I'll take note of that. Thank you. Thank you. Anyone else? They're online wish to testify in favor of this proposal or neutral in favor or neutral. Anyone out there, raise your hand. Anyone doing that, Richard. >> No, I don't see any hands raised. >> Okay. Anyone opposed to this project wish to testify? Raise your hand. >> We do have Jason Foster. >> Okay. Mr. foster. >> I sent a request to unmute him. So, Jason, you should be able to unmute yourself. There he goes. Looks like he's on. >> Okay, Mr. foster, you're on. >> Thank you very much for taking the time to listen to my public comment. I'm speaking as a neighbor directly to the northwest on 164th and my house. >> Where are you? We've got the plat up there. You're in. You're in that. >> Hidden crescent addition. >> Okay, so you're up there in the northwest corner. That whole big parcel? >> Yes, on the upper left. >> Okay. So you're like an older house that's been there a while. >> No, I'm a newer house that's been here about five years. >> Okay. >> And you're the last house built in this division. >> Do you abut the. Do you have part of this cul de sac thing in your front yard? >> Yes. >> Okay. Got it. Okay. >> Go ahead. I'm speaking today because there are a number of concerns where I believe that all considerations are being made in favor of the developer, as opposed to the existing residents nearby. For example, I'm going from having one neighbor alongside my house to four. If the lots were to match the sizes of the neighborhood adjacent, we'd most likely have around 12 lots or 12 residences being built. Now we're going to have 22 because we have a small private drives off. The main drive on street parking will be extremely limited, which will inevitably end up backing up onto 164th because there is no other outlet. Question also, is. >> There is there on street parking allowed on 64th where you live? >> Yes. >> Okay. >> And that will be, I assume, where the majority of overflow from 22 houses taking the place of one house will go just it just seems like it would be unavoidable. It also will most likely negatively affect the property values of the most nearby. They're on 164th because we'll be going from having a larger sort of exurban, almost rural. >> You know, that that, you know, property values are not an issue that are in my list of approval criteria. You know, the county board of commissioners, councilors, they zoned this property what they did and their zoning allows for this kind of density. And so presumably they took your these concerns into account when they they zoned it. But it's something that I can't. >> I understand I'll move on to the next concern that I have in the two neighboring subdivisions, the hidden Crest proper and the Philbrook farms, both. There's that one. Philbrook farms is to the west towards 50th. It runs right up against Hidden Crest on the west side, through a connecting street. And then there's another large park there, both in that and in Hidden Crest. The attempts to properly irrigate and drain or to drain, sorry, those subdivisions have been lackluster and have resulted in regular flooding. Our nearby park and hidden crest is regularly flooded along a tree line that abuts with two properties, and then the park in the Philbrook Farms that currently has a basketball court on. It is flooded so often that during the rainy season it is locked, so people can't accidentally be the victim of that flooding by going down into that sunken property. So I do have concerns with how hilly this particular property is, and the fact that it does run down towards my property, that there may be flooding if we are to replace, you know, absorbent soil with mostly concrete and asphalt. Yeah. So I have a serious concern about that. Yeah. Besides that, was there anything else I should share? No. Okay. I think that's all of my concerns. Thank you. >> Okay. And feel free if you want to. If you're reading from a script or with notes, feel free to submit that. That's always very useful thing to do. >> Okay. Yeah, I haven't had a script, but I will send it afterwards. Thank you. >> Okay. Thank you. Anyone else wish to testify in opposition to this thing? This is Chris Meadows. >> I'm not seeing any. >> Okay, so with that, Mr. Taylor, final rebuttal. >> Good evening, Scott Taylor, SG engineering. So I think drainage wise, you know, we've gone through the proper channels of working with the geotechnical engineer, having the site testing completed, identifying groundwater levels, writing stormwater reports and doing proper calculations and researching adjacent developments as well. So these are all pieces that are taken into account when this is designed. The Clark County also has a number of factors of safety. You have to apply when you design stormwater facilities. And so that's the concepts and that's the requirements that have been sort of worked through to get to this point today. Site distance lines you can see are shown on the proper on the plans on the screen, you know, on street parking is allowed to be in those areas. And then people are expected to pull out past those and look, you know, for oncoming traffic. The goal really with neighborhoods is to provide as much parking as possible. This property and project meets on street parking and guest parking requirements based on the compact codes. And so that's also a question. >> Question, Mr. Taylor. So each one of these units is going to have a driveway and a garage, right? >> Yeah. The goal is to have a two car driveway and two car garage. And so that's what's shown in the plans here. >> And so the yeah, so that plan shows. So that's a total potential storage of four cars in the driveway and garage. >> Typically. >> Okay. But everybody knows you don't put cars in a garage. That's where you put your stuff. So and otherwise there's no, the only on street parking that would be where there's space for it in this development would be on 64th then, right? >> Correct. The private streets are 20ft wide and you're not allowed on street parking unless you're 24ft or wider. So 64th Avenue is a 28 foot wide local access roadway. And so parking is allowed on both sides. It does make it challenging when people do that. If it works that way and this project, it'll actually be offset with the curve in the road. And so the guest parking is shown on street parking is shown there sort of lightly in the plan. And so we meet the requirements for the narrow lot one guest parking space for every three narrow lots. And so that's where this one's coming from. Okay. Where we're sort of correct, correct. And then where we're connecting 1/29 Street. It's a unique situation where we're sort of the missing link. Right now. You have two sort of dead end road systems there, and there's also been some historic private streets in this area serving these homes and adjacent parcels like, like you notice the one to the east is developed recently and is under construction has been built, but homes are under construction soon. And so yeah, it's finishing roads, connections and making sort of cross circulation improvements. But yes, it will I'm sure have lots of guest parking and requirements and needs over the years. And the goal is to have the best parking we can, providing the densities that are allowed by the county. So it's. >> Also a question of. >> These, these houses that are what's the like maximum square footage of these houses? Do you have a guess as to what it is? I'm trying to guess whether, you know, like a family of 6 or 8 could live in one of these houses, which usually means three, 4 or 5 cars with that. >> Yeah. Nothing's set in mandatory requirements for minimums and maximums. They have lot coverage maximums, of course, but the conceptual footprints that we are showing, I think are 20ft wide and 60ft deep. So you have a 166. >> Zero feet deep, okay, 20 by six. >> So they can make two story homes and you can have nice three bedroom homes. And you need, you know, all the parking you can get. But these aren't large, large homes. >> Okay, so you can get a three. You could possibly get a three bedroom house out of these. Okay. But you're not going to get, you know, three bedrooms and three baths and or more bedrooms than that is there there are certain constraints given how small these lots are. >> Yeah. They'll have the maximum lot coverage requirements as well. And so these are smaller lots. This is affordable entry level housing is the concept here with with the. >> That's the hope. >> That's the hope for sure. And so this is what codes were used. And it's definitely different than adjacent neighborhoods have been years past. >> Do you know what those are? >> What the hidden Crest Edition zoning is? >> I'm sorry, I don't know the exact numbers right off. I have their plot here and oh, here we go. So here's 5000 805,900. It looks like the adjacent parcel of the gentleman that testified. Their lot is 7900ft². So one of the nice larger ones. >> Okay. >> But yeah, that plot, I mean, they do go down to 5400ft². And our one six zone, you know, is traditionally been a sort of 5 to 6000 square foot zoning. And with the new compact housing standards, I mean, you can be down to 2750. And if these were attached townhomes, they could be as small as 2000 square foot lots. And so there could even be more density. And so it's a tough balance to for neighborhoods to strike with traditional larger lots and these new, smaller lots. >> But well, I mean, I don't know about tough balance, but I hear a lot in these. I get a lot of the compact lot developments. And and I hear, you know. Mr. Mr. Foster's complaints from a lot of neighbors in existing neighborhoods. And it's it is sort of jarring to see such density coming in next to these subdivisions that aren't that old. And it's true that the Board of Board of county counselors has really changed things up in Up zoning these residential areas and allows for a lot higher density. And was true five years ago. >> Yeah, yeah. >> And it's, it's not traditional for a lot of people. So we, we empathize with that 100%. And you know, this one, you know, we've gone through all the codes and worked really hard to not have road mods or variances with this project. So, and National builder could come through and purchase this and build homes or local builder could also build homes on this property and provide a lot of good opportunities for homeownership. >> So okay, I think anything else? >> The questions? Yeah, nothing else for me specifically definitely can answer any other questions that do come up and talk about timelines or open record stuff as needed. >> Okay. >> Let me check in with staff. Anything staff would like to add before we talk about open record. >> Thank you. Mr. Examiner. Joe Kaspan I have nothing further to add at this time. >> Okay. Miss Isaacson. >> Hannah Isaacson I don't have anything to add either. >> Okay. Thank you. Okay. Open record. Here's another wrench I'm going to throw into the open record for this one and all the others tonight is. I'm. I'm headed out of town. I won't be back till October 5th. So, you know, a week or two extra would help accommodate that because I can start writing as soon as I get back and the record will be closed by then. So if we're looking at one week from tonight, that's the 17th for anybody to submit any sort of comment at all relevant to this proposal. And then, Mr. Taylor, you want one week for your final rebuttal. That would get to the 24th? >> Yes, sir. >> Would that work? Okay, so I'm going to need more than two weeks. If that's when the record closes, I'm going to need more than two weeks to kick this out because let's see. One, the next Thursday, two weeks would put it on October 8th. So I'm going to probably I may not make that deadline. It might be the next week, but no later than that. Is that okay? >> That's all right by the applicant. >> Thank you. >> Okay, so for all of you tuning in, I guess Mr. Foster in particular, since you're the one who weighed in on this, but also anyone else interested in this, we're going to leave the record open for anybody. Any comments? Mr. foster? This is submit your any further comments by 5 p.m. on Thursday, September 17th. Email it to Mr. Kinsman. Make sure it's in his hands by 5 p.m. and then the applicant has final rebuttal until 5 p.m. on the 24th of September. In Mr. Kinsman's hands. Any any objection to that? >> None. >> Hearing none. That's what we'll do with this one. I will continue this. Keep the record open. Conclude the hearing on this item. Cresap Meadows pl D2026-52 record will stay open until the 17th or anybody any relevant issue and then the 24th for final rebuttal. The record will close then and I'll issue a written decision. I'm shooting for the 15th of October, so that's it for Cresap Meadows. Thank you. Let's shift to the next one. 39th Avenue Subdivision pl D2025-94. Mr. Daviau, who's got that one? >> I do, I'm covering this for Melissa. >> You be Melissa tonight, okay. Go ahead. Whenever you're ready. >> Okay. For the record, my name is Richard Daviau. I am covering for the project planner. Who is Melissa Curtis? This 39th Avenue subdivision is the proposal. PLD 2025 00094. It's a subdivision to develop just a little bit under two acres into 25 lots, single family detached. It's in the R one six zone. This is proposed to utilize the compact lots and there are lot standards. Paul Williams is the contact the applicant and the project is located on 10003 northeast 39th Avenue. As I mentioned, Melissa is the planner. I'm covering for her tonight. The review engineer is Alistair Dawson, concurrency engineer is Craig Cogdill, and the fire marshal deputy who reviewed this case is Jason Noble. And the purpose for the presentations tonight is to provide an overview and summary of the proposal. Also to identify any outstanding or major issues. And that's all helps to make a recommendation to you the hearing examiner. Okay. As you can see, this next slide shows basically the vicinity map where this project is located. It's represented by these black dots. They're overlapping each other because there's two lots here. And just to point out quickly, you can see the north south road that this is a budding is 39th Avenue. I'll show some pictures of that. And to the south it's a lot away, but there's 99th Street. The subject site is zoned R1 six, as is the surrounding properties as represented here. And as I mentioned before, this road down here is 99th. And there's a couple lots between the subject site and 99th Street. Here is an aerial of this of the site representing the conditions. And here is a copy of the proposed plat. >> And this is exhibit 35. >> It is. That's exhibit 35 which is the most recent plat. And I'll get more to this later. We have a couple copies of this. There's a couple issues, but I'll continue onward here. As I mentioned this, they're proposing 25 lots. We have an issue with one lot density that they're right on the right on the cusp, but I'll get into that in a minute. Okay. At this point, I'd like to show some photographs representing the existing sites. This first shot is one basically showing the development sign that is one of the existing homes in the background. And this is coming from more the north portion of the site. >> There are two homes on this right. >> Now. >> And they're both going away. >> Yes, I believe they are. I'm going to have the applicant address that that's coming up in one of my next slides that I'm going to get to. In a second. This next slide is one looking south on the 39th Avenue subject sites on the left hand side of the screen. And you can see they made a note 99th Street, you can barely see it down there. It's not that far down the street, 99th Street. This next slide is one going north of 39th Avenue. Subject site is on the right hand side of the screen. And this time. Here, I think this is the same residence that we're looking at before. This is the the one of the existing residences that's on the shot. And and this you can see this is the driveway that's along the north property line. That's this, this driver here is accessed to 39th Avenue. And this is just showing the other accessory structures behind this house. Here's a last slide. And the first picture on this slide. It's one from the north property line. Essentially looking south on 39th Avenue is in this direction. You can't really see it too much. But the South property line, of course, is directly south. This last picture is, is, is the point I wanted to make. There was a note here on this on the, on the PowerPoint presentation that this is existing house was to remain and the staff report on page. On page 13, finding seven. It does show. It says that the that that it. It appears the home one home will remain on proposed lot five. I don't think that's the case. I'm going to ask the applicant just to verify that when they get online, I think I think this was an error. I think both homes are going to be removed. And if you look at the plat, it seems difficult that that it would be. But I just wanted to point that out. I'm going to ask the applicant to address that. >> Okay. Okay. >> So this project received as far as some of the dates here and just giving some information, the project was fully completed, deemed fully complete on December 31st of 2025. The original notice of application went on, went out on January 7th, 2026, and there was originally a hearing scheduled for February 25th, which was canceled. And we did send out a notice of canceled hearing date on February 25th. And then the new notice for this hearing was sent out on August 6th. Staff report recommendation to the examiner. That's exhibit 49. Cepa, like the last case, was not applicable to this project, and the applicant posted a development sign on the site on August 10th, 2026. Okay, for the exhibit list, I've already mentioned the staff report was exhibit 49. Just wanted to mention quickly that exhibits 53 and 54 are out of date. On that last slide, I mentioned about the canceled hearing, and even And though we did issue a cancellation notice, it wasn't put into the exhibit list of where it should have been. So I just want you to know. Exhibits 50. >> Yeah, I figured that out. >> Are out of date, but that's that's not a problem. It's we did we did do the cancellation. So I just wanted to point that. We've received quite a bit of public comments on this case and mainly our property. The mainly of concern and and I'm not just so you know, I'm not we had a bunch of new comments that have come in in the last week or so, exhibits 55 through 66. And certainly I think it would be 61 through 66. We haven't really been able to. We've made them exhibits. Of course, we've sent them to you, but haven't gone through those so far though we have basically property values, noise, increased traffic on 39th Street and 99th Street. I'm just going to go through a couple of these. Obviously traffic, crowded streets, traffic flow and danger to walking citizens like the last case, very concerned about the more density. That that some of these projects are seeing. And of course, as you know, Mr. Examiner, you know, we were we were dealt with stuff from the state that mandated us to require to allow these compact lot developments for higher density. And that's why we're seeing a lot more of these. Also, there's a note about a traffic signal on 99th and 39th Avenue. Lack of parking, inability to handle waste and garbage services. And there was also a comment about a 50 year old Douglas fir tree, 50 year old trees that are next to the property line. Probably probably the biggest project issue I referred to a little earlier. I just, of course mentioned about compact lots and compact lots basically allow double density, 200% of the maximum density of the underlying zone. And you notice when I, when we first talked about this, say you'll notice that the project site is 1.99 acres. And if you add up all this here, 1.59 acres, as far as what the net gross acreage is, even though they're proposing 25 lots, it comes out to 24.9, which is the density. And you can't round up in density. I think they're only about a 10th of a of a F. So as you'll notice in the staff report, we we did point this out. And you know, unless unless you know, when the applicant does the final survey for the final review, if you know, if you know, sometimes when you get that final survey, sometimes they're a little less, a tiny bit less or a tiny bit more, we'll just have to see. But based upon the numbers we have now, the applicant does need to lose a lot. Although like I said, it's very close. It's very close. Okay, so as far as as far as the recommendations go, we have a denial recommendation for two reasons. Development engineering is recommending denial for crossroads circulation and a sidewalk issue. And also concurrency is recommending denial. And it appears it's because there wasn't sufficient information. Of of data that was that was not supplied in the traffic study. I believe we gave the applicant the opportunity to and that was not submitted. So we are also recommending denial of that. And of course, the exhibit concurrency exhibit. 