>> Okay, examiner. Marshall, we are ready to go. Let me just start the recording, okay? >> Okay. >> Thank you. >> Okay. Thank you. Thank you, Miss Bowen. Good evening. My name is Stephanie Marshall. I am the City of Vancouver Hearing Examiner. Today is Thursday, November or. Excuse me? Tuesday, November 17th, 2026. It is 6:01 p.m. There are two items on the Hearing examiner schedule for this evening, and I'm going to go through some introductory remarks and explain the processes. And the first item on the agenda this evening will be the Harmony terrace Subdivision application. And that is file number PRJ-164354 and LUP dash 86150. I'm going to be making a similar opening statement when we begin the second item on the agenda. So if you're here for the second item, please just bear with us. I'm not sure how long this first item will take, so I appreciate everyone participating this evening. This is a quasi judicial hearing on a land use application. Quasi judicial means that I, as the hearing examiner, will be a. Judging the application and I will be judging the application based on the evidence that's been submitted, the testimony that will be provided tonight, any additional evidence that is submitted this evening and the standards, the criteria against which I'll be judging the application, those are set forth in the staff report. And if anyone believes that additional criteria are required to be met, please bring that to my attention. During your presentation this evening. Excuse me. All testimony will be given under oath, and I will swear in every person before testifying. So please allow me to do that. Please state your name and spell your last name. You may provide a mailing address or your or where you reside or work relative to the location of the proposal. All evidence that you wish me to rely on must be submitted, either currently in the record through testimony this evening, or if there's an open record period at the conclusion of the hearing at that time as well, we have a raise it or waive it principle, which means that if you don't bring something to my attention, I cannot consider it in my decision. And then if the matter goes up on further appeal, the the the record will be closed and you will not be able to submit that new information. So please be thorough in your remarks this evening. If you have already submitted a comment, letter or anything into the record, you do not need to read that into the record. I will be reviewing each of the exhibits that are in the record for each of the two applications that will be discussing this evening. I have no interest in the outcome of this application of either application, but I'm. I'm focusing my remarks right now on the Harmony Terrace subdivision application. I've not prejudged the application. While it is true that there are other subdivision applications that have come before me that have been submitted to the city, each subdivision application is unique based on its location, the terrain of the ground surrounding development streets, you name it. So I've not prejudged the application. I will be looking at the evidence anew and reviewing that against the standards as set forth in the staff report. I have no bias either in favor of or against this application at this time. If there is anyone that wishes to judge my excuse me wishes to challenge my ability to hear and decide this application. Please state. So now. Okay. Hearing none. This is how the procedural. The procedure will be this evening. First, I'll hear testimony from the applicant and the applicant's representatives after they conclude their presentation. I will then hear from city staff after city staff has provided an overview of the staff report and any evidence that they wish me to wish to bring my attention to. We will then open it up to public testimony. If you are online and you wish to testify at that time, please use the raise hand button and Miss Boguhn will call on you and we'll ensure that you. You have an opportunity to participate at the conclusion of all public testimony. I will turn it back to the city first for any response to anything that might have come up during public testimony. And then finally, the applicant. The applicant bears the burden of proof for me to approve this application. And so they will have the final word. Are there any questions before we proceed? Okay. Hearing none, I will first turn it to the applicant and I will go ahead. I don't see them up on the screen. There we go. Hello there. Conference room three. Please raise your right hand. Do you swear or affirm? The testimony you give will be the truth, the whole truth, and nothing but the truth? >> I do. >> Thank you. All right. Please state your name, spell your last name and provide us your title. >> Yeah. Dave Weston with A k s engineering. DAVEWESTON. >> Okay, you may proceed. Thank you, Mr. Weston. >> All right. See you. I see you're seeing my screen, but not. There we go. >> Here we are. >> Okay, perfect. Okay. Yes. Address is 9600 northeast 1/26 Avenue, suite 2520, Vancouver, Washington, 98682. I am here representing the applicant tonight and I'm the land use planner for the Harmony terrace subdivision project. Case number PRJ164354, LUP 86150. Okay all right, the site indicated by the arrow is located in the eastern portion of Vancouver City Limits. The site is east of Interstate 205, south of Fourth Plain Boulevard, north of highway 14 and west of northeast 192nd