The Port of Vancouver's Board of Commission meeting. Today is Tuesday, November 10th, 2026. I am calling the public meeting to order at 9:30 a.m. There was no executive session held this morning. Please note this meeting is being recorded. My name is Don orange. I am the the Commission President for the Port of Vancouver. Joining me are Commissioner Eric LaBrant and Temple Linse, Commissioner Temple Lynch. We are conducting a hybrid meeting along with our in-person meeting. We are having. We are also set up so those who are not physically capable to provide oral testimony can do so virtually. Please join me in the Pledge of Allegiance. Pledge allegiance to the flag of. >> The United States of America and to the Republic for which it stands. One nation under God, indivisible, with liberty and justice for all. >> Next, the first item is approval of the minutes. Temple. What do you think? >> I reviewed the minutes. Find them to be in order and move approval. >> I'll second. >> The motion. >> All those in favor? >> Aye. >> Passed unanimously. Uhl. Next, we have community fund update. AM I correct? >> That's correct. >> Excellent. >> So I'd like to invite Gigi Harker up. She's our economic development specialist who will introduce community fund recipient. Vancouver Ballet or Gloria. >> Good morning. >> My name is Gigi Harker and I'm the economic development specialist. And I oversee the community fund grant. Today we have one of our recipients. They were awarded $2,500 for their Vancouver Ballet Folklorico nonprofit organization. We have Mariana Cruz and we have Ana Cruz, the founder and president of the organization. Thank you. >> Good morning. Port of Vancouver commissioners and everyone attending this morning's meeting. My name is Ana Cruz. I'm founder and director of Vancouver Ballet Folklorico. We have been established as a group since 2014, so we have been in our community for that long. However, we applied and received our 501 C three nonprofit status in 2022. We are one of the recipients of the Port of Vancouver Community Fund, and these funds were specific to support expenses for our Luminarias. Dia de Muertos 2026 and the event took place at the park. We had a great attendance. The weather was just amazing. City of Vancouver manager was there to read the proclamation and it was just a beautiful. Some of the money we received through the Port of Vancouver was utilized for sound and system. Decorations. Contractor entertainment. Support of coordinating our event. A parent volunteer coordinator, professional makeup artist and so on. Typically, our event spends $18,000 and we do fundraising and we rely also on the City of Vancouver Tax and Lodging grant. And so the City of Vancouver Tax and Lodging grant allow us to have $10,000. We also had a matching grant from for for plan forward. So they matched the 2500 from the Port of Vancouver. So we had $15,000 for our event and then the rest. We covered it through our own funding. Next slide please. >> Hello. Good morning. My name is Mariana Cruz. I am Ana Cruz's oldest daughter. I am a dancer, instructor and social media coordinator for dance Group. Our mission has impacted me and other children of Hispanic descent to preserve and engage with the Mexican culture through dance, music and discipline. And so I've been part of the group since I was seven years old. And so the mission has lived through me, and it has impacted me in a really great way. We definitely work to nurture our Hispanic heritage all around Clark County and beyond, and so we love to share our performances in Vancouver, Portland, even up to Eugene and other places in Oregon. Let's see. Currently, we have 38 dancers, ages 6 to 50. We have eight dance instructors, and our dance practice space is currently held at the Arts Center. Right on Mill Plain. Next slide please. So what? What is Luminarias? Dia de Muertos? Luminarias. Dia de Muertos is a celebration that we put on in Esther Short Park that is free for all. It helps bring Latino families together as well as Clark County and Vancouver all together. And we celebrate this ancestral tradition of day of the dead. And it's supported by community partners such as Port of Vancouver and many other great organizations. And it's also like reliable and funded by grant opportunities, fundraising and volunteer opportunities as well. It brings together a beautiful and meaningful community event, and at the end of it, people are happy, people are united together, and it just shares a unique and engaging gathering. It brings everyone together. No matter if you celebrate day of the dead or not, it also brings us all together to celebrate our departed loved ones. We've all have, you know, shared grief. We've all shared a sense of like losing someone. And so this brings us together as one, as humankind, and we celebrate life and death in a beautiful and positive way. Next slide please. >> Our event also creates economic impact and support for local businesses. Some businesses come from Fort Plain Forward and their initiative. It brings cultural tourism and downtown vitality, especially in October. So our event is basically the last event for the City of Vancouver. We promote cultural preservation, inclusion, belonging, and especially youth leadership. We provide education and support for them. We just, you know, love Esther Short Park. We feel like we are part of Esther Short Park. If you paid attention to our logo at the beginning of the slides, we do have the bell tower as