48 exactly 48. I was just going to say that that gives more information on that. But so right now, the both of those issues are still for recommendation of denial. >> Okay. >> So maybe this is I guess this is an engineering question. I'll save it. >> Go ahead. >> That I've got the proposed plan up on the thing that concludes staff's presentation. And unless you have further questions, you probably do. >> I think I'm okay. On the land use side. I have questions on development, engineering and these road mods. So is that is that you, Mr. Dawson? >> Yes. Alistair Dawson here with Development Engineering. >> Hi. Welcome. >> So the basis for the part of the basis for denial here is denial of the road modifications. There are two of them and one is cross circulation. The other one is compliant sidewalks. So you heard my question. So as I. See it that this the road mod report talks about stubbing this street to the southern boundary of the site is required to provide cross circulation. And so I look at the the revised plan exhibit 35 and it stubs to the southern boundary is the reason this doesn't provide cross circulation that is compliant with the code because it's a private street. >> Yes, sir. There is a specific code language that says that private roads are not considered to provide cross circulation. >> And is it possible to make. Could the is there enough room to make a compliant public street in what they're proposing by way of street width? >> Yes. Based on our proportionality calculations, which are based on the 2008 Boerke resolution, our calculations show that 25 lots with public infrastructure would be proportional. I haven't seen a revised layout, so I'd have to defer to the applicant if they lose lots and what the resultant would be. And then of course, as Richard said, if they have to lose a lot right off the bat, you know, those are all different scenarios that we can evaluate during the open record. But at this point, D recommends denial based on lack of circulation and the fact that providing public circulation through the site would be proportional to the impacts created by this development. >> So wasn't a sidewalk issue part of the road mod request? >> So yeah, the sidewalk, I mean the sidewalk issue is definitely secondary. It's just the standard detail for a hammerhead turnaround. Shows in the urban area shows sidewalk all the way around. >> The hammerhead would be at the southern stub thing. Or where would that, where would the where's the hammerhead on here? Right here. Where should it be? >> It's it's kind of like a sideways one. You can see, I think, well, Alistair can correct me if. >> I'm wrong. Oh, so that's. >> A hammerhead. Okay, I got it. >> It's just it just goes longer to the south, but I think. Okay. >> And so the they don't want to provide sidewalks on that at all. >> They're showing sidewalks on the south side here, right? >> It's supposed to wrap all the way around. So, I mean, in this case, the hammerhead extends, I guess, longer than the standard detail. Like typically it would just be 60ft on either side of the center line, north and south. So it's a little bit atypical as far as the geometry goes. I think. >> You saw I couldn't tell, I thought the hammerhead was down on one of these stub things. So but I get it now. Okay. >> Understood. >> And and they're providing they're proposing a sidewalk on. One side, but not the other. >> Right. >> You could see Mr. Geigenmiller see my cursor? Even on the north, even on the east side here, the sidewalk looks like it's proposed all the way to here, which is probably what Alistair just mentioned. That's where it ends. The full. >> Okay, that's the sidewalk, and it just ends. >> Down from here. There isn't any sidewalk from along 12 lots, 12, 13 and 14. >> Okay. Got it. That's weird. And it looks like there's a sidewalk on the west side of this street. >> Yep. >> All the way. Okay, so it's the sidewalk that's missing is just the frontages of 12, 13 and 14. >> Essentially. Yeah. It depends. And if yeah, if it's stubbed to the south and we wouldn't require sidewalk along that. But there is another. If you go back to the exhibit, the where the road mod, the last road mod I think was 23 and the site plan at the time when the road mod was discussed, the roadway stopped shorter, so there would have been a need to have the sidewalk go across the southerly end of the hammerhead. >> Okay, that seems small potatoes compared to the rest though. >> Agreed. >> Okay. And let's see, is Mr. Caudle there to talk about the concurrency recommendation of denial? >> Yes, sir. For the record, this Craig Caudle, concurrency engineering. >> So you've been hearing listening to this. And concurrency is a basis for the denial recommendation. What's up with your recommendation. >> So there are several items that are missing from the traffic study that was submitted. >> And it's with the original. >> Application. Right. >> Correct. >> I don't think. >> There's a. So I believe I deemed this traffic study fully complete back in December of 2025. And basically with the fully complete determination, it's a real quick review for concurrency. I don't I don't dive into the weeds with the traffic study until the early issue portion of the land use process. And with this one with with the list of dates that was previously shown, I didn't see an early issue submittal date. So when when this was reissued for a hearing on, I believe the date was August 6th, I looked at the traffic study and realized that traffic signal warrants that may be required were not included. There was not any crash history provided. There were several intersections that I would suggest require a level of service analysis that were not included in the TIA. Also, the volume to capacity analysis was missing and I. I don't remember, I don't think I supplied the applicant's engineer, the traffic engineer with any in-process data. So for those reasons, concurrency recommended denial for this one. >> Okay. Let's see. I'm looking I'm looking at the early issues memo. Okay. All right. And so. There are a number of deficiencies in the traffic study that you normally expect to be fulfilled without too much trouble. They just weren't in this case. Is that a fair characterization? >> Correct. >> Okay. >> So until those elements are submitted, you can't complete your concurrency review on this thing. >> That's correct. Yes. >> Okay. >> Fair enough. All right. Thank you. With that, I'll take the applicant's presentation, please. >> Hello, this is Paul Williams. I sent Richard to exhibit. Hopefully you got him. >> Let's see. >> What would those be, Richard? >> I did not know. I did. I did speak to Alastair just as I was logging in for the for the hearing. And and he did mention I didn't get those directly. I did mention there was a couple new things. >> Do you do you have them, Richard? Can you forward them to me right now? >> Initially he emailed them to Melissa, then realized she's out. And then I turned around and emailed them to Richard. >> Okay. >> I will forward those to you. And I think one of them was a presentation, right. And you can share that yourself on, on the screen. >> Yeah, go ahead and do that. >> I'll stop sharing and then you can share. >> I don't know how to share. All right. Okay. I'm gonna figure this out. >> You learned that in kindergarten. >> Where we're like, where is the share button? >> It's down below. On the bottom, it says share. It's pretty, it's, it's, it's. >> A yeah, right in the middle. >> Oh, there it is. >> And then you have to pick what screen you want to share from, depending on how many monitors you have. >> Okay. >> So we'll start with the very last slide because we're talking about the topic of density. And Richard is correct. We're at 24.9956. >> Geez. Oh man. Okay. What's the solution? >> Apparently we can well, we're not allowed to. I mean, we got four significant figures here. I don't know if we're allowed to round up to 25 or is. Okay. It is 24 lots. >> Okay. You'll figure out something. And like you said, with the final survey, you never know. Maybe the preliminary survey was an underestimate. So, you know, the dust hasn't settled on. >> Yeah, we're talking about feet. >> Yeah. >> But I want to get back to the traffic study. I haven't received any comments regarding issues with it, so I just need a list of things that need to be addressed. And then, you know, I can submit those. And it seems like we're going to have to keep the record open and allow Greg to review it and then respond. And, you know, until Greg is satisfied. >> So look for exhibit 48. Mr. Williams that's the concurrency report. It's short. It's a two pager. And then I think the early issues memo is exhibit 19. That's like five pages. And I think it's in there. Do I have that right, Richard? >> Yes. >> No, the traffic comments are not in. >> Oh, wait, there are other there are additional early issues memos. >> There's a couple of early issue. >> There's a exhibit 24, exhibit. >> 3419 was the first early issues. >> Yeah. >> Then. 24 and Paul, do you not have exhibit 48 because I can send that very easily to you right now. Do you have exhibit 48? >> No, I have exhibit 19, which was the first one. The second one was storm related. And then the last one. No, no, I did not. >> I'll send you 48 right now. I can do that for you right now. Yeah. But also. >> 4848 itemize all the things that need to be addressed in the traffic study. >> Boy. >> It's once again, if not, maybe I can reach out to Greg and it's a. >> Concurrency memo. So it says I'll read it. The traffic study contains requests for the Public Works Director to waive requirements to collect data and analyze regionally significant intersections within the study area. The Public Works Director did not approve or support the applicant's request. Therefore, the applicant was required to comply with Keesee 40.3 50.020 related to the data collection and the analysis of trip impacts from the proposed development on the surrounding road network. Conclusion. Staff's review of the submitted traffic study found that there was not sufficient information and analysis to show compliance with. 435020, so that that's kind of the bottom line sounds like. So that's exhibit 48. >> Good evening, Mr. hearings examiner, this is David Jardine, traffic engineering section manager. At the end of the day, I would encourage the applicant to reach out to the concurrency engineer to to ensure that whatever information is necessary is adequately communicated so that there's no confusion as we move forward. >> Right. So it doesn't seem like a deal killer. It just seems like additional information is needed to allow staff to do their analysis. >> I agree. >> Okay. Okay, so I interrupted your presentation. Why don't you go ahead, Mr. Williams? >> So I think we're down just to the cross circulation. >> Yes. >> Let me just go. Since I got 17 minutes here. So in the cross circulation, this is code related. The roads, any cross circulation road must meet intersection spacing. Also cross circulation shall be provided in a manner that meets these standards and where possible, that will allow so sequential developments to meet these standards. So we don't hear here is yes, we do not meet circulation. So what the the county has recommended that this would be a public road and we would stub to the south. And then I actually look because this is public road and I did cite Burton and Clark County because once this county is recommending a public road, they have some burden in looking at these analysis too. But I went ahead and did it. If the road was to go through, it would not meet intersection spacing. And once again, this table is explicitly cited in the cross circulation standards. So if there were to punch a new road through here and they're asking us to center, center this up on the two properties, and they would come through and then connect to 99th Street. However, it won't meet intersection spacing. So the next step was to make sure that this is feasible. And once again, you know, the resolution was mentioned. And that's what we used to determine. If it is feasible or not. So we got the west parcel East parcel. You can see these are very small parcels. They both have existing homes on it. So the area of right of way dedication because there is one existing home one only can do a two lot. They both can basically only do a two lot. So their per net ADT. >> So when you're talking the west parcel on the east parcel are those the the parcels south of you. >> Yeah. >> So you're doing an analysis of whether it would be proportional for those you know speculative future lots to do some speculative future development. I think the proportionality analysis is whether the improvements you're being required to construct are proportionate to the, to the impact and value of your project. >> Yeah. That's why I'm citing the, the citation out of the code. It says cross circulation shall be provided in a manner that meets these standards and where possible, that allows subsequent development to meet these standards. >> So analyzing whether the properties to the South could meet the standards. >> Yes. >> Okay. >> Also put in there, there was two exhibits that were that should be provided to you. One of them was a previous case that it was absolutely similar to this, that I just provided you for reference. And the same thing. You know, we looked at the offsite to make sure that it's feasible. So why would we propose a road where it's not feasible to extend? Okay, so what. >> Was that case, by the way? >> It's in the exhibit. It was. >> Was it a Clark County hearings examiner decision? >> Yeah. The decision was, I believe, issued yesterday. >> That's hot off the press. >> It's for. >> Yeah, PLD 2005 00093. >> 40th Street subdivision. >> And I provided provided this to you. But my PowerPoint presentation that I'm presenting to you today is literally identical to the one I did for 40th Street. >> Okay. >> So once again, we just need to make sure that the circulation code, if you look at it, it's we need to be responsible to make sure that, that the adjacent developments can continue on this road. And so I'm seeing two issues here. One, it can't meet intersection spacing. The two, it just puts a burden on the property. >> On your property. >> No, on their property. >> Okay. And right now you're proposing a street, a private street where it's where staff is recommending it. Go and provide cross circulation. It's just that it's private and not a public street. Do I understand that correctly? Okay. >> Yeah, we had meetings with the county on this and they agreed to I mean, they're aware of the intersection. You know, I thought we had an agreement that we just leave it private and just allow those two southern parcels to connect to our private street so that when they did come in for further development, they would not have access on to 99th Street. So this conversion to public road, we weren't notified until the the staff report was issued. >> Okay. And that was the 26th of last month. So question is 99th Street a collector or an arterial arterial. Okay. That's why direct access is not recommended. Right? >> Right. >> Okay. >> So the issue is, is my analysis assumes that they come in at the same time. If one comes in at the other. And you can see the note that I have off to here, you know. You know, 23ft, you know, 46ft is a local access. If each one come in, it'd be 23 foot dedication on each side of the property. However, they got to maintain a 20 foot property. And that's that red dashed line. But it's the dark dash, the dash line that is the 4100ft² of dedication for the West. One