Avenue. Vancouver City boundary is shown in purple on this slide. Kamea city boundaries shown in Green and Clark County's jurisdiction is shown in white. The city limits are approximately one mile to the east, and Clark County's jurisdiction is approximately one mile to the north. Looking a little closer, the site is identified as parcel numbers 176395000 and 176396000. The site is approximately 8.82 gross acres in size. Future northeast 13th Street Extension abuts the site's north boundary and future northeast 1/79 Avenue extension abuts the site's northeast boundary, and northeast 172nd Avenue is approximately 950ft to the west of the site. Northeast 172nd Avenue is classified as an arterial and northeast 13th Street and northeast 179th Avenue are classified as collectors. Now looking at zoning, the site is recently or sorry. The city recently updated their zoning map and land Use and Development code title 20. This slide shows the recently updated zoning with the old zoning and parentheses. On this new zoning map. The site is zoned mixed use. However, the site and surrounding parcels were zoned employment Center mixed use Sek. When the application was submitted. Furthermore, the site, along with the adjacent parcels are vested to the zoning code per a annexation development agreement commonly referred to as a pay to. As mentioned, the site subject to annexation, Development agreement and the original pay was recorded on December 8th, 2006. The original pay allowed the property owner to develop their site with numerous uses that the city in 2024 identified as not being entirely consistent with the city's current goals and priorities. Therefore, in 2025, Vancouver City Council amended the Vancouver Municipal Code 2690 section 30 Urban Employment Center Plan District to add an alternative pay to path to encourage these properties with valid pay days to develop under VMC 2690, rather than their original vested rights in accordance with the NC 2600 9030C4A, the applicant obtained approval of a revised development Agreement in August of 2025. This new pay to vest the project to land Use Control ordinances in effect in August of 2025. However, the pay does not vest building code, stormwater, sewer, water or impact slash review fees. The pay day allows residential development pursuant to the VMC 2690. This application is the first project in what is known as the gray Rock Urban Neighborhood. Overlay Uno for short. The gray Rock Uno will consist of numerous individual projects that will ultimately include an urban neighborhood, mixed use center, and an urban neighborhood residential area, also known as Umra. This application is for the first 4.78 acres or net acres of the gray Rock Unroof. All right, now I'd like to briefly discuss the site surrounding uses. As you can see on this slide, there are several parcels adjacent to the site that are being actively mined and or are in the reclamation process. There are also four residential projects to the north and to the east that have been previously approved and are at various stages of construction. Number one on this slide shows the location of the project. Site number two depicts the BPA right of way to the north, shown as number three is are churches. There are two to the north, across northeast 18th Street and one to church to the southwest along northeast 172nd Avenue. The number four is the single family residential subdivisions that are under construction. The number fives represent the parcels to the south, east and west that are also owned by the applicant. Number six to the East depicts the Harmony Sports Complex, which is owned by Clark County Parks, shown as number seven. Even further to the south is the HB campus and their additional property for future phases. Number eight, which is in the northwest or is northwest of the site across northeast. 172nd is Pacific Community Park. That's another county park. And number nine shows the location of the Harmony Elementary and Middle schools, which are located to the north across 18. This will just be a brief overview of the project. Our application materials supply all the additional information that I believe is needed for the review of this project. Site is once again approximately 8.8 gross acres in size and has a net area of approximately 4.7 acres. The site's net acreage requires a minimum density of 87 units, and there is no maximum density in this project. The proposed project includes 117 lots for detached single family homes. Meeting the codes density requirement. The project is planned to be constructed in up to two phases, and timing will be dependent on market demand. The applicant will be extending northeast 13th Street and Northeast 179th Avenue along the site frontages as part of a standalone public improvement project, which is currently under review. This subdivision includes construction of three public streets and two public alleys, as well as all the necessary utilities to serve the development. In addition, there's 212 foot wide pedestrian paths that are planned within the project to provide access through the development to northeast 13th Street and the roundabout. The proposed lots are designed to accommodate townhome widths of 14 foot, 18 foot and 20 foot. All lots are served by Aouli, so there's ample on street parking opportunities along the public street frontages. Additionally, off street parking areas are planned in a couple of the tracks in this project, which are accessed from an alley. One of the benefits of being in a reclaimed mine is that there are no critical areas on site, and to finish this off, I guess all applicable traffic parked in school impact fees will be paid during the applicable building permit process. This slide shows the existing proposed and future circulation system for this area. The site is identified once again with the yellow arrow. The red lines represent the existing arterials in the area, including northeast 172nd to the west, northeast 18th Street to the north and northeast. 