part of our logo. We have a dragonfly that symbolizes like watersheds or transformation. So we really feel embraced by the city of Vancouver and we are happy to call this place home. Next slide please. >> So a little bit more about how our community came together for not only this year's day of the dead, but in other years as well. Our community comes together through free activities such as visiting the ofrenda. As you can see in the picture above, which is an altar where we place pictures of our loved ones and cultural elements. And so people of all kinds can learn about it. We do have a remembrance wall where people can write names of their loved ones, or a little message to someone, kind of just like remembering their like a memory or something. And it's really cool to see at the end when we collect them, how many people have written things and the beautiful things that they've written. We also have like a mock cemetery, just like a fake cemetery where we had our parents place cemetery graves with their loved ones. And it was really cool to go around and see and honor those who have passed on. Let's see. Next slide please. >> So Esther short Park, iconic, beautiful, historical. And these are just a couple of pictures of how we transform the stage with color and activities and performances, live music. And as I mentioned before, like local vendors that have perhaps a first time opportunity to be part of. So it's just creativity and we are very thankful for the support. And if you have any questions, please let us know. Any questions? >> I think there's another slide. There you go. >> Thank you. >> Just a thank you. >> Thank you so very much. It makes me try to forget that it's a rainy day out there. This beautiful trip to the park. You took us through. Thank you. >> Thank you. If you have not attended, we invite you to the event. Next year will be on the third Saturday in October. So please place it in your agenda and we are looking forward to seeing you there. Thank you again, commissioners and everyone here this morning. >> Thank you so much, commissioners. >> Thank you. >> Thank you. >> Thank you. >> Next up is Open Forum. What do you say. >> We didn't have anybody sign up for the virtual open forum. And we don't have anyone present who signed up to speak today. >> Okay. Next is the public hearing for the 2027 final budget, correct? Okay. I've got verbiage. I'm supposed to speak to me specifically. Let me see if I can do this. Right, folks. Next item on the agenda is a public hearing for the public to comment on the proposed 2027 final budget for the Port of Vancouver. Notice of this public hearing was published on October 16th, 2026 and November 6th, 2026 in The Columbian as required by statute. Since action items one and two pertain to the budget, the Commission would like to hear those before we open it up for public comment. Scott Goodrich will present action items one and two after the action action item. Well, that's the next thing I do after you. Excuse me. >> Good morning commissioners. Agenda item E1 is for approval of resolution 3-2026, authorizing an increase in the regular tax levy. Revised Code of Washington. CW84 .55.120 requires the taxing district, other than the state that collects regular tax levies to hold the public hearing on its budget. The hearing must include consideration on its proposed regular tax levy. The port's 2027 budget proposes an increase of the regular tax levy of 1%, including new construction and utilization of previously banked tax levy capacity. The public hearing on the 2027 budget is being held right now. On November 10th, 2026. Agenda item E two Approval of resolution for Dash 2026. Adoption of the 2027 Final budget. The 2027 Port of Vancouver, USA budget supports the port's strategic goal and mission to maximize revenue and create economic benefit to our community. This budget reflects the collaborative efforts of the Port Commission and staff to identify available resources to meet the the port's key initiatives. A preliminary budget administrative work session was held on October 13th, 2026, to review the port's recommended 2027 budget of the Port District. Port of Vancouver. Staff presented the Board of Commissioners with an overview of the proposed Department Budgets, 2027 Capital Program Financing and Tax Levy option to consider. The work session was open to the public. The budget is a plan of financial operation that involves estimating sources and uses of funding for the annual period of January 1st, 2027 through December 31st, 2027. As a management tool, the budget provides a guide to the conduct of operations and a basis for evaluating actual results. Another important function of the budget is to identify and allocate resources for planned capital projects. Additionally, the budget document fulfills a legal requirement for the proposed purpose of levying port District taxes. The port's budget estimates an increase of regular tax levy of 1%, including new construction and utilization of previously banked tax levy capacity. >> Thank you. Are there any comments? Hearing none. Hearing no comments. I declare the public hearing closed. We will now move to the action items. Next up are the action items on the agenda today. Jonathan, it's up to you. >> All right. I will have Scott finalize this action item. So go ahead and read the action item. Excuse me. The for the first action item. Agenda item E one. I'll read the recommendation. The recommendation is that the Port of