and 5229 for the East one, and they get a credit for the existing home. And so it's only ten eight divided by 5000. So that pushes it into not being proportionate. >> So what's the development potential of those two lots maxed out. >> Two lots. >> Two each. >> To each. Yeah. Total of four. >> Okay. >> So once again right away dedication 1080. That puts the burden. So if they were to come in and this the county was to say, hey, you need to put a public road, they have the right to do proportionality. >> Okay. >> And demonstrate that putting a road there, I mean, because that's a big dedication, you know, for these very, very small lots. I only have nine minutes left. The hammerhead thing or the sidewalk was the hammerhead standard details, 120ft. So we have sidewalk that comes here, here and down here, 120ft. So there's 120ft. So I was thinking technically it meets the requirements of the sidewalk part, but I guess. >> For a standard hammerhead. >> Yeah. Standard hammerhead. Yeah. >> Okay. This is standard hammerhead though. >> Well, it's 60 and 60 because what we're going to do, the fire marshal made the comment and e that this doesn't meet requirements. And Alistair made the comment that we gotta we have to have on street parking. So I pushed the parking down here. I guess I put it on the preliminary just said no, you know, fire lane, no parking. So there would be within this 120ft, there would be no parking fire lane in this area. >> Okay. How does that affect given a sidewalk for lots 12, 13 and 14 though? >> I mean, we can bring the sidewalk all the way down. I don't see that. >> I think that takes care of that issue that that takes care of that basis for staff's negative recommendation. >> But I'm asking for a modification to be done to the fire standard, because he wants us to increase this to 28ft. I know previously the previous subdivision, he mentioned 24ft, but the fire marshal on condition E says 28ft. But have you talked. >> To the fire marshal about this? >> No. And that comment got the last minute too. >> Okay. Because I think that, you know, it's always amazed me that the fire marshal holds a lot of cards in these subdivision when it comes down to fire life, safety and what they'll require and what they'll allow. So that's kind of where I would start. >> So I guess I can reach out to the fire marshal since we have open record, I'll just yeah. Reach out. Yeah. There are. >> A number of open record things that you'll want to do. >> Okay. >> Starting with figuring out that 25th lot. That's, that's kind of a big deal. >> Well, I think we kind of already know where we're going to get rid of it. We are keeping the or where do I do with the did I. >> Would that be a quick, simple, easy change to the plat, or would that require you to rejigger everything? >> No. 2022 we're more likely to get rid of lot 22. 21 is going to be the existing home. >> Oh really? Okay, so you are going to keep one of those houses. >> Yeah. >> Okay. For some reason, staff thought it was lot five. >> Oh yeah. I and the client mentioned he may maybe we just get we combine. So we got two options here. Real quick. Get rid of lot 22 easy simple. Or we just combine five and six to keep the other existing home. >> And you know, I mean, aside from tweaking the lot lines, the issue is whether if you if they go away and you have new houses, you get impact fee credits for a house that you scrape off. So that's, that's the implication that I see. >> Okay. I don't see any problems with that. But yeah, we'll, we'll take that under consideration. >> Okay. And so the traffic study seems like get in touch with your concurrency engineer. And that seems, you know, figure out what additional information is required for county to do their, their completeness review. And then anything more you want to say about the, it seems like they're the, the real dispute is over the cost circulation road mod. So correct. You know, the record will be left open and you can think about whether you want to stand pat or revise things, change your road mod request or just do a public street. >> I think we're going to stay firm with the private road. >> Okay. That's your prerogative. >> Yeah. Because we're doing a public road would just wipe out so many homes. >> But on adjacent lots on those two adjacent lots. >> I don't. >> You know, putting in a public go ahead. >> To do the public street on your property, would it eliminate any lots on yours? >> Yes, absolutely. >> A lot. >> So you'll to, to build a public street standards would require a wider profile. >> Yes. >> Okay. How many lots would you lose. >> I am predicting like 6 to 7 lots. >> Okay. >> Okay. Well, you have a little rejiggering to do during the open record period. So that's something else you can think about. >> Okay. >> And this presentation here, this PowerPoint thing you have, you submitted that as an exhibit? >> Yes. Along with 40th Street. >> Okay, good. >> And I email it to yeah, I did. >> I did get it. I got it from I, I did your email never came through to me, Paul, but I did get it from Alastair. So we have the PowerPoint presentation, the one you're seeing now. And we have that decision on 40th, which just came out the other day. We'll make those exhibits. And for those few. Mr. Exhibit. >> Okay. That's a Joe Turner decision, right? >> Yes it is. >> Okay, okay. So things are still still not solidified at this point. So do you what else do you would you like to add by way of your primary presentation? Mr. Williams? >> That's pretty much it. >> Okay. Okay. Thank you. Anyone else like to out there in Zoom land like to testify in favor of this proposal or neutral? We'll take both. We have quite a few people submitted opposition comments. Anyone else out there like to testify in opposition to this thing? Raise your hand if you do. >> We do. >> We have Jack. Jacqueline. We have a couple now. So Jacqueline Cruz was the first one. Jacqueline, I'm sending a request to unmute you. You should be able to unmute yourself now. >> Can you? Yeah. Hi, I'm Jacqueline Cruz. I live in one of the houses above to the north of this proposed development. So it's just it's also considered 39th Avenue. But what I wanted to speak to you today were mentioned in the comments earlier, but I also wanted to share that, you know, there is genuine concern about emergency vehicles being able to have safe and reliable access through the subdivision. And also, you know, will garbage and recycling trucks be able to safely navigate, you know, the proposed roads and serve all of the homes? I currently live on a street where both of those things were saying that they could happen, and neither are able to make it down our street. So I wanted to bring that forward as a genuine concern of, you know, depending on the number of homes that are approved, you know, what that would actually look like. And then the other thing I really wanted to mention is that, you know, assuming this is the same person that we spoke to, we did have a meeting because we are the immediate neighbors to this proposed lot. I have three other houses that I live right next to on the one way road or flagpole lot, whatever you want to call it. And it was included that they would be 300 zero square foot lots, along with references to homes being around 2100ft² with attached garages. And then they talked about a different configuration. I understand that a neighborhood meeting discussion is not necessarily a binding commitment. I'm just wanting to mention that because there were alternatives discussed. So they are open to other. >> Yeah, none of these are that none of these lots are that big. Yeah. >> So that was the initial discussion with us. Assuming this is the same person. I'm not 100% sure to be honest. But I, you know, it was shared with us to be a different kind of development initially. Obviously, when you buy land, you can, you know, propose to do what you want with it. But I think. >> Within within limits. >> Yes, yes. Sorry. Within limits. So I'm, you know, I understand the like that the proposals have changed or not the proposals, but like the code has changed a lot in terms of how many houses. And so I'm not saying that it shouldn't be developed. I'm just asking for it to be reasonable to the neighborhood that I already live in. >> One question I didn't catch where you you live north of this? >> Yeah. So there is a single lane road right above where? Right there where the cursor is. So I live in one of the houses. >> Okay. Got it, got it, got it. Okay. You might. Your points are interesting. You might consider jotting them down and submitting them as just a written comment, because the record is going to remain open for a while. >> Okay. Yeah, I can definitely do that. I just want to make sure to speak as well to make sure that my, you know, thoughts were heard with you. So thank you. >> They were. Thank you. Who else? >> Next we have Josh Schlitt. If I'm pronouncing it correctly. Josh, I just sent a request to unmute you. You should be able to unmute yourself. Josh. >> Hey, thank you. It's Josh Selch. We live west of this proposed development. It is really close to 99th Street, and the amount of homes proposed to be built there. It's already a pretty busy road. My wife has personally been in two incidents on 39th Street. Coming into this area. It does get pretty busy with proposing 20 some homes being built there. You know, raises a lot of concerns about congestion. The the other thing I would note is, you know, we we live just across where the, the power easement way is and the road coming into our neighborhood into Sherwood Glen is the development there. >> There's that's where you, you. >> Live in Sherwood Glen. >> Yes. Okay. Correct. We we see people parking there who. We have no idea who they are. We see garbage being dropped off into the entrance of our neighborhood. You know, not saying that that, you know, these folks would be doing that, but there is definitely a change in the neighborhood. >> That illegal. >> Dumping, you mean? >> Yes. >> Okay. >> Yeah. We in fact, we've had I was just having a conversation with the neighbor on person who is sleeping in their car into the entrance of our neighborhood. There are several families in the neighborhood that have kids. In fact, the bus stop is right there on the edge of 39th and 100. And first that comes and picks up the kids, and that's going to be very close to where this proposed development is. >> Okay, okay, let's see. I didn't see you. Did you have a written you have one comment in the record. I see exhibit 12. >> Yes. >> Okay. And if any anything else occurs to you, feel free to submit additional written comments. >> We will. And I just echo Jacqueline's comments about, you know, the the land has been bought there. You know, it's their right to develop the land. We're just asking for consideration for the existing neighborhoods. >> Yes. >> Okay. Thank you. >> Thank you. >> Who else would like to testify in opposition? And when? Richard. >> I'm not seeing anybody else. >> Okay. Mr. Williams, we're going to have the record stay open after tonight. But you can take a. You have final rebuttal tonight, and usually you can take that as an opportunity to respond to any of these comments or you don't have to take this opportunity at all because the record will stay open and, and you'll have further opportunity for your for final rebuttal in written form. So it's your pleasure. >> Yeah. No further comments. >> Okay. Thank you. Take it back to staff. Anything staff would like to add? >> Yes, I got just a couple quick things to add. I'll make it fast. I'm going to get back and share my screen. I just want to I just want to bring up the. >> The most recent proposal. >> Do you see the plot on the screen now? >> Yes. Is that. >> Exhibit 33? Where are we? That's from the original application. This hasn't really changed, has it? >> I think there's some minor changes. I think. >> 27. >> Yep. Well yeah. And 35 is the most recent plot revised exhibit 35. >> Okay. You're right. >> So just quickly, the only thing is I want to mention is that. And I didn't, I'm not sure if I understood Paul correctly, but he talked about removing, possibly maybe removing parking or something about the parking here that's on the, on the hammerhead or the extension of the hammerhead. I just want to keep in mind that, you know, with 25 lots, they were required to have nine guest parking spaces with 24 lots. It's actually down to eight. So they do have to provide eight guest parking. And they're showing that on the plan. You can see there's eight, seven, six and then the other ones are along here. They do comply with it, but I'm not so sure they can. I mean, maybe I misunderstood. I just want to make sure we can't. Remove. The applicant does have to provide eight guest parking spaces. So I just want to make sure that was clear. Second point. And this is really and maybe we should get get information from Craig Criddle. But if the applicant is going to be submitting a new traffic study, I think we're going to have to be going for a long record period because obviously the applicant has to has to resubmit a traffic study. I don't know how long it's going to take for them to get the revised traffic study. How long will it take for Craig to review that traffic study and internally what they have to do? I mean, I would suggest it's weeks, but let's have. >> Craig write in all these open record things. As I mentioned before, the applicant has the burden of proof and demonstrating compliance with all the criteria. And. And generally speaking, I give the applicant the time that they need to do that. So we'll start. When we get to it. We'll we'll start with how much time Mr. Williams needs to submit whatever he wants to submit, and then we can talk about response times for that. So you're right, it'll take a while to, to, to make sure that he has time to do what he needs to do here. >> My last point is the comment that Jacqueline Jacqueline made about the solid waste and recycling pickup. As you can see, you know, if you look at the code section in the narrow lot standards, it talks about joint driveways that there's a concern of. As you can see here, the applicant is providing even though it's a private road, it's it's it's wider than than most private roads. It's 24ft. It looks like it's 24ft of pavement. So this is adequate for the trucks to pick up solid waste and recycling. And so, you know, if it was a smaller width and the private road that was 12 or joint driveway for 12ft, then we would look for a collection point. But since since they're providing 24 foot paved areas, then this is adequate for the collection points. I know, I know, maybe some neighbors wouldn't think it's adequate, but it is adequate. >> If this were a public street, how wide would it be? Do you know the standard for that? >> You'll have to ask engineering on that. But 24ft wide does allow parking on both sides, if I'm not mistaken. So and of course, they're only proposing parking on one side, so. Well, it could be both sides, but that's what the code says and that's all I have. >> Okay. Thank you. Okay. Now is the time to talk about the open record. So I'm going to start with you, Mr. Williams. Today is September 10th. How much time do you need to submit everything that you want to submit? To either respond to or satisfy or whatever? >> Yeah. I mean, the the items that need to be addressed in the traffic study are easy. I can submit them by next Wednesday. >> Next Wednesday. So you just need one week to submit everything that you want to. >> Everything I desire. Yes. >> Okay. One week. So we'll give you a week. Staff. How much time do you think you'll need to review the new submissions? And for those of you in the public sector looking to comment on this, you can expect some changes to this proposal that will hit the deck on the next week about the 17th or so. And I take you want to get a copy of that and see what's been submitted, because it may affect the comments that you have submitted or want to submit on the project. So members of the public keep that in mind. So staff, what do you need? So, Mr. Cado, you'll be reviewing this and who else? Mr. Dawson and Richard. >> For the record, this is Craig. I would request up to two weeks for review. >> Okay, so that would get to October 1st is two weeks out. How's that set with you, Mr. Dawson? And Richard. >> I guess I have a question to pose. Paul mentioned some things during tonight's hearing that were not in the last road mod. So if Paul wishes to formally present those back as a increased scope or slightly different approach than the wording that he used previously, I guess I would ask for a three weeks to review any revised road mod. If he doesn't wish to provide that during the open record period, then I guess it defaults back to Craig if he has the only new information to review. >> That's true, but he said he only needed a week, so at the end here I'll. I'll circle back to Mr. Williams, see if he wants to stick with the week or what. It's his pleasure because he has the burden of proof. So anyhow, you want three weeks, Mr. Dawson, so. And, Richard, there'll be some changes that get into the land use Department as well. So your opinion matters. >> Yeah. There will be some I think if you're if the second period open record, we said the first was just a week. We'll see how that goes. Second, you said two weeks and then maybe change it to three weeks. That's more than either 2 or 3 weeks is adequate. >> Okay, okay. >> That's fine. >> Okay. Here's what I'm here's what I'm shooting for one week for the applicant to submit whatever, you know, revised Platt, revised road mod supplemental traffic study. All that and anything else. One week. So that'd be the 17th by 5 p.m. in the county's hands. And then staff gets three weeks to review that and gel that with what was previously submitted and churn out new staff recommendations. So that gets us to the 8th of October. And also, I'd add the public. They their opinion matters as well has. I would say you should have until the eighth to submit comments on the revisions to the application, but also the the once the staff submits their revised recommendations on the 8th of October, the applicant and the public can weigh in and respond to staff's new recommendations. So, Mr. Williams, since I have you online, assuming staff's recommendations after they've