192nd Avenue to the east. The solid yellow lines represent existing collectors with multimodal trails or collectors that are going to be constructed under that standalone construction permit, including northeast 187th Avenue, northeast 1/79 Avenue and then northeast 13th Street. The yellow lines represent collectors with multimodal trails that will be constructed in the future, as the surrounding parcels continue to develop out. The green stars represent intersections that have existing signals. The scion star represents the intersection of northeast 18th Street and Northeast 179th Avenue, where a signal will be installed. With the second phase of this project, the purple line represents northeast 16th Street, which is neighborhood circulator that is currently under construction, and the pink lines represent the proposed neighborhood circulators that are planned within the project boundaries. This project boundaries the dotted blue line along the north that's in the BPA right of way represents the future County regional trail that is shown on the Clark County Trails map and the solid blue lines that are near the yellow arrow there represent the projects planned pedestrian paths that will connect northeast 13th Street and Northeast 79th Avenue to this neighborhood and future development to the south. All of the existing, proposed and future arterials and collectors shown here follow the city's arterial street system and classification map. And I guess just to point out the multimodal trails that are along the collector streets are all 11ft wide to accommodate both bicycles and pedestrians. In conclusion, the applicable subdivision criteria are met and the applicant supports staff's recommended conditions of approval with a couple minor amendments that staff, I believe, is going to present shortly and submit a memo into the record. We're extremely excited about this project, and we'd like to thank staff for all the time and effort that they put into their thorough review, and the project engineer applicant myself are all here to answer any questions. And thank you very much for your time. >> Thank you, Mr. Weston. Yes, and I did note that there were additional documents submitted into the record today. I won't ask you questions about them. As you mentioned, staff will be presenting that when I when I call on them next, as I listen to staff's presentation and if any members of the public testify, if I have additional questions at the end, I will circle back to those before we close the public hearing. So thank you. >> Thank you. >> All right. Okay. Next, Mr. Corbyn. Hello. Let me swear you in real quick. Do you swear or affirm the testimony you give will be the truth, the whole truth, and nothing but the truth. >> I do. >> Okay. Thank you. You may proceed. And if you could, just for the record, introduce yourself and how you're associated. Are you the reviewing planner, etc. Thanks. >> Yes I will. Yeah. Thank you for your time. My name is Christian Corbin, a senior planner for the City of Vancouver. Last name is Corbin, so it's CORB as in boy, I n. And this is the Harmony terrace subdivision. I am the planner that was assigned to this and one of the reviewers. And for the record, it's PRJ16434354 slash LUP 86150. Just a real quick project overview. As the applicant mentioned, the project is for 117 single family attached units, and it's subject to the gray Rock Urban Neighborhood Overlay Uno for short, and it's was proceeded under the alternative pre Annexation Development agreement, which we'll use Pata for short. Staff followed the notice of application and public comment requirements. The notice of application and for public hearing went out on September 2nd. And then the environmental review. The Sepa final determination of non significance was issued on October 12th, 2026. During the comment period, no comments were received from the public and then during the appeal period for the final determination of non significance, no appeals were filed. Just real briefly on the background and process the. As applicant mentioned, the pad was originally recorded on December 8th, 2006. In 2025, VMC section 2.690 was amended to establish the alternative Pada. On August 4th, 2025, City Council approved the revised D A for this property. That approval made this project eligible for the alternative pad of process and since it has a subdivision with the application, a type three hearing is required, which is why we're here this evening. And just kind of a little bit more detail into the alternative procedure. In summary, it does not require master plan approval and it modifies the development standards as identified in VMC 20.690 .040 through 20.690070. This is a summary of the approval criteria such as uses, development standards, density. After review, staff found that the proposal meets this criteria as conditioned. And as the applicant