Vancouver Board of Commissioners approves and executes resolution 3-2026, authorizing an increase in regular tax levy. >> From up here. I have no comments and I'll move that we adopt the recommendation as presented. >> Second. >> All those in favor? >> Aye. >> Aye. Passed unanimously. >> Next agenda item E two. I'll read the recommendation that the Port of Vancouver Board of Commissioners approves and executes resolution 4-2026, adopting the 2027 final budget in the amount of $137,859,617. >> Are there any comments on that one? >> I don't have any questions or comment. Is that I, I think this you know, this is my first budget process with the port. I think this is a strong budget that provides for our amazing staff to continue doing the great work here to invest in, in the port properly so that we can continue to support the economy of the region. So I would move to support and to approve this budget to approve this action item. >> I'll second the motion before we get to the vote. I'd like to comment that the presentation that you and several other people, some of whom were here this morning and some of who was an excellent and informative presentation. Thank you. Everybody's out of words. It's been moved and seconded. No, LaBrant got something to say. I was just I was just thinking back to the the capital projects LaBrant I don't think I was I was just thinking back to I mean, I'll echo the comment, the comments of my two fellow commissioners and add the, the capital projects list for this coming year is extensive. And there's going to be a lot happening this coming year. So thank you for pulling that all together. All those in favor? I, I unanimous thank you. >> Thank you commissioners. >> Thank you Scott. Next up is unfinished business. >> I think we have one more action item. So our our last agenda item today is going to be presented by Angie Han and our real estate specialist. >> Excuse me, I leaped. >> Good morning commissioners. Good morning Jonathan. I'm here to present a agenda item on a lease amendment. For our tenant. For one of our tenants down at terminal one. The subject is to approve Second Amendment to ground lease. An amendment to memorandum of ground lease for Port of Vancouver owner, LLC. This lease supports the support Strategic Plan goal to implement the vision of a destination waterfront at terminal one, as well as the goal to pursue opportunities that use the port's property and investments to create jobs and support the local economy. Effective May 6th, 2021, the port entered into a ground lease with Bos Port of Vancouver Owner LLC. I'll call him boss from here on out for property at the port's terminal one, under which Bos constructed the Zoominfo headquarters building as the info HQ. From now on, the First Amendment to ground lease was entered into effective September 21st, 2021, to allow an extended period of construction staging for the nearby AC Marriott Hotel boss began construction of Zoominfo HQ in 2022 and substantially completed construction, and turned the building over to Zoominfo in November 2024. As one of the conditions of approval, the City of Vancouver required that the port record a boundary line adjustment deed, consolidating terminal one adjusted lots seven, eight and nine into one lot, now known as terminal one combined lot seven. That deed was recorded on June 12th, 2024. The lease amendment and related amended Memorandum of Lease do not change the business terms of the initial lease. Rather, the lease amendment only updates the legal description of the lease premises to reflect a lot. Consolidation into combined lot seven. It also affirms that there was no change to the footprint of the lease premises. As a result of the lot consolidation. The 393,000 square foot Zoominfo HQ supports 500 employees for six office and retail businesses, including Zoominfo, Southland Industries regions, Blue Cross Blue Shield of Oregon, Trend Capital and soon to open Compass Coffee and Luna Nails. The building is 85% occupied, with approximately 53,000ft² of office space and 12,600ft² of retail space currently available for lease. The recommendation is that the Board of Commissioners approve and authorize the CEO to execute the Second Amendment to ground lease. An amendment to Memorandum of Ground lease between the Port of Vancouver and Port of Vancouver owner, LLC for the property located at 330 West Columbia Way. Any questions? Comments? >> Did I hear that? Did I hear that correctly? That Blue Cross Blue Shield of Oregon. >> Has space in the. >> Offices there? Yeah. Awesome. I don't have questions and I'll move that. We adopt the recommendation as presented. >> Second. >> All those in favor? Aye, aye. Unanimously. Thank you. Thank you. Thank you. Now to unfinished business. >> Okay. Commissioners, each month we provide you a copy of the port contract log. This is a list of all the port contracts, all of our public works contracts, as well as our service contracts and the highlighted sections of those contract logs are the most recent activity. These are also posted on the port's website. Do you have any questions on any of these? >> Okay. How about new business? >> There is no new business today. >> Accounts payable. >> Accounts payable. So I would like to introduce Nick McIntyre, our accounting manager, who will present the payables today. >> Thank you Jonathan. Good morning commissioners. Good morning. We did not receive any questions prior to this meeting. So I'll start by reading the