reviewed your new submittal come out on 8th of October, how much time do you need to digest and respond to staff's new recommendations? >> I do have one question Alastair mentioned about resubmitting a road. I'm a little bit confused on that because I believe the road mod talked about sidewalk for the hammerhead and of course the cross circulation. Is Alastair wanting me to put this proportionality and intersection spacing in the road mod. So the road mod team can take a look at this. I'm a little bit confused if. >> You're using those arguments to justify your road mod request, I think you should include it. Yes. >> Okay. So okay. Once again, I'll submit all the new stuff on the 17th and okay, I guess then the controlling factor is not necessarily the traffic because traffic needs two weeks. And it looks like Alastair wants three weeks. >> But I think staff and staff in general, I'll give, you know, staff as a as the body three weeks to get every everything digested and spit out new reports. All collectively staff has said three weeks would do the trick. And I think the heavy lift will be not maybe not so much concurrency, but development, engineering and land use, I think. Plus you need to talk to the fire department, the fire marshal, if you want us to want some something to change on on street parking or street widths or those sorts of things. But keep that in mind as well, okay. >> So just one week for me to respond to staff's comments. >> Okay, so that'll get to the 15th of October. So I'll give you and the public a week to review staff's new recommendations and analysis of what you've submitted. So staff should kick theirs out by the 8th of October. You and the general public have until the 15th to respond to all of that. And there may be new and interesting stuff for you, Mr. Williams, in the public comments, I don't know. That will come in on the 15th, but generally you would have then one week for final rebuttal if you want it. So that would get you for your final rebuttal. October 22nd. If you if you want it, you could waive that once you see what comes in on the 15th and you can say skip it. And the record would then close on the 15th. Does that make sense? >> Yeah, that makes sense to me. >> Okay. All right. So I guess, Miss Cruz, Mr. Selch, you've been listening in. You were the people who testified tonight, but there may be others. Have you been tracking this open record discussion? And do you understand where we're headed and the time allowed for the applicant and for the public and for staff to have time to review and comment on all of this stuff. >> Yes, Jacqueline. >> Go ahead. I'm sorry. >> Oh, no. It's okay. This is Jacqueline Cruz, I understand, thank you. >> Okay. Mr. Selch, you okay with what we've been talking about? >> I had I, I had to unmute them, so I just did that. >> Okay. Mr. Selch, you can talk now, I think. >> So, yes. We understand. >> Okay. Okay, good. All right. So we're going to do that. Let me let me put this on the record. The here it is September 10th. So the applicant has until September 17th. To submit everything it wants to supplement or revise his application and proposal, including the road modification to satisfy or not satisfy what staff is looking for. September 17th at 5 p.m. Then staff. All staff. That large body of staff have three weeks until October 8th to kick out new recommendations or after they've analyzed everything that the applicant has submitted. So September October 8th is when staff will kick out their comments, and I would recommend that members of the public. You have until the eighth to also provide comments on whatever the applicant submits on the 17th. So after everything comes in on the eighth, then the applicant has until October 15th and the public have until October 15th to provide a response to staff's new recommendations. That's 5 p.m. on October 15th in the county's hands, and then the applicant has the option of final rebuttal. October 22nd at 5 p.m. which Mr. Williams can waive, and the record then on the outside, the record will close on the 22nd, and that should be that will start the clock for me to digest it all and render a decision approximately two weeks after that. So that's what I'm going to do. And therefore this item, this hearing is concluded, but the record is left open according to that schedule. Thanks to all of you. And let's roll into the next item. >> If we can. >> All right. I'm up next. Let me get my screen shared here. >> Take your time. I'll give a quick announcement. Heartwood North Pole 2025-114. >> All right. Can you see my slides up there, Mr. Jesser? Awesome. All right. Good evening, Mr. Examiner. County staff and the general public. For the record, my name is Marion Bateman. I'm a land use planner with Clark County Community Development. And the project before you tonight is the Heartwood North subdivision. So for this development, the applicant is proposing to divide three parcels containing approximately 33 acres into 146 single family detached lots. They're doing this in four separate phases, and the site is located in the R1 five zoning district. The applicant is Ax engineering and the owner is Greg Kubicek with SG development, and the site is not currently addressed, but it lies south of northeast 119th Street and east of northeast 132nd Avenue. So as I mentioned, my name is Marion Bateman. I'm the review planner for this project. The review engineer is Alistair Dawson. The review biologist is Keith Radcliffe. Jason Noble reviewed the application for fire safety. Craig Cordell was the transportation concurrency reviewer, and Hunter Decker reviewed the forest practices side of the development. So here's an outline for tonight. During this presentation, I will provide an overview and summary of the proposal, identify any major outstanding issues or concerns. And then ultimately we will make our >> Our recommendation to the examiner. Okay, so here is the vicinity map. The subject site is identified by the black dots. As I mentioned, the site consists of three separate parcels and it is located approximately 1300ft south of northeast 119th Street and about 1300ft east of northeast 132nd Avenue. Here's the zoning map. The site is located within the R one five zoning district, and it abuts other R one five zoned parcels, mostly to the northeast, south, and west with a pocket of high density residential abutting to the northeast corner of the site. And then there's BP zoning as well. Abutting to the east along the east perimeter. Okay, so this next one is the site map. It's an aerial view of the site showing current conditions. You can see the site is heavily treed and is surrounded by established neighborhoods. You can also see the existing streets which terminate at the property boundaries of the site. In the next slides, I'll show the plan so you'll be able to see all the proposed street connections and everything, but it's going to fit fit in there nicely within that pocket there. So here is the proposed preliminary plat. This is in the record as exhibit 27. And I actually have two slides here. So I can toggle between the two as needed. So yeah so this one's showing the north half. The other slide shows the south half. As I mentioned, the applicant's requesting to subdivide three three separate parcels containing about 33 acres. And they're proposing 146 single family detached residential lots. Also proposed are several public streets providing on site circulation. As I mentioned, they're proposing multiple tracks that will be dedicated to couple different things stormwater facilities, open space areas. And then there's some preservation of on site critical areas as well. And the project, as I mentioned, is proposed in four separate phases. So kind of breeze over that for now, but we can always go back to the plan. So next I'll show some site photos. Okay, so here I am standing on northeast 112th Street looking west across the site. This will be a future street connection. You'll see a bunch of these. Let's see here. I'm standing on northeast 142nd Avenue looking north across the site. Another future street connection. You can see the site's pretty flat, with just a lot of existing trees and shrubs. And then another one from northeast 142nd Street, but looking northeast across the site. And then here I'm standing on northeast 109th Street, looking west. There's their development sign located on 109th Street, and you can see the established residences that border the perimeter of the site there as well. And then this is just look in the other direction on 109th Street, looking northeast with another future street connection there. So lots of, lots of connectivity for existing streets. And so that's it for site photos. So I will go over the staff report and recommendation and the project timeline. So the application submittal was received by the county on December 12th 2025. The application was deemed fully complete. March 3rd, 2026. The Notice of Development application was issued on March 26th, 2026. The application was then placed on hold pending additional information, and so we issued a notice of canceled hearing on May 7th, 2026. And then the hold was removed, and we followed that up with a separate notice of hearing date on May 26th, 2026. And then staff's recommendation to the hearing examiner was issued on May 28th, 2026, which is exhibit 51 in the record. But then at the June 11th hearing, the applicant had requested a continuance due to some public notice issues and potential outstanding concurrency issues. So we had agreed on tonight's hearing date of September 10th, and then we issued a notice of New hearing date on August 25th, 2026, and then a revised staff report and recommendation was issued on August 26th, which had some corrections to it, including the new notice details, some corrections to the critical area findings, and a few other minor corrections to some of the development engineering findings, I believe. So that revised staff report is in the record as exhibit 102. So for project issues, there are a couple, one of which are the traffic concerns pertaining to this development. We had many public comments submitted regarding traffic, and I believe we also have some folks here to testify. I'm not sure if it'll be related to the traffic traffic, but I think that's the biggest issue to discuss as far as, you know, issues that were raised in public comments, the other issues raised by public by public commenters, I think were sufficiently addressed in this in the staff report. We can always revisit any, you know, any of them that we need to, but I'll let the applicant address the concerns around traffic, especially since we had some, you know, concurrency analysis added to the record, both by neighbors and by the applicant to address those traffic concerns. So I will move on from the traffic issue for now. The other project issue has to do with the Oregon white oak woodlands that are on site. So I'm going to hand it over to my supervisor, Brant Davis, to present this portion. >> Okay. >> Good evening, Mr. Examiner. I'm Brant Davis, I'm the land use review manager as well as the Wetland and habitat review manager. So I am putting on my habitat hat tonight for this presentation. There's an unusual aspect to this application regarding request for reasonable use assurance as it relates to the Oregon White Oak Woodland habitat that's on the site. So I just wanted to go over staff's analysis of this a little bit. It's presented in a lot more detail, both in exhibit one and exhibit 102, I'm sorry, exhibit 61 and exhibit 102. The references in this presentation refer to exhibit 61, primarily because I did not update it after the continued hearing. So. Just a little bit to to start this off, the photo here shows the critical areas mapping on the site from, I believe it's exhibit 32. The applicant's mitigation plan. So there's 148 priority habitat White Oaks identified on the site. The canopy of those oaks covers approximately 2.35 acres, and that represents about 7.1% of the entire site area. Another critical element is that the distribution of these oaks does not meet the definition of a white oak woodland stand. In the oak habitat definitions, there are essentially two types of oak woodland habitat individual oaks, as well as as stands when there's a certain density of oak canopy relative to the surrounding forest. And this distinction is important because generally with the stand, the entire unit is considered the habitat, whereas with the individual oaks, only the oak canopy is considered the habitat. Next slide please. So because of this difference with just the individual oak canopies actually being. The portion that's defined as habitat, with a distribution that's still relatively high density, it can make it difficult to develop in between some of those oaks when they're close enough together that you can't don't have room to build a road or place a house and still avoid oak impacts. And that can create conflict with other comprehensive plan policies, such as, you know, housing and housing density and ultimately housing affordability. So the Washington Department of Fish and Wildlife is our state agency with expertise in priority habitat, including white oak woodland, and they have provided very detailed science based recommendation for how we assess oak woodland functions and how we prescribe mitigation that, in their scientific view, is sufficient to replace all of those functions over time. However, it is important to note that the critical areas language in the GMA talks about functions and values and w d, f, w s prescriptions do not consider values or broader land use policy or property rights issues. They are not a regulatory agency. They only provide a framework for defining what the what we regulate as habitat and providing recommendations on how those habitats are managed. It's up to the local jurisdictions to develop policies around the GMA mandates. The Growth Management Act mandates for critical areas. Protection. And. To date, the county has not developed a specific oak woodland mitigation policy. There is provision in in the Critical Areas ordinance that grants the county authority to develop. Mitigation recommendations. And we have not specifically done that for Oak woodland. Next slide please. So with regard to looking at the reasonable use assurance question. We believe that it is important in the in this context to. To consider best available science and the way that it's framed in the Growth Management Act, which is that we have a requirement to consider best available science in developing our critical areas policy. We are not we are not strictly required to apply the best available science without any other considerations. So in this particular case, because of that spacing of land between the individual oaks, there's a loss of otherwise developable land that is necessary in order to protect those, a lot of those individual oaks on the site. And that creates conflicts, as I mentioned earlier, with some of the other comprehensive plan policies. So just to bring this back to this current proposal, the applicant is proposing to protect several oaks in tracks, which is what the Critical Areas ordinance requires. If you're going to set aside habitat in a subdivision, it has to be in a tract. So in those tracks that they have proposed, there's 2.31 acres of of developable land that is protecting about a half an acre of oak woodland. So essentially. So which. >> Which, which of the tracks again, see. >> There's several. I don't have that. >> C is the big one. >> Yeah. C is the big one, which includes the wetlands, but there's several smaller tracks. Some of them are similar to the lot sizes. Okay. Scattered throughout the development. And many of those tracks have 1 or 2 oaks within them. >> Okay. >> And, and in our analysis, protecting additional oaks in additional tracks would disproportionately reduce the developable area of the site even further. And in our analysis, reasonable use question aside, we believe the applicant has met their burden with regard to our avoidance and minimization standards. And I can explain a little bit more about that in the next slide, please. Oh I'm sorry, I'll back up. So as part of their avoidance and minimization work, prior to submitting their application, the applicant reached out to county staff and Department of Fish and Wildlife biologists and walked the site with a county biologist and a fish and wildlife biologist. And as part of that process, they increased the amount of oak that they were retaining by about 7%, 7.5%, and focused on specific oaks that the Fish and Wildlife biologist identified as being a higher priority for protection. And in addition to that, we believe that, you know, changing the plan either to reduce lots or to try to reduce infrastructure, you know, infrastructure doesn't yield much more in terms of oak protection, primarily because of the cross circulation that's required to connect to all of the surrounding development and the stubs that have been either approved or constructed. And we did not see a way to to meet those requirements that would have less impact. Next slide. I'm sorry, this slide's good. Yes. So just to, to, to talk about why the applicant is requesting a reasonable use assurance. It's, it's not because we can't come to an understanding about what we think is adequate for avoidance and minimization. It's because of the, the effect of the mitigation guidelines that Fish and Wildlife has published, that it's essentially financially unreasonable and practically impossible to achieve for the impact that's proposed. And exhibits 102 has findings that go into the details about that. But essentially, in terms of buying mitigation bank credits, there aren't enough credits available on the market to meet the mitigation burden it would require to do concurrent mitigation on. Off site land. It would require acquisition of of up to 17 acres of additional land that is appropriate for mitigation. And that court. In addition to the potential cost and impact that that would have to the development, it's not likely that the applicant could find one site that could meet those requirements and may have to, you know, would likely have to negotiate agreements with multiple landowners and multiple locations and manage mitigation plans spread geographically across a large portion of the county. So