mentioned, there was a request for amendment to the staff report. The applicant met with staff and staff and requested changes to the report. More specifically, section 11.70 transportation Concurrency and Condition of Approval. Number 25 Plat note public utility easement staff submitted a supplemental memo in support of these changes. The request is to amend section 11.70 transportation concurrency in its entirety with exhibit one. That was with the memo that was submitted, and then the revised condition of approval 25 with the updated language for the Pou E as written in the memo, staff is requesting that these changes be submitted to the record and approved with the application. That's pretty much it for staff. After review, the proposal meets all applicable city codes as conditioned. It complies with the 2022 Housing Code. Updates and goals for the city staff recommends preliminary approval with the revised concurrency section and conditions listed in the November 3rd, 2026 staff report, along with the revised language and the p e for the plat note condition number 25. And that concludes staff's presentation. We are available for any questions you may have. >> Okay. Thank you very much, Mr. Corbyn. I do not have any questions at this time. I will hear from any member of the public that wishes to provide testimony regarding this application. And if you are online and would like to provide testimony, please use the raise hand button towards the top of your screen. And miss Boguhn, I will just wait a moment to see if anyone has raised their hand. >> And for the record, I did not receive any pre-registration requests to provide public testimony for this project as well. >> Okay. >> Well, seeing no raised hands and also given that no one pre-registered to provide testimony this evening, I will go ahead and turn it back to the applicant to see if they have any concluding remarks or additional comments they would like to make before I close the public hearing. Anything from you? Yes. >> Alright. We we don't have any additional information to submit. We truly appreciate you reviewing the case. Thank you. >> Thank you very much. All right. Well, at this time then I will close the public hearing and I will close the written record. Everything that's been submitted will be reviewed, and I will address those in my findings and conclusions. In a written decision. A decision will be issued within ten business days. So we do have the Thanksgiving holiday. And I didn't even look at my calendar to to find out exactly when, what date that decision is due. Go ahead, Miss Boguhn. >> Examiner Marchel. The city is closed next Thursday and Friday for the holiday, so that will bump your decision to additional days. So instead of it being due December 1st, it will be due the 4th of December. >> Great. Yes, that was that was my calculation as well. So please look for a written decision from me on this application on or before December 4th, 2026. Thank you. And I will now turn to the second item on the agenda this evening. Okay. The second item on the agenda is the Heights District application. This is PRJ-1696281 and LUP 86091. I will go ahead and make my similar opening statements. As I stated earlier, this hearing is a quasi judicial hearing in which I am. I, as the hearing examiner, will be deciding the application based on the evidence in the record and based on the standards set forth in the staff report. If you believe additional standards are applicable to this application, please raise those to me in your presentation this evening so that I can consider them and address them in my decision. I will be reviewing all of the exhibits that are in the record. Any additional exhibits that are presented during the open record period, whether that be only this evening or if the open record period is extended beyond the hearing this evening. And my decision will address all the evidence and whether the applicant has met their burden of proving consistency with the with each criterion in the code. All right. Sorry. Bear with me here for a moment, okay. All testimony will be given under oath, and I will swear you in before you begin your testimony. So please do not begin speaking immediately. Let me swear you in. Please state your name and spell your last name and provide some information as to how you were associated with the proposal or how you. Whether you live or work in the area nearby. The proposal. Of course, anyone that is a member of the public is welcome to testify, and we hope that you do so. I have not prejudged this application, and I do not have an interest in the outcome of the application. While there are other land use applications that come before me as the hearing examiner for the City of Vancouver that might have similar components, each application stands on its own merits and is a judged based on the. The actual circumstances of the site and the surrounding neighborhoods and the street system, etc. if there are critical areas that would be addressed as well in a decision, I have no interest in the outcome as I believe I've already said, and I have no bias in favor or against the application at this time. If anyone wishes to challenge my ability to serve as the hearing examiner for this application, please state. So now. Okay. Hearing none. The hearing this evening will proceed as follows. First, I will hear testimony from the applicant or the applicant's representatives. Then I will turn it over to city staff who will present the staff report after the conclusion of the applicant and the city's presentation. I will then call on members of the public. If you are online and you wish to provide testimony, please use the raise hand button that's near the top of your screen. Miss Boguhn will call on you and allow you to be elevated so that you may present testimony and there will be a timer as well. I forgot to mention this. For the first application, we request that you limit your remarks to approximately three minutes, and a timer will be shown at the top of the screen. At the conclusion of all public testimony, I will turn it back to the city to have any responses or rebuttal to any testimony that was presented by members of the public, and then the applicant will have the last opportunity to provide any closing statements or rebuttal. The applicant, again, does have the burden of proving consistency with all applicable criteria. Any questions before we begin? Okay. Hearing none, I will turn it over to you. I don't know if I can say your name correctly. So Sasha, please raise your right hand. Do you swear or affirm the testimony you give will be the truth, the whole truth, and nothing but the truth. >> I do. >> Okay. And you're with the city, so I, I, I just skipped a step. I meant to call on the applicant. So hold on there for a moment. And we do it differently in other jurisdictions. So let's call on the applicant to begin. Would that be Mr. Tortorici. >> With Sasha is essentially representing as the applicant. The city owns the property. So yeah. So so apologies for the confusion. Sasha will be going first and and I'll follow up. >> Okay. Well, then we were we had we were on the right track. Okay. Sasha, please introduce yourself and spell your last name for the record. >> I'm Sasha Vlasov, last name, VASSEV. >> Hey. Thank you. You may proceed. >> Okay. All right, so I am presenting the Heights District subdivision, and we wanted to use this opportunity just to give you a bit of background and context on this project, since our application for the plat is a bit different from the typical process. So going into this map, this is a sort of larger context of the Heights district, which is bordered by East Mill Plain on the north, MacArthur Boulevard to the west and south, and Anderson Road to the east. And the proposed plat is for the redevelopment project area, which is colored in yellow to the western edge of the map. It's a city led redevelopment of the former Tower Mall property in Central Vancouver that will be transformed into a new mixed use, mixed income neighborhood. And similar to the waterfront development, the city is investing in the infrastructure here to support and catalyze private development. So the city owns about 60% of the land in the Tower Mall area and is leveraging the land for community benefits, with the core objective of the Heights development being to create a new inclusive neighborhood that will include affordable housing and amenities and services within walking distance or accessible by transit. And this is a long term development plan that will be that will be developed over the next 15 to 20 years and is a priority project for the city. So this is an overview of the development that that redevelopment, that yellow colored portion of the previous map. So our plat proposal subdivides the city owned property in the Heights district into sites for development and outlines the rights of way, per the Heights District plan that was adopted by City Council in August 2020, and the Heights District Roadway Plan that was adopted by City Council in May 2023, and subsequent city decisions that have directed implementation of the district, infrastructure and disposition of these development sites. The new right of way that is mapped in the plat that is looping around that former Tower Mall property has fully been designed following extensive city review and will start construction next year. The city is only planning city owned property to prepare the land for development. There are parts of the Heights District that are kind of beyond this red dashed boundary that are still privately owned, and they are not part of this plat application. Since the master plan as designed has different partial configurations that would impact existing commercial buildings on the privately owned land. And these development sites will bring several mixed use projects, including 1800 residential units, half of which will be rent restricted for 30 to 120%. Annual median income. And the city is constructing amenities, including a civic plaza in the center of the kind of plat area, a neighborhood park and a linear park, and an accessible multimodal street network, including upgrades to existing streets for enhanced pedestrian and bicycle connectivity. So this is a snapshot of the development pipeline. There are several projects in the pipeline for the next four years. The areas marked in purple are city projects, which include infrastructure and parks projects. So in that northwestern corner, you have the Mill Plain and MacArthur Boulevard intersection upgrade, which broke ground in June of this year. And that sort of linear line, the purple lines going cutting throughout the master plan are grand loop roads and a linear park, which will be breaking ground in 2027. And that sort of central polygon shape is the Civic Plaza, which will follow shortly after. The areas marked in teal are private development projects in the pipeline that will bring rental and home ownership units to the area, including 231 affordable rental units and 69 townhomes for affordable home ownership. The two projects to the north bordering Mill Plain Boulevard, will be mixed use developments, bringing commercial spaces and a food market hall that will be occupied by local small business owners. And these teal private developments are currently in development review and the first development intends to break ground at the end of 2027. So approval of this plat application would allow for all of these projects to move forward. And this plat is atypical in the sense that city infrastructure projects are being constructed simultaneously with private developments. So since they're being constructed simultaneously, the plat needs to be recorded to create new legal development parcels prior to the infrastructure completing construction, and with the city constructing the infrastructure, city staff agree that it's not practical for the city to bond and escrow the improvements against itself, like you would typically bond in escrow, these infrastructure improvements. So ultimately, the approval of the plat is necessary to implement the Heights District plan. And the City Council adopted roadway plan, and it would also allow the city to fulfill our obligations per the disposition and development agreements with developers, and allow for the infrastructure and development projects to move forward. Thank you. >> Okay. Thank you very much. Very interesting. All right. So Anthony Tortorici. Mr. Let me swear you in real quick. Do you swear or affirm the testimony you give will be the truth, the whole truth, and nothing but the truth. >> I do. >> Okay. Thank you. You may proceed. >> All right. One moment while I share my screen. Yeah. So good evening, Anthony Tortorici. I'm a planner with the community development Department and case manager on this plat here. And tonight I'll be presenting the Heights District subdivision, complementing that historical and overall context that that Sasha gave to, to focus in on the proposed plat. So the subject property consists of approximately 63 acres within the Heights district at that former Tower Mall site. The property is generally located south of Mill Plain, east of MacArthur and extends east of north to vine at the former Vashenko Golf Range site. At the time of vesting, the site was zoned Heights District, or H, which was established to implement the adopted Heights District Plan and facilitate the redevelopment of the area. A look at the preliminary plat here. The applicant is proposing a 13 lot subdivision which consists of development blocks, lots and tracks, along with associated rights of way and easements. The purpose of the subdivision is to establish the underlying lot and street framework necessary to accommodate future development, consistent with the Height district plan, no buildings or individual site developments are proposed with this application, and future development will be subject to all applicable processes, which includes land use, engineering and building permits. As Sasha mentioned, the city has authorized public improvements to be constructed following final plat approval rather than requiring their completion beforehand, and these improvements will be addressed through separate engineering and public works review processes. We did distribute a Notice of Application and Remote Public hearing on September 2nd, 2026. Public comment period remained open through October 2nd, and no public or agency comments were received during that period. The application is subject to the subdivision requirements of VMC 2320 and is being reviewed through a type three process. Staff evaluated the proposal against the preliminary plat approval criteria as well as technical standards. The criteria address the adequacy of public facilities, streets, utilities, open space, subdivision layout and consistent with all the applicable standards. As detailed in the staff report, staff finds that the proposal meets or can meet as condition the applicable subdivision approval criteria. Again, future development on the lots will be subject to additional review under the applicable standards and based on that, staff recommends that the hearings examiner approve the preliminary subdivision subject to the conditions in the staff report. And that concludes my presentation. Thank you. >> Thank you, thank you, Mr. Tortorici. You're welcome. Okay. Miss Bowen, is there anyone online that wishes to provide testimony? >> I do not see anyone in the roster. And as the previous project, there were no pre registration email sent to me for this project. >> Okay, okay. >> Well then. All right. Well, having no public comment this evening, I will turn it back to the applicant once again. Sasha, if you'd like to make any concluding remarks or if there's anything else that you wish to bring to my attention. >> No. That's all. Just appreciate your review and your time. >> You're welcome. Thank you. All right. Well, at this time, I'll go ahead and close the public hearing and I will close the written record. I will be making my written decision with findings and conclusions, and that will be issued on or before December 4th, 2026. So thank you all for attending this evening. I appreciate your time, and we'll go ahead and end this evening's session. Thank you. >> Thank you