recommendation then open the floor for questions. The recommendation is that the Port of Vancouver, USA, Board of Commissioners by motion ratifies and approves the payment of October 2026 vouchers 129920 through 130366 in the amount of $5,465,379.72, including electronic payments generated between October 1st, 2026 and October 31st, 2026, in the amount of $1,259,514.62 in October 2026. Payroll direct deposits 410001 through 410137 and 430001 through 430139, in the amount of $853,276.94. >> What's your pleasure? >> I move to approve as presented. >> I'll second the motion. All those in favor? Aye. Aye. Unanimously. Thank you. >> Thank you. >> Do you have a CEO report? >> I do not I don't have anything to report out on behalf of the CEO today. >> Cool. Sounds like it's commissioner reports somewhere. It's supposed to tell me which one is first. Go for it. >> All right. Can I interrupt? Sorry. I do have something to report out. As Lisa reminded me, we have project updates, and I'd like to introduce Mark Newell, our project delivery manager, who will provide an update on some of the activities going on in Portland. >> Good morning, commissioners. All right. I think it's been maybe a couple months since I've been up here last. So but we're continuing to make great progress. We have a lot of projects going on right now at the port and a lot of projects in design based on next year's budget. And so definitely, definitely lots, lots to report on. So we'll start with trail segment four and five. So contractor has advanced excavation specialists project is again it's connecting the next section of connection and extending the trail. And in this section of trail, as you recall, there's a lot of wall work, a lot of reinforcing reinforced kind of earth elements and some of those pieces happy to report that we're continuing to make good progress. Projects around 63% complete. You can see in this photo we've taken advantage of some of the weather where we can and pave some of those sections. However, the barriers and those elements are still in place just for public safety. And we're still a little ways away from, from being able to, to access that as we have guardrails and other elements, fall protection kind of elements that need to go into place. Benches kind of being installed. You can kind of see some of that flat kind of work around here in this location and their contractors continuing to progress. Next slide kind of shows some column bases that reported the trail plaza. So we've been making some good, good progress at the plaza itself. The next slide here shows a little bit more of that progress. So here you can see some benches being installed. You can see a lot of the concrete kind of curb work and and concrete work going on as well. And of course, you know, a nice excavator bucket standing over the top to let you know we're still under construction. So, so this will be a little bit of a unique, you know, feature down here. It just, it's kind of a nice little plaza area that goes that connects kind of the end of this segment of the trail and, and has some good, good view view areas. There will be some more structure work, vertical structure work that will be going in this place as well. That's that's still in progress. And then final slide here is just kind of showing one of the landscaping elements that that are being installed alongside the trail. So hopefully we'll be able to get those installed here during the fall and they will kind of get going. We'll continue to see progress on this going forward. Next project is one of our paving projects. So the contractor is Western United Civil. Again, each year we we evaluate priority paving locations. And the purpose of that is to to extend the life of those areas, to look at high traffic areas that have wear and work on that. And this portion of the project, the contractor focused on Saint Francis, which is just a little bit east of here. And so the project, the overall project consists of a couple of different locations. But for for this piece, Saint Francis has been the focus and we're around 30% complete with the overall project. So first, first portion was grinding subcontractor kind of getting prepped. So you can kind of see that's kind of where they kind of start, get their machinery and equipment. Next slide. They mill out and grind those elements and then clean that area and prep it for paving. So they're not taking the full section out, but they're grinding it down. And then quickly kind of recover with application of, of paving lifts, which you can see in the next slide. And then ultimately finish with kind of the final top left and, and those elements. Next slide shows that. So we're making making some progress on that. We're able to take advantage of some really solid weather right before what we're experiencing now is kind of jumped in. And we've, we've switched seasons all of a sudden, and we'll be a little bit more to report on that next project is Subarus parking expansion project, which is just down the road here. Contractor is Tapani. And this, this area is, is using a, using an existing site to expand that area for Subaru's operations. And here you can see crews out there doing grading work, getting prepared, prepped for that, trying to make sure that that, that they're again, taking advantage of that, that that weather, getting good compaction in prep for that next slide shows a little bit of the other improvements that are working out there, some utility improvements. This