we analyzed the fiscal impact of mitigation based on the financial analysis that the applicant provided. I believe it's exhibit 33. And. In that analysis, we concluded that purchasing an additional 0.95 acres of white oak mitigation bank credits would be where we believe the reasonable use threshold lies. We base this on applying a factor of 6.5% to the estimated gross value of the proposed development, which is again provided by the applicant in exhibit 33. >> I don't think this is exhibit 33, but. Well, Marion, kind of adjust this later, but. >> I'm sorry, I let me back up. You're correct. It's it's exhibit one, tabs 32 and 33 that I meant to. >> Oh, okay. From the original application. >> Yes, yes. Okay. I apologize for the confusion. All right. Next slide please. So in conclusion, we believe that the reasonable use of assurance threshold is met, provided that the applicant proposed purchases, the additional bank credits that we've included in our conditions, which results in a total of 2.922.29 for Oak bank credits, as opposed to the 1.34 for that the applicant proposed in their mitigation plan. And that. >> So that's that's your recommended requirement is 2.29 for Oak Bank credits. >> Yes. And that's in addition to the wetland mitigation that's proposed as well as the mitigation. And there is also an element of on site oak mitigation as well. We're doing about six I can't remember the exact number, six point over six acres of on site mitigation between wetlands and oak woodlands. They're doing oak enhancement and oak creation in those areas that are not oak woodland in their tracks that they're proposing. >> So is there did I hear you correctly? There's snag credits or they'll just be snags on site. >> There. There thing to do. Yes. Snag mitigation on site. >> Okay. I've never heard of snag credits, so. >> Well, we do have a bank that does will have snag credits in the future, but they don't have them yet. >> The snags have not been created yet. >> Correct. Because it's in their next phase when they it's an oak bank. And when they do the stand enhancement for the oak, they will be removing Douglas fir, which competes with the oak. And they're going to convert some of those firs to snags. They're just going to girdle them and kill them. So they become snags and no longer compete with the oak, but provide snag functions. >> Okay, I wondered how that would work. Okay. >> All right. That's my contribution. >> Okay. Thank you. >> Thank you. Brant. Oh. >> So what else? Staff. Marion, what are you. >> Yeah, that's that's it for staff. Really. I'm on my my last slide. Just to say overall we recommend approval subject to the conditions of approval identified in the revised staff report or exhibit 102 in the record. And that's the end of my presentation. So I'll remain available for any questions and I'll have the plan up. >> Okay. Thanks. I don't know that I have any particular questions for Alistair this time. The questions I have, I think, are for Mr. Caudill on concurrency. And these questions come up about from public comments about the concurrency analysis, particularly from comments from Erica Frazier and Heidi Posel. So I think those are Craig Caudill issues. >> Yes. >> Yeah. >> All right. Let's hear from concurrency. >> Yes, sir. So I was not able to review all of the public testimony for this one. So is there a particular question that. >> Yeah. So the comments I see are very similar to those that were addressed by the county in hearings, examiner in, I think, 174th Avenue subdivision that just just got appealed to Superior Court. And either you or Mr. Jardine took the laboring or on the county's part to respond to these identical questions about interpretation of the code concurrency requirements as they pertain to street segments and the maximum allowable volumes. And since this exceeds the the codes volume to capacity limit for what is it? >> 0.9? Yeah. >> So nine on is it 119th. >> And 119th and northeast 99th Street. And they're both from SR 503 to northeast 124th Avenue. >> Yeah. >> So so concurrency in the Clark County code. 40.3 5020G1A that is considered the prescriptive method for analyzing volume to capacity. And obviously, in plain English, it states that the volume capacity ratio needs to be less than 0.9. This. This method is based on a fixed single direction capacity per hour for each direction of travel, and the. And it's outlined in table 40.35020-1. And it's based on, you know, the classification of the roadway. So one thing to keep in mind is the concurrency code also states in Clark County, code 40 .350020 in the F section that the operating level for a transportation corridor shall be defined as the traffic characteristics of those roadways and intersections with. Considering the following factors and f nine. Allows any other factors that the Public Works Director has determined could have an impact on the operating level of the transportation corridors or intersections. So these corridors don't necessarily meet the prescriptive method, but there are other factors that. >> Clearly they clearly don't. I think that's fair to say. They clearly don't know. >> And so another thing to consider with the failing volume to capacity ratio is if you look at the background volume to capacity ratio, if this development weren't to be developed in the. In the build out year, the background information. >> Even without this development, the volume to capacity. >> Without this development, if I don't have those numbers right off the top of my head, but I know it's under 0.9, I think it's around 0.6 somewhere around there for northeast 99th Street and northeast 119th Street in the eastbound and westbound direction. But for the background conditions for northeast 119th Street, there, they would be at 1.09 using the prescriptive method, right, for the build out year, they're at 1.10. So to me, the way I'm interpreting that is volume. Capacity ratio, regardless of this development, will still be over 0.9 using the prescriptive method. But the prescriptive method isn't including factors like lane width, the presence or absence of shoulders, heavy vehicle volumes, roadway grades, certain factors that the Highway capacity manual does take into consideration when calculating volume to capacity ratio. >> So so those those, those because I, I look at the code and f sub nine was it f f sub nine. Any other factors that the Public Works director has determined could have an impact on the operating level of the transportation corridors and intersections is extremely nonspecific. But you say there are specific factors in the is it the trip generation manual? >> There are not the trip. Well, there may be, but not the factors that I'm referring to come from the highway capacity manual. >> Okay, that. So I'm unaware of that. So go ahead. >> So I'm I'm not extremely familiar with all of the factors, but some of the factors are lane width, presence or absence of shoulders. And these factors all need to be considered with these corridors or any other corridors, as well as the intersections that bound these corridors. Because if the intersections that bound the corridors have acceptable level of service in the build out year, that would allow more traffic to flow through and real, you know, looking at this from real world scenario would allow more capacity through, even if the concurrency code says 1800 is the limit, or in this case, 900. 900 would be the limit. >> So this is am I correct? This is this whole issue is a corridor, a street segment capacity issue. It's not an intersection capacity. That's that's inadequate. >> Yes. That is correct. >> Okay. Because I'm I'm used to seeing intersections that are that don't meet the capacity requirements. And this is kind of maybe the first street segment. >> Yeah. And northeast, the intersection of northeast 119th Street and northeast 132nd Avenue did not meet concurrency code requirements. So they are volunteering mitigation, right? Intersection, but every other intersection that was analyzed meets the concurrency code requirements. >> Okay. I guess, I mean, I the, the opponents here, Miss Frazier and Miss Poso submitted. A lot of the documents out of the 174th Street subdivision. And there were a number of pithy staff memos that I didn't I didn't read them in detail, but may address what you've just attested to. And it strikes me that this record needs that kind of staff response focused, detailed staff response to these issues. Because, quite frankly, the just looking at the issues as they're raised and looking at the code provisions implicated and looking at the. The, you know, what, how much discretion staff has. And then the underlying purpose behind concurrency, which comes out of the Growth Management Act and is expressed in the administrative code. I think their points are valid. So I would really like to see this kind of response in writing in this record. Is that possible? >> Yeah, yeah that's possible. I would just need a little more time to review all of the written testimony. Unfortunately. There's a lot to review it all. >> There's a ton of public comments here, but a couple of them are extremely focused. So let's see. Miss Frazier's Exhibit 89. Miss Pozo's, exhibit 64, and I think also there's another one here. Where is it? Mr. Thalberg's comments. Exhibit 62. I think that that in in my view, captures the issue. And Miss Pozo submitted all the stuff out of the 174th 174th Street subdivision is now in the record here. So. >> Okay, I will review all of those exhibits. >> Okay. Because I'm not sure, you know, based on the record as it currently exists. I, I'm, I am doubtful that I could rule the same way that Mr. Turner ruled on 174th Street subdivision. So he had the benefit of your focused of concurrences focused response to these issues. Okay. I think that's it for. Unless there's anything else that anyone on the staff side wants to submit, I'm ready to turn it over to the applicants presentation. Does it seem right? Okay, applicant go ahead. You're up. >> Thank you. >> Good evening. Can you hear me? >> Yes. >> Hi. My name is Dave Weston, land use planner with ACS engineering. And I'm here on behalf of the applicant. First, I'd like to thank staff for all their time and effort that they put into reviewing this application. It is appreciated. We'd like to state that we support staff's revised staff report, which is exhibit 102, with the following correction, which was originally addressed in exhibit 90 but was not updated in the revised staff report. Exhibit 102 since the new revised staff report added some pages, the requested change is now on page one or page 32. Finding for. It's the second paragraph and I believe it's just a scrivener's error where they list that they evaluated right and left turn lanes on northeast 107th Street, and we believe that actually should be northeast 109th Street, which is the street that cuts through the center of our site. >> So that's page 31. >> I think. Marion. >> Hang on one second, I'm getting there. >> That would be. >> Transportation finding for. >> 32 finding for turn lane warrants. >> Yeah. Okay. >> Yeah. >> Ninth Street. >> I see you see on page 32 of 56 finding for turn lane warrants. Are you still not finding it? Mr. >> I got it, I got. >> It, I think. Okay, yeah, part of it is I, I have part of the old pagination. So, so this is on page 32. >> Yeah. >> Okay. Got it. >> And then the last thing I wanted to discuss was the question on which tracks were including the oaks that were being preserved. And then in addition, mitigation and enhancement, those are tracks B as in boy, C as in Cat, F as in foot. H is in hand, and G. >> Those are the oak tracks. >> That. That is correct. Some of those have additional items in them, like wetlands and buffers. But yes, those are being retained in those tracks. And now I will hand it off to Mr. Steve Morasch. >> Okay. Thank you. >> Good evening, Mr. Examiner. Steve Morasch with Lande 805 Broadway, Vancouver, representing the property owner. And I just briefly wanted to address the concurrency issue that's been raised, the 9/10 volume to capacity, and I was the one who litigated the 174th Street subdivision on behalf of the applicant. In that case, in front of Mr. Turner. And initially, Mr. Turner was quite skeptical about, you know, how could a development be approved if the volume capacity is already over 0.9 tenths with existing plus background, before we even add the new traffic from the development? Ultimately, as you can see in the decision, Mr. Turner ultimately agreed with staff's interpretation of the code, and I hope staff in this case does produce more detailed memorandum. As the examiner has requested. I would support that. I also wanted to talk about a couple of other legal arguments that that are not discussed in Mr. Turner's decision. Now, now, I understand you know that, Mr. Tanner, you're not bound by Mr. Turner's decision, but but I think the reasoning is persuasive. So that's why we submitted it in the record. But in addition to the in addition to the the interpretation Mr. Turner made, we made a couple of other arguments that he didn't address because he didn't have to address them, because he interpreted the code just based on the language of the code, which I believe he's correct. But but just so that you have the full picture, we made two other arguments and and they're both based on the Growth Management Act and different provisions. And the county's code has to be consistent with the Growth Management Act. It's it's sort of like the Constitution for the county's code. And in constitutional law, there's this rule that, you know, if there's two possible interpretations of a of a statute or a code, one of which is constitutional and one of which isn't, then, you know, you got to pick the constitutional interpretation, not the unconstitutional. In here. There's two provisions of the Growth Management Act that would be violated if the county interpreted the 9/10 volume capacity to be an absolute requirement that, you know, if it's not met, requires denial, regardless of what the county says under subsection F, which I think is the interpretation that the project opponents are advocating. The first is the concurrency statute itself in 3678, 070, the statute that establishes concurrency has a sentence in there that says that you're supposed to provide the applicant the ability to mitigate. If there's a concurrency problem and a strict reading of three of 435020GA wouldn't allow any opportunity for the applicant to mitigate. Because if you look at that section, it says capacity is based on the table, and the table says, here's your capacity based on the functional classification. So it doesn't matter what the applicant builds, the road will still have the same functional classification, even if the applicant adds additional turn lanes or excuse me, additional travel lanes to the roads, which wouldn't you know, that would be disproportional. But even if they did, it would still the capacity would still be based on the table and it wouldn't increase. So there's no opportunity for mitigation under the project opponents interpretation of the code. So that would violate subsection 070 of the Growth Management Act. Concurrency statute itself. There's a second Growth Management Act problem. And that is s rc W 3673 90 which is the moratorium statute. The moratorium statute says that if the county wants to adopt a moratorium, they've got to have a public hearing on it within so many days, they can only adopt a moratorium. That goes for six months. They have to have a work program. They could renew it after six months. And, you know, of course, the county hasn't done any of that here because the county's interpretation is that they can look at the actual way the road is functioning under subsection F, look at the highway capacity manual, and determine that the road's actually functioning adequately, despite exceeding the 9/10. But if you follow the project. >> Mr. Morasch so if I were to deny this proposal, is that a moratorium. >> I believe it would be. And the reason is, if you look at exhibit 65. Well, part of it is you should deny the other applications in front of you today as well, because they all send traffic to a road that is already exceeding 9/10. If you look at exhibit 65, which the project opponents submitted into the record, it's a memo produced by Daniel Stumpf, a licensed traffic engineer with PLS, and he shows all of the corridors in the county that currently do not meet 9/10 volume capacity based on existing plus background traffic. And there's a lot of them. I believe it's going from memory here, but 99th Street 1/19, 1/39, 1/79 SR 503 and the Patent Parkway all fail. Significant portions of them fail. And so theoretically, subdivisions within 1 or 2 miles of those corridors should be denied. If you apply this 9/10 rule consistently across all applications, because they're all sent traffic to those corridors. And so then, yes, it would be a moratorium on a huge part of the county, maybe not all of it, but a huge part of it would be stuck in de facto moratorium if, if the 9/10 volume capacity rule is applied as an absolute threshold, and if that is applied consistently to all applicants across the county, the result would be a de facto moratorium, as shown in exhibit 65. And so then our argument is that would also violate the the Growth Management Act. And so those were the two points I wanted to make in addition to. Then those are both in addition to the reasoning that Mr. Turner put in his decision. Now, he didn't need to reach those issues because Mr. Turner found, just based on his interpretation of the code, that the application could be approved because county met the subsection F factors, and that that superseded the 9/10 problem in subsection G. And so, you know, you don't need to reach these other two issues unless you disagree with Mr. Turner's interpretation. >> His decision doesn't have a whole lot of analysis on it. Basically, you know, finds that based on these the exhibits in the record, he goes with staff's recommendation. He doesn't really provide an analysis of it. And so I so I have to look at the, you know, what were the memoranda? What evidence did he see in his record that he got to basic. Yes. So that's why I need to see that in my record. >> And we can add those memorandums to the record. But I would hope that the county staff would put their own, you know, work for this subdivision because you were dealing with a different road. Right. But, you know, in a nutshell, I think, you know, what, what the county said and the other record and sort of in plain English was, you know, the corridors are functioning adequately, the intersections are functioning adequately. So the traffic is flowing. And because the traffic is flowing, you're showing a higher than 0.9 tenths volume capacity on the corridor. But because the corridors are adequately built and the intersections are all flowing, there's no problem. The traffic is, you know, it's moving, it's not backed up. And therefore the corridors are functioning adequately, despite the fact that they're exceeding this artificial 9/10 threshold, in a nutshell, is, I think, what they found in the in the other case, in their memorandum and their memorandum looked at the highway capacity manual and these same sort of things that Mr. Kaplan was talking cattle was talking about. >> And I guess what I'm looking for is he referenced the highway capacity manual that was that was new to me, but also what I look for from professional transportation engineers is a professional opinion. And that kind of catch all exception in f nine. It just it's just so like open ended so that it's almost an exception that consumes the Reule. And so it warrants a professional opinion about really why under the circumstances of this particular road segment, these other factors are X, Y, and Z. And in my professional opinion, the the road functions adequately despite the volume to capacity problem that that sort of thing. And you're right, it has to be kind of road segment specific in order for it to be, you know, relevant and probative, credible evidence in this record about this proposal and these roads. >> Yeah. And I would hope that the county would be able to provide that during the open record period. >> Yeah, yeah. Because the I think the opponents have briefed the issue extremely well. They've they've canvased the landscape on this issue. They've really focused in on it. And that's that's what I rarely see in these in opponent testimony, in these developments. And so it really caught my attention. >> Yeah. I think this is an issue that has been sort of hiding in the weeds for a long time, because these are not new code provisions, but it's just no one's ever raised it before until the 174th Street subdivision. Well, because it's been it's it's been a long time that, that, that many of these roads have already exceeded this standard with background traffic. >> Right. They're getting up there and it, it harkens back to the pipeline projects that that was a major showstopper. It wasn't a street segment deficiency, but it was a showstopper for a large number of projects that were forced to stall and communicate and come up with a comprehensive mitigation plan for this, this deficiency that stopped them all. So I don't know that we're there yet. And this would seem like. >> All development in the county. I mean. >> It could yeah. The implication of this is pretty broad. If if if what the opponents are saying is true, where would this end? There are a lot of street segments in this category. >> Yeah. They're shown in exhibit 65. >> Yeah. Okay. What else? >> I think that's all I have unless there's questions and we'll save time for rebuttal. We do have our traffic engineer here who can testify and answer questions if needed. >> I don't know that. And we did. >> We did submit a recent exhibit that addressed a number of the comments in writing, I think that was submitted yesterday. >> I did see that. 107 yeah. Yeah. No, I think that that that is seems like a sufficient response from the applicant's transportation engineer, but I think I and the opponents, they really want to hear from the county's concurrency engineers. >> Yeah, I agree. >> Okay. >> We would like to also thank you. >> I think is that it from the applicant side for the moment? >> Yes. Thank you. >> Okay. Thanks. Anyone out there wish to testify in favor of this project or in a neutral capacity? Raise your hand. Anyone? >> Richard. Not seeing any of those? No hands right now. >> Okay. Opposition. Who would like to testify in opposition to this project? >> We have the. If I think it's the Mashayla. I'm not sure if I'm pronouncing that right. >> Okay. Why don't you unmute them in order and we'll we'll we'll start. >> And it's just one group. Yeah, it looks like there lights green or getting green. >> Can you hear me? >> I hear you, yeah. >> I can hear you. It sounds kind of weird. Keep talking. >> Can you hear me now? Okay, let me try one more thing. >> Go ahead. Try again. It sounds like you're, like, talking through a long section of pipe. >> Can you hear me now? >> Oh, much better, much better. Go ahead, go ahead, introduce yourself. >> Good evening. My name is Aria Miranda Johnson. I recently last excuse me. I recently just got married and changed my last name to Michaud. I am a party of the record. >> You to spell your first name. It's a little tricky one. >> Yeah, it's a RIA. And my last name, MICHAUD. >> Okay. Got it. >> I am a part of the record. I live directly adjacent to the proposed Heartwood phase three development in the Plateau Manor neighborhood. If you go down to the second part of the development, I think it's the next page. My home is lot eight. It's directly behind proposed lot 90. I have three concerns that I wanted to highlight tonight that I did briefly address and exhibit 17, which are the changed hydraulic conditions, the protected habitat and the archeological resources. The biggest concern that I have is the hydrology. I previously submitted detailed written comments and photographic evidence that is in exhibit 17. So I'm not going to repeat all of that evidence tonight, but I do want to direct you to the before and after photographs showing standing water and draining immediately behind Plateau Manor and proposed lots 82 through 98. Those photographs document conditions after phase one grading, drainage and street infrastructure were completed. My concern is pretty straightforward that the hydrology information relied upon for phase three predates the documented changes to the water flows that have taken place after phase one development began. Keesee 43, excuse me, 40 .386 requires compliance with county stormwater requirements, and I asked that the phase one hydrology studies, if they adequately demonstrate compliance for phase three area when the physical drainage conditions have since materially changed since phase one even began. This is particularly important for proposed lots 82 through 98, which border the affected area and could put the existing homes, including mine, at further risk of flooding. I asked that those lots not be approved as currently proposed until current wet weather conditions are evaluated, and that all the existing vegetation in that area be preserved. In the meantime, I know I'm running out of time, so I just want to also address the habitat. I know we talked a lot about that since I submitted exhibit 17, The bald, we have documented a bald eagle in the area using the protected excuse me, the habitat, the Bald and Golden Eagle Protection Act protects bald eagles from prohibited disturbance, and I don't see that that's been addressed in any of the reports. I also don't see that there's been any addressed comments of how the 74 Oregon White Oaks that are being proposed to be removed, how it addresses the currently endangered species, the western gray squirrel that is native to Washington. I therefore ask that the examiner determine whether proposed mitigation actually counts for these habitat functions. And I'm out of time, so I will leave it there and provide additional written testimony. >> Okay. Thank you ma'am. >> Okay. Next up is Heidi. Heidi, I just sent a request to unmute you. You should be able to. >> Thank you. And thank you, Mr. Examiner. I just have one request. I appreciate your questions. On the concurrency topic, when staff submit the further analysis, I hope you give us time as the public to take a look at it before the record closes so we. >> Can I will you you heard the last case that it's fairly complicated when we leave the record open, just to provide that kind of back and forth. So for sure that will happen. >> Thank you. >> Okay. And I see you have quite a few exhibits in the record. So I think your issues are pretty well covered. But as they say, keep those cards and letters coming because there should be more in the record before this show is over. >> Thank you. >> Okay. Thank you. Who else? >> I'm not seeing anybody else raising their hand. >> Okay. >> Nope. >> Okay. I guess we're back to applicant's rebuttal. And maybe Mr. Morasch, if you're going to take the lead on that, we should talk about the open record period. And I don't think there's anything that you've suggested you need to submit in the open record period, but why don't you kind of get started and let's hear what you have to say. >> Yes. Thank you, Mr. Examiner. Steve Morasch again, I have very brief. All I want to do is point out that our traffic engineer's report is in the record as exhibit one, Tab 13, and this issue of volume capacity was addressed in our traffic report on page 30. And I just I'm just want to read two sentences from that report. And the report is in the record. So anybody can go refer to it. But at kind of in the middle of page 30, it says the overcapacity volume capacity ratio does not represent a roadway deficiency. Rather corridor mobility facilitated with acceptable signalized intersection loss. The 99th Street corridor segment appears to be constructed to its planned ultimate three lane configuration, and it is unclear what, if any, additional capacity can be provided along the corridor. So I just wanted to get that in the record, and we would still like to have a more detailed response from the county engineer, but our traffic engineer has responded to the issue in the initial report, and I believe that we have a couple people here from ACS and LS who want to address the hydrology issue briefly. Before we close for tonight and talk about how long of an open record period. >> Okay, good. Go ahead. >> Mr. examiner, this is Francis Naglik of biologist with Ecological Land Services. We performed all the biological studies on the site for critical areas, including wetlands, streams. There's not none except there are ditches. And there's also oak habitat. As you know, the referenced flooding in the ditches. The times we've been out there, we did not see that. But we do know that there have been at times downstream or down ditch flows off this property. They're not on this property where there was plugs from beaver dams that may have backed water into those ditches. I believe the beaver dams have subsequently been removed. The ditching district has that under control, and that should not be an ongoing issue in the future. ACS is here. The engineer. If we need to address stormwater and the way water flows on and off the site. So I think that's our answer to that. The sighting of a bald eagle is not surprising. The eagle can can use this area, but we have no knowledge of a nest site for bald eagle on there. And we had fish and wildlife out there in the county. So no, no critical habitat for bald eagle that we're that we're aware of. And right now they are not currently listed by U.S. Fish and Wildlife Service. Finally, Oregon White Oak, we have a very robust mitigation plan for that. As as you are well aware, and we feel like our mitigation plan stands behind that. Thank you. >> What about the squirrel? That's the first time I've heard the Western gray squirrel mentioned. Is that was the squirrel on your radar screen? >> Well, the squirrel is on everybody's radar screen. Unfortunately, it's not here in Western Washington because it's been pushed out by the eastern gray squirrel. But the potential for some day, the Western gray squirrel will return to western Washington with oak trees remaining, which we're doing and keeping the habitat available for them when and if they are able to fight their way back into existence. In the western side of the mountains. >> I have a lot of eastern gray squirrels in my yard, so I. I await that reversal of fortunes. Okay. Okay, I think that's it. That makes sense. So it's time to talk about the open record. And I didn't hear that the applicant wants to submit anything during the open record period. So I think it's just just staff. So Mr. Caudle I think that's that would be you. >> Yeah. Can I request up to three weeks during the open record period for review of all the public comments and to get a response. >> Okay. So that takes us to the 1st of October. That's three weeks out. One, two, three. Yeah, 1st of October. And for you to submit your materials and I assume they'll, it'll be as thorough a response as was submitted to the 174th Street Subdivision record. The the applicant and the public have a chance then to respond to that. So I would. I guess Miss Pozzo is there, but I was thinking one week or two weeks to respond to whatever staff produces on October 1st. Miss Pozzo, are you there? I wonder if you could, Richard, if you could unmute her microphone just to see. How much. >> Time should be able to talk now? >> Yeah. I'm here. That's fine with me. There are other people who have submitted comments, so I can't. >> Erika Frazier also hit hit the issue to. >> And I can't answer for her. But okay, one week is sufficient for me. I think, you know, it's up to you on what you want to grant for everyone else. >> Okay, okay. >> Fair enough. Let's see just one second here. Okay, so how about this? And I guess let me shoot it back to you. Mr. Morasch staff needs three weeks. That takes us to October 1st. Miss Pozzo said she could see what's. I don't think it would be a big surprise what his staff may submit on this in. In terms of analysis, it should be similar to what she saw in 174th Street. She asked for a week, which gets us to October 8th, and then you as the applicant, you have the right of final rebuttal. I think, after that. >> So yeah, one week. Is yeah, that sounds fine. One week for final rebuttal, we we may submit our rebuttal early and waive the remainder of the one week period just to get it to you quicker. But at this point, I think I'd like the one week rebuttal to submit my legal arguments. >> Okay. That gets to 17th of no it doesn't. It's the 15th of October. Okay. That's what I'm going to do. Staff three weeks. You've heard the discussion tonight in terms of more detail on the concurrency recommendation here. You have three weeks to do that. Takes it to October 1st. The the applicant and the general public have a week to review and respond to that. That's October 8th. And then the applicant gets final rebuttal until October 15th unless waived and the record closes earlier. So does that make sense? Is that okay with everybody. Any objections? Okay. >> That works for us. >> Thank you. >> Okay, okay. That's what we'll do. We wait. Further info on this case. I will conclude the hearing on this item now and keep the record open according to that schedule. >> Okay. >> Thank you. >> Thank you. That is it for that one. We roll into Arden Estates, a cluster subdivision. Yes. >> Which is also mine. >> On an old zone. EAG ten. We don't get too many g ten subdivisions these days. >> Hopefully this is our last one. >> I was wondering because. >> I think it is. I think it is. >> A few of these. >> Yeah. >> I think we should ask Mr. Sterling since he seems to have all these. Kind of built a cottage industry on these things. >> Yeah. >> Okay. Whenever you're ready. >> All right. Good evening, Mr. Examiner. County staff and the general public. For the record, my name is Mary Ann Bateman. I'm a land use planner with Clark County Community Development. And my second case before you tonight is the Arden L Estates Cluster subdivision. So for this development, the applicant is proposing to divide one parcel containing approximately 70 acres into seven residential cluster lots and an eighth non buildable remainder lot containing 61.7 acres. The site is currently zoned AG 20. However, the application, as was just mentioned, is Contingently vested to the AG ten standards that were in effect at the time that this application was originally submitted. The property owner is listed as Darryl Jermann. The applicant is Sterling Design and the contact person is Joel Sterling, and the site is located at 17802 North East 88th Street in Vancouver, Washington. All right, so as I mentioned, my name is Mary Bateman. I was the review planner for this project. The review engineer was Alistair Dawson. The review biologist was Lance Watt. And Jason Noble reviewed the application for fire safety. And then Craig Caudill was the transportation concurrency reviewer. All right. So for the outline for tonight, I will provide an overview. First of the proposal, go over any outstanding issues, and then we will make our recommendation to the examiner. So here's the vicinity map. The subject site is shown by the black dot. The site lies on the north side of north east 88th Street, about 700ft east of northeast Ward road, and you can see Shanghai Creek there shown to the northeast of the black dot. That's the north end of the parcel there with the creek located on it. You'll see that in a little better in one of the next slides. So here's the zoning map again. The site is currently located in the AG 20 zoning, but it's vested to the AG ten standards that were in effect when it was submitted. So at that time it was AG ten zoning for the site and for those parcels to the north, east and west and to the south was and still is single family residential zoning. And here's an aerial view. So the site is currently developed with two single family residences. There are several barns and accessory structures, all currently contained within the southwest corner of the site. The applicants proposing to remove all of the existing structures with this development. And as you can see, the site is mostly covered in grasses. You can see again, you know where the creek is on the north end of the parcel there where the the green vegetation follows the water line. And so here is the proposed preliminary plat. This is in the record. >> As question. This doesn't have a forestry permit associated with it because I noticed a lack of trees. >> Correct. There's no forestry application. Okay. Got it. All right. So yeah. So this proposed plan is in the record as exhibit 45. This is sheet four of nine. So as I mentioned, the applicant's requesting approval to divide about 70 acres into seven developable cluster lots ranging in size from 1.1 to 1.6 acres. And then a non buildable remainder lot of approximately 61.7 acres, or 88% of the total site. The large remainder lot contains the on site critical areas associated with fifth Plane Creek and Shanghai Creek. And so. So it's proposed to be kept in a natural state and retained as open space with a conservation covenant. >> So the the current plan is exhibit 45. Do I have that right? >> Yes. Correct. And then this next slide here is just an enlarged view of the proposed cluster. Lots. Lots one through seven. So the applicant's proposing a 20 foot wide private road within a 30 foot wide private access and utilities easement to serve all seven lots. The proposed cluster lots include building envelopes, which avoid all critical areas, and those do meet the minimum setbacks for cluster developments. The applicants, also proposing a six foot high vegetated vegetative buffer, which is required to be at least 50% opaque year round within the first three years of planting. So this buffer is proposed along the south perimeter of the cluster lots, where they will but 88th Street, and then also along the west where they will abut the neighboring parcel. So this meets the minimum landscaping standards for cluster lots. No concerns there. So I will show some site photos next. Okay, so here I'm standing near the middle of the site's frontage on northeast 88th Street, looking northeast towards the site. There's the development sign and you can see one of the existing residences right there from the street to. And here I walked a bit further west along north east 88th Street. So I'm at the southwest corner of the site, looking northeast towards the site. You can see the existing trees along the roadway there, which is where that landscaping buffer will be placed along the street. And then here's a similar view just closer in. Again, you know, that landscaping buffer will extend along this west property line along the length of the proposed cluster lots. And you can see the existing structures back there as well. And so here I'm standing at the southeast corner of the site. So I'm standing at the northeast 88th Street and northeast 1/82 Avenue intersection, looking northwest towards the site. That's northeast 88th Street there on the left, and then 1/82 Avenue on the right, which is a private gravel road. And then another one just zoomed in a bit from that same spot with northeast 82nd Avenue on the right. So here we're looking at what will be the southeast corner of the remainder parcel, which will of course extends back further north away from 88th Street. And that is it for site photos. So I will go over the staff report and recommendation and project timeline. So this application was originally submitted back in 2017 under our old system, but it had been placed on hold for critical area issues as my understanding. And so it stayed on hold until we migrated it over to our new system in LMS and got the documents all carried over to resume staff's review. But because it had stayed on hold for so long and we had, you know, a whole thing once we got the new submittal uploaded and ready to review in the new system, we treated March 18th, 2025 as the date the application became fully complete so that we could route it for review and start the county's timeline. So March 18th being the new quote unquote fully complete date or our new routing date for for the timeline sake. So from there, the notice of development application was issued on April 3rd, 2025, and the project was then placed on hold. And so a notice of canceled hearing was issued April 30th. A notice of hearing date change was issued on August 26th, 2026. For this hearing date and staff's recommendation to the examiner was issued on August 26th, 2026, and this is exhibit 62 in the record. And then the development engineering findings. So the transportation, on site transportation and the stormwater and erosion control findings were issued two days later. So on August 28th, 2026. So that's exhibit 64 in the record. So for project issues for this one, the issue really comes down to the poor soils issue mentioned in the staff report. So under Clark County code 4210.010 dot E4B6, and this is from the AG ten standards. Yes. It states that cluster lots shall be created as follows. If located on agriculturally zoned land and to the extent not precluded by other provisions of this subsection to be limited to lands with poor soils or soils otherwise unsuitable for agricultural purposes. There was a previous AG ten cluster proposal that had been denied by the county because of the poor soils issue. This was Mountain Estates cluster subdivision, so Pldi 20, 2017-00046. This is in the record as exhibit 61. It raised issues such as how to define poor soils because it's not exactly clarified in our code. Another issue is, you know, to what degree can poor soils be located on the cluster lots. Because again, that's not really the code does not really give us more specific standards by which to apply the poor soils requirements. So the denial for Mountain estates cluster subdivision was then overturned by Superior Court. And this is in the record as exhibit 65. So I'm kind of breezing over this a little bit, just because I'd like to let the applicant have the floor to discuss the issue, especially since they were the developer for Mountain Estates Cluster subdivision and are familiar with the poor soils issue and how it relates specifically to this site. But basically, staff's takeaway was that, you know, the issue of poor soils should not necessarily be cause to deny the application, considering all other cluster standards are met. And in the case of the Mountain Estates cluster subdivision, it had been found that the existence existence of poor soils was not, you know, reason enough on its own to to deny the application. So with that, staff recommends that this application be approved subject to conditions of approval identified in the staff report, which is in the record as exhibit 62 and 64. And that concludes my presentation. >> So one one quick question. I have I think it's for. Mr. What about this farm plan? I don't think I've run across a farm plan before. Is that is that in your wheelhouse? Mr. What? >> That's actually for the cluster standards. There are some exhibits in there where he was. We were going back and forth on that farm plan, and it because it it relates to the remainder parcel being completely considered critical areas, the entire remainder parcel. >> I guess I've never seen a farm plan before. And I see this back and forth. And so it's a farm plan at issue here. >> It's not an issue. It's required from the ag cluster standards. Basically. You know, as long as the proposed use of the remainder parcel is made clear, there are original farm plan had, I think, a note that made it a little ambiguous as far as what exactly is it going to be used for? And I believe that was the biologists issue of. As long as it's very clear that this entire remainder parcel is going to be considered critical areas and preserved, okay, then we were okay with it. >> Hopefully it's a non farm plan, correct? >> Yes, yes. >> It turned into all right. >> I saw this kind of like it seemed like you were, you weren't expecting it. And I saw this comments back and forth. So it, it turned out to be a simple a non issue as I had hoped. Okay, let let's let's hear from the applicant. Mr. Sterling it's been it's been since mountain estates since you and I have have seen each other and apparently a lot has happened. So why don't you bring me current. >> For the record, my name is Joel Sterling. My last name spelled STIRLING, unlike my company name, which is STERLING. >> I don't understand why you keep misspelling that company name. >> Yes, yes, we've dealt with that for how many years now? >> And you have a few more years yet to deal with that? >> Yes I do, for the record, my address is 2208 East Evergreen Boulevard. I am a registered engineer licensed in Washington, and I'm also the owner of Sterling Design Incorporated. I represent the owner, Darrell Germain, on the property. This project has been in the works since really 2026. So we're going on ten years. Your comment of holding these projects and having some sort of cottage cottage industry? I don't recommend holding a project ten years. You really you kind of lose the financial edge after, you know, 4 or 5 years. So yeah. >> No wine before its time. >> Yes, yes. >> I'm glad to see these AG ten projects finishing up. And it has been interesting from the legal side how the Mountain Estates project ended up. So I've learned a lot. I will say for the record, I'm not an attorney. I don't interpret legal documents. So I like to propose the question if the examiner is concerned about legal record or legal arguments beyond what was done in mountain estates, because I don't know how much you reviewed the case after it was denied. We certainly. >> Not at all. You know, we we never hear if our if our opinions are ever appealed. >> Okay, okay. >> County prosecutor's office does their thing. And so this was news to me that it had been appealed and overturned. And so I'm glad that the Superior Court final order is in the record. And. I, I mean, I haven't interpreted I haven't really reviewed it. It's pretty short and sweet, reviewed it in detail in the context of the analysis I had in, in Mountain Estates case. So I, I, I can't really say, but, you know, it's very clear what the court said. I guess for you, someone who's planning these things and now living with the mountain Estates decision, how do you interpret the poor soils criteria? Like what do you feel you have to to do in order to meet that criterion in the code that talks about, you know, poor soils? So sub six. >> It's a very challenging issue, mainly because it was not defined. There really was no definition. There is a vague map that you can look on the GIS that shows Clark County, and it basically shows all the areas that they consider suitable for agriculture. But it's not anything that's delineated on the ground. It's just a 300 zero foot or ten zero zero zero foot look down at Clark County, and let's kind of follow contours and and subtract out creek corridors and that sort of thing. So there wasn't a lot of thought put into that map. So it didn't give us on the design side, a whole lot of details to work with. So in mountainous states, I think I had written up, I did research on soils and what it took to grow crops, that type of information. I tried to make an argument that the soils on the Mountain Estates project, while you could farm them, they did require a certain amount of effort and fertilizer. So you could argue that those soils weren't prime soils. They were just soils that worked. My argument, of course, was not not taken into account, because it really came down to more of a legal argument. The concept of maintaining a large remainder parcel and densifying a small area, in my opinion, meets the intent of what the AG ten wanted and the AG 20. I agree farms. In this case, I mean, we you know, there are cows out there, but we also have a lot of critical areas. So this project is a much smaller version of Mountain Estates. >> We had a lot more lots at like 45 lots in Mountain estates. >> Estates was 425 acres. So we had 42 lots. >> Okay. >> Yeah, yeah. >> I guess the thing, as I recall, there was the active farming aspect of it. And was that encumbered with a lot of critical areas? >> Yes. >> Okay. >> Yeah. >> I mean, the whole notion of cluster development makes perfect sense as a great mechanism to conserve land for a variety of purposes for critical area preservation or for farmland preservation. But this standard, if located on agriculturally zoned land, which it is, and to the extent not precluded by other provisions of this subsection, to be limited to lands with poor soils or soils otherwise unsuitable of agriculture. Purpose. So with my sense, based on what the Superior Court Judge said, that poor is a very relative sort of term, unsuitable for agriculture purpose. I mean, the vast majority of the site, 61 acres is going to be preserved and it won't be farmed because it's for the preservation of critical areas. So I don't know what the soils are like. I don't even recall there was much detail in the soils and mountain estates, but it was good enough to farm here. It's hay, which isn't like, you know, that great necessarily. I mean, it's grass is growing and that's all you can say. So it just tells me that this criterion means, you know, don't put the houses on high value farmland. >> Right. >> And then what's left farm it unless you you can't or there's a more compelling reason to preserve it from farming. So it's sort of a do good and avoid evil standard. Which land use is full of. >> Yeah, exactly. They to me, it contradicted itself because, you know, we can't build in the critical areas and wetlands, you could argue our poor soils. So we're not if if we have to put our houses in the wetland, well, we can't do that because it specifically has a code reference saying we can't. >> You can't. And there's a bad that's a contrary to public policy. >> Yes, exactly. >> Okay. I guess there's not much more I need to know. I've got the the Superior Court opinion and it says what it says. It may not have a whole lot of a lot of analysis to it. I think I can it tells me how to interpret this six criterion. And, you know, I read the staff report here and staff says, well, you can't you can't deny this project because of the sixth criterion. You can't certainly not in this context, not in given the facts of this case, the reason for the preservation of the vast majority of the site as non buildable. So that. >> Yeah, and I. >> I would argue that, you know, there, there may be a situation where that would be significantly different than the Mountain Estates project, where you would have some, you could say, well, it's not really the same thing. So this decision may not apply, but this project Arundell, which just as a side note, I, I should have, I should have called this out sooner. It's Arundale, not Arden. Dale Arundale is a castle in Disney. And so. >> The owner's. >> Daughter picked the name. I. You know what I, I, I thought it was just email spelling errors. I didn't realize it was going to come out in the staff report that way. So you don't have to change it. But you know, if. >> It's well, what. >> Should it be? Tell me again. >> Arundell. RARENELLE. Somehow the n in the e got swapped. I think it was on an email trail, so. >> And this. >> Is or isn't the Disney castle? >> It's the Disney castle. Yes, that's the idea. >> Okay. >> The owner's daughter named it. So if you look on my plan, it's it's correct. >> It's correct. >> I like that name a lot better than 174th Street Subdivision or 39th Street subdivision. I mean, that's so lame. So you can tell your you can tell your client and his daughter that I like this name. It's it's it's got something going for it. >> Yeah. And people will know that in their future homes, they're coming, coming home to their castles. >> There you go. >> So anyway, what I was going to say on a serious note, though, if you would like more legal interpretation, I did start talk with Mr. Morasch. I had some email correspondence with him. I had not really anticipated that this would be an issue just because I thought, okay, we've got precedents. They're the same project, but Miss Bateman sent me the email I think this morning that, hey, this might come up. And I was thinking, oh, shoot, I didn't really prepare anything or have Mr. Morasch available. >> No, that's that's okay. You might. We have to leave the record open for a week anyway. Can you maybe get his brief to the Superior Court and submit that? >> Okay. Yes, I can do that. Yeah. Yeah. >> Okay. I think anything else, like how's the staff report findings conditions. >> Yes. Actually, I, I only have a couple things here and, and I, I wouldn't have caught them just because they, other than the testimony on the earlier cases. And that is dealing, if you look on page 22 of the staff report. And. 23 it talks about the on site sewage system prior to final construction approval, and I want to make sure that the finding and the conditions are saying construction, physical approval, not construction plan approval, because like Mr. Taylor had testified earlier, we don't want to take away the water source, the well and the septic before the construction plans are approved. People are going to live there until the project is actually built. So. If you want to look at. So that's on page 22 finding two. >> And is it is. >> It okay the way it's worded? You just want to clarify or. >> I, I just want to say prior to it, it should just be final or construction acceptance would be okay rather than construction approval. >> Okay. Acceptance. >> Yeah. And then similarly on finding four on page 23. Same thing. It says a copy of the decommissioning well log must be submitted to the health department prior to final construction approval. I think it would clarify it to say acceptance. And if you go to the corresponding conditions. So condition A2 on page 25. This is under the prior prior to construction, a final construction plan shall be submitted and in condition A2, A and B. I would say condition A should say prior to final construction approval, a water plan shall be approved. I don't think we need the. The wells to be abandoned prior to construction plan approval. >> So leave the approval there. But a water plan. >> Yeah, I, I don't even know if A2 is needed because if you look on the the conditions on page 29. D4 subsections G, H and e, f, g, h o it looks like it's supposed to be I. So we have a copy of the decommissioning. Well log must be submitted to the public health. So that's prior to final plat and then location of the decommissioned well must be on the final plat. So it's covered in the staff report. I just think it does not need to be in condition A2. >> Okay. Miss Bateman, you want to weigh in on that. Does this make sense to you? >> Yeah it does. So I entered the public health review evaluation letter pretty much verbatim into the staff report. So there is a a part in their letter where they say prior to final construction plan approval, I believe I meant to word it the same way they did, but I will double check the the letter from Public Health and make sure that I'm wording it the way they are. But to change anything from their letter, they would need to be okay with the change to their verbiage. So unless. Go ahead. >> I think you're correct. I think their letter says prior to final construction approval, but I think what they intend is the actual on site work. It's not prior to final construction plan approval. And the problem with conditions being in the A section is that is at the beginning of the A section, it says prior to construction, a final construction plan shall be submitted. Consistent with the following. And then it's listed as condition A2. >> Right. Because the A conditions are final construction. Plan. >> Construction plan. Yeah. We have to address those prior to our plans being signed off. >> Okay. Yeah I will look at it. Definitely. >> And so. >> Would you be shooting for an A two A prior to final construction acceptance. The. The OSS must be properly abandoned. >> If you just put acceptance that that should clarify it enough. Yes. >> Okay. Okay. Okay. I'd be. >> Think about that. Let me know during this one week open record period. >> Same with B. Subsection B has construction approval. If you did both of those approvals and just put acceptance, I believe that that clarifies it for everybody. So the discussion on the record now as well. >> Where was the other B? You said it's a a two a and. >> A two. B. >> They both have the word approval which should be acceptance. Okay. >> Yep. And other than that, I had a couple phone calls from the public asking about the project and I was able to discuss it with them. I don't see anything in the exhibit list of any outside interest, so I have nothing else unless you have questions for me. >> No I don't, I think you've got them covered. Okay. Thank you. So let's just verify. Is anyone, anyone online who wants to testify in any capacity on this proposal? Raise your hand. Anyone? Richard. >> Looks like we don't have very many people left. No. Okay, okay. >> We're whittling down. >> Okay, so let's leave the record open for one week for Mr. Sterling to submit Morasch his brief to the Superior Court. If you can get a hold of that, get it in. And, Marion, if you could just verify or, you know, are you okay with those changes to the findings and the conditions, construction acceptance. To clarify, it's not at the plan review period. Okay. >> Yes. >> Okay. With that, we would leave the record open on this item until today is September 10th. We'll leave it open till September 17th. And for anybody out there in in Zoom land to submit any relevant comment on any subject, although the issues that I just mentioned, I'm expecting and no one else has weighed in so far. So that should close it on the 17th. If some, like bombshell shows up in the record that you need to rebut Mr. Sterling, can you let staff know that and we can keep the record open an additional week for you to do rebuttal. Okay. >> Yeah, obviously, if something comes in that I'm not aware of, I would I would want to have a couple of weeks at least to evaluate it and see what it is. But yeah, at this. >> Point, I'll tell you what, let's let's just lock that in right now. So anything from anybody until the 17th of October, of 17th of September. And then you have final rebuttal until the 24th, which you can waive. >> Yes, that sounds good. >> Okay. And I don't know if you were here when I said I'm going out of town, I won't be back till the 5th of October, so I'll need a few extra weeks to get this kicked out when I get back. So I'd be looking at getting it out. I can turn to this right away that first week I get back, but I need probably till sometime the week of the 12th. But I can I can prioritize this one since there aren't a lot of tricky opponent arguments in it. >> Yeah, okay. >> That's acceptable. Not a problem at all. >> Okay. Okay. With that, we will keep the record open for one week for everybody on anything till September 17th. And then final rebuttal until the 24th, which can be waived. And with that, I'll conclude this item with that open record schedule. >> Thank you, thank. >> You, thank you. >> Thank you. >> That takes us to the last item, Pleasant Wood North Subdivision pl D2026-21. >> Perfect. Thank you, Mr. Examiner. >> Hello. >> Alrighty. Hopefully you can see my screen. >> Yes. >> Okay. Great. >> Good evening, Mr. Examiner. And to everyone who's still attending tonight's hearing for the record, my name is Wendy Baird and I'm a land use planner for Clark County. See? The final application before us this evening is a preliminary land use approval for a type three subdivision to divide 3.40 acres into 2829 lots to construct single family detached homes. The site is located in the Roeun 7.5 zoning District, and the proposals utilize in the compact lot development and narrow lot development standards. The project is located at 5319 northeast 1/29 circle, Vancouver, Washington. The applicant is Joel Hollingsworth with Bridger Homes, and the contact is Scott Taylor with SGA engineering. As I said earlier, I'm the review planner for this proposal with. Alistair Dawson is the review engineer. Craig Cottle is the concurrence engineer, and Jason Noble is the fire marshal review staff member. With me tonight is Alistair Dawson and Craig Cottle. Tonight, staff will provide an overview and summary of the proposal. Identify any major outstanding issues or concerns and make our recommendation to the hearings examiner. Here is a view of the applicant's preliminary plan. Exhibit 43. Here's a vicinity map of the site. The general location of the subject property identified by with the black dot. The site is located on the south side of north east 29th Street, south of 55th Avenue and east of 50th Avenue. The existing access to the site is from northeast 1/29 circle. The zoning map provides a closer look at the parcelization of the abutting lot. The site is highlighted in red. The subject parcel is surrounded by R 17.5 single family residential zoning. The zoning map provides a closer look at the parcelization of the abutting lots. The site is highlighted. Excuse me, I forgot to go down one slide. This slide provides an aerial view of the subject property. The lot is outlined in red. The parcel contains an existing single family residence and several existing outbuildings. A stand of fir trees are located on the east end of the site. Landscaping and a few additional trees are located on the western portion of the site. The existing lot is a legal lot of record and is known as lot three within a recorded short plat. Recorded in 1992. For the applicant's plan, the existing residence and outbuildings will be removed. With this development proposal. The abutting parcel contains single family residential homes. The preliminary plan provides a proposed lot layout that includes lot dimensions and lot sizes. All lots meet the required applicable approval criteria. The minimum. This is just a blown up. Screenshot of the proposed plan. The minimum average lot size for single family detached dwelling units located in the R 175 zone. Utilizing the compact lot development and narrow lot standards require an average minimum lot size of 3250ft². The smallest lot is 3150ft², and the largest is a little over 4500ft², with an average lot size of 3618ft². The site is located within the Vancouver Vancouver Urban Growth Area. The project. The proposed project will create a total of 29 new residential lots for detached single family residential dwellings. The current access to the site is proposed to be removed. The applicant's proposal contains one access located on the east end of the site, adjacent to the proposed lot one, and the second access is proposed on the west end of the site, located adjacent to proposed lot 16. The applicant's site plan shows a required street trees, nine guest parking spaces, which is shown in the. Kind of hard to see on the plan, but they're up in in this area here and then three there. It also shows driveway access and other applicable standards. At this time, staff will show you photographs that we took of the site. This photograph is taken from the East access on 1/29 circle. I am located at the adjacent property to the west of the proposed development. The site contained a locked gate as well as about a six foot fence, so some of the photographs are. They're definitely limited on the photographs for this particular proposal. This photograph provides a view of the posted sign located at the intersection of northeast 29th Street and Northeast 55th Avenue. The photograph shows the approximate east entrance to the proposed development. This view is taken near the east entrance. Looking along northeast 1/29 Street includes the approximate location of proposed lot one along the existing fence line. This photo. I'm staying at the northeast corner of the development site and at the corner of proposed lot one. I'm looking west along the northeast 1/29 Street. This photo provides an interior view of the of a portion of the existing site. And. The last photograph this evening provides a view looking east from the west property line. In the background you can see the existing single family residence barn and driveway. The proposed stormwater track is located at the northwest section of the site. The photograph also provides you a view of the Western access and proposed lot 16. Since the issuance of the staff report, which is exhibit 48, no new exhibits have been submitted into the record. The exhibit list is up to date. The hearing examiner and applicant have been provided with the exhibit list and exhibits. Public comments were provided and written in within the staff report. Some of the public comments discussed traffic safety concerns, speed mitigation, adequate on site parking density, lot size, wildlife and preserving environmentally sensitive areas. Next, I will review the timelines and staff recommendation to the hearing examiner. The application for Pleasant Woods North subdivision was received February 12th and determined fully complete. March 23rd, 2026. Notice of hearing was mailed to the applicant. Pleasant Highland Neighborhood Association and property owners within 500ft of the site. April 2nd. A revised notice of hearing was mailed. April 22nd, 2026. May 21st exhibit 31. A notice of hearing cancellation was mailed. A revised notice of hearing was mailed August 26th, which is exhibit 47. The applicant posted the required sign May 9th with an updated hearing date posted for on August 12th. Staff recommendation to the hearing examiner was issued August 26th, 2026 and is listed as exhibit number 49 on the exhibit list. Staff recommendation to the Hearing examiner for this application is an approval with conditions. Thank you for your time this evening. This does conclude the county's presentation for this proposal. Staff will remain available for any questions. >> Okay. Thank you. So this was Sepa exempt, right? >> Yes. >> Because it's under the 30 lot threshold. Yeah. >> And no road modifications. >> I don't think. >> That's correct. There were not. >> Okay. >> Oh I'm sorry, Mr. Chairman. I thought that was a statement. >> Oh it was sort of a statement begging for information I guess. Okay. I think that's I think I've got the picture of it for right now. Okay. I think I've got it pretty well. Mr. Dawson, any engineering issues that I should be that you bring to my attention on this one? >> Not for me. >> Okay. >> And there's the comments were on the adequacy of 29th, 129th Street. I guess that's more of a concurrency issue. So is Mr. Caudle there is this this isn't the this does not present the same issues as we're in Hartwood North. Is that right? >> That's correct. There were no volume capacity issues for this development. The only potential issue was similar to the first agenda item tonight, which is the intersection of northeast 72nd Avenue and Northeast 139th Street, which has a level of service E in the eastbound and westbound approach. But for county code 435020G1C, this Unsignalized intersection was not meeting the two criteria for requiring mitigation at that intersection. >> Okay, okay, good. Thank you. I think I'm ready to hear from the applicant on this one now. >> All right. Good evening, Mr. Examiner. Scott Taylor SGA engineering representing the applicant. I appreciate staff's time to go over this project and all their efforts. I think everything's been pretty well covered so far. As far as the overview and discussions. And it's another project we worked really hard on with staff and went through some different iterations to get to this point and, you know, have no road modifications and no variances. A 29 lot development as shown on the screen. And so providing opportunity for future cross circulation to the south. And 1/29 Street, you know, we would finish building that street out to be full width with improvements on the south side traffic study, you know, did not have any offsite mitigation requirements. And I think everything else is in pretty good order. As far as the preliminary findings and conditions. I do have a couple little minor items so we can go through those on the staff report. Sure. So on page 12 under finding six landscaping, there is the third paragraph is item E and talks about landscapes, training standards for parking areas. The paragraph below that the sentence, the applicant's final site plan and landscape plan shall provide a five foot wide strip landscape to at least L2 standard. This finding is not applicable as it states you know two paragraphs above. No landscape buffer is required between the proposed development and the abutting properties. You know, this project, similar to the first item tonight, does not have off street parking areas. So there's no additional screening that's needed for like headlights. So all parking is on street. And so this sentence, the applicant's final site plan landscape plan shall provide a five foot wide strip that could be omitted. It's not applicable to this project. >> Okay. >> That'd be our request. And then there's a couple conditions that are also tied to that. So I'll touch on those. >> Okay. What are those? >> Oh, it just says there that conditions a one E and one E, you know, are a associated with that finding. And that's not applicable. Next item on page 17 under finding seven stormwater proposal. So in the second paragraph of finding seven the last sentence it talks about 2.8 years of new hard surfaces. And that had been revised with some of these. The work we did with the layout 2.56 acres. And so that's a minor difference. And that will also be. Noted in the final. >> So it should be 2.56. Just wanted to. >> Correct Nia was letting me know. >> Okay. >> All right. So into the conditions on page 27, condition A 1EI feel a one e could be stricken. It is. It is not applicable for screening parking lot areas. >> Okay. >> And I have some other notes with our team, but I think everything else is in order. May have one last item here. I think we answered our own questions with that one. So I think that is all my comments on the findings and staff report. And again, just want to thank staff for all their work on this. One last item I did notice is they left off the S on the title of the project. So Pleasant Woods North was our intended name for the project. Not pleasant. Would. Oh. I didn't notice that till later on too, so. >> Let me see. Let me just check D1E yeah. >> And I didn't flag that one. Sorry but it's associated. >> Okay. >> Yeah. D1E seems doesn't specify the buffer landscaping. It just says submit a landscape plan that meets the requirements. >> Okay, that should be fine. >> Okay. >> Okay. >> That's it. Yep. >> And available for any other questions. And like before, you know, we're acceptable to the one week open record for everyone and then one week rebuttal opportunity. >> Okay. >> Very good. Thank you. >> Thank you. >> Okay. Now we'll go to public testimony. Anyone in favor or with neutral testimony or questions out there, raise your hand. Anyone out there, Richard? >> None. >> Okay. Anyone opposed? Wish to testify on this? Raise your hand. Anyone? >> None. >> Okay. We have a number of written comments in the record in opposition. So quite a few issues have been raised. But the applicant submitted has responded to, I think those that were in the record. Exhibit. Applicant's response. It's in the staff report. At least there's a response to the opponent. Comments. Okay, Okay. That takes us back to rebuttal, Mr. Taylor. Anything else you want to add before we conclude? >> No, I believe everything was covered with all this evening. Thank you. Okay. >> Anything from staff before we go to the open records schedule? >> Just for the record, it's Wendy Baird, land use planner, and I do not have any additional information. >> Okay, let's talk open record. It's not clear that anything in particular needs to come in. So the record will remain open for one week. That would take it to September 17th for anyone to submit any relevant comment of any sort. B into staff's hands by 5 p.m. on Thursday, September 17th. And then the applicant has one additional week for final rebuttal that would take it to the 24th, but that can be waived if nothing in of note comes in. So that makes sense to you, Mr. Taylor? >> Yes, sir. >> Okay. Okay. With that, I will. Also, Mr. Taylor, I mentioned I'm going to be out of town until the 5th of October, so that will push my opinion. Hitting the street until probably the week of the 12th of October, if that's okay. >> Understood. Yeah. No problem. >> Okay, I'll get on it as soon as I get back. Okay. With that, I will conclude this item, but keep the record open for one week until September 17th for anybody on any relevant topic. And then the applicant has final rebuttal until September 24th. That can be waived. And that that's how I'll deal with this item. And that concludes it. And it also concludes tonight's hearing. Thank you very much, all of you, for persevering. And we'll find out what happens to all of these in October. Thank you very much. >> Thanks, everyone. >> Thank you. Good night