is a fire hydrant being installed and the grading work is kind of in the in the background in that space. And next slide here is just showing kind of paving placements, light poles being installed. So there's always elements on the terminal where we have lighting, of course, and security fencing, installation. And next slide kind of shows a little bit of the striping layouts and those pieces. So we were able to squeeze this project in before kind of weather elements hit this kind of a unique type of pavement. It's a pervious pavement. So it's really helpful with drainage under under the right kind of conditions. And so, so yeah, happy to report that project is complete. Next project is the berth five maintenance project contractors advanced American construction. We have are continuing to make progress on this. This is focused on on the dock itself and has some complexity to it, where the contractor is doing above water and below water work. And because of that below water work, it needed to be performed in in water work windows. And so this is the second in-water work window where work is being addressed here. So right now it's pretty low water contractor does have kind of a barge and access set up here. And they're still working on fiber reinforced polymer jackets. That's the FRP. Next slide shows a little bit more of that. You can see that this berth is is all wood in in its in its nature. So it, it definitely requires some attention. And so the engineering folks have assessed that and, and come up with these solutions. So you can see on that vertical member there that they have to remove remove various bracing pieces, then then install mesh and elements. And then ultimately they will encapsulate those pieces and strengthen those wooden vertical members that are exposed to the conditions. Next slide shows a little bit of kind of that FRP jacket that has been installed and placed in space. And so some of that work is above water and some of that being below water with divers. Next slide. Just a different a little bit different angle there. So they put these jackets around and then they, they, they seal that area off and then they, they place a grout that's highly flowable in that space. And I think that's it for berth five. Moving down to terminal one, the dock replacement project contractor construction continuing to make good progress here. The projects approximately 75% complete. And again, this is this is the dock that supports the future public market and continuing to be a heavy focus on concrete placement. And we're moving kind of forward in that. You can see in this slide here the recessed area. That's the future public market footprint that that will be seeing that they have placed a few interior topping slab pieces into that crawl space. And of course, there's lots of equipment and elements kind of running around on the site. Next slide shows kind of the connection with the Vancouver landing. So this area has been kind of tightened in to the public just and kind of sealed off in the in the temporary condition here for safety reasons. And so, and that's because these crews are working in these locations. You can see the precast panels have been installed on top of of the pile caps and have been welding operations, putting those together. And then there's kind of a gap in that space between. And those areas are where they're installing under dock catwalks before they seal those those spaces up. Crews have been bouncing back and forth between placing concrete on the north and south sides of those end walls and and cycling through. Next slide shows a little bit of a perspective on the future area that will be right in front of the public market. This will continue kind of where the public will walk adjacent to the public market. And you can see these end caps and some of these panels, panel placements yet to come. While a lot of reinforcement tying elements are going on in the foreground. Next slide. Here you can see a little bit of just some topping slabs. Again, this is this is just underneath the crawl space. The final finish grade with the public will walk on will be around the perimeter. And that will that will not be placed until the public market is installed. But we will have a small topping slab that will be placed now while we while we work through the architectural design and the architectural finishes. But eventually in this space, there will be beams supporting from from one side to the other and architectural finish. And this will be the floor of the public market. So good, good, good perspective here looking back. Next slide here we'll jump to building 2001. And so this is the project that is Pacific Tech has been working on for us. We're about 90% complete now. All of the roofing elements on the top have been completed. I was reported last time, and they've been focusing on the lower roofs and kind of tying connections. And they have some additional some minor interior drywall replacement elements that they're still working on. But overall, the project is dried in now, which is very good because we've been seeing a lot of a lot of water. Next slide kind of shows a little bit of, of some of the siding replacement and, and elements to, to tie in the roofing to the siding. And so, so that's kind of why they've exposed some of those. So good progress on, on building 2001 and the interior. Next slide. They completed some of the areas that have had moisture issues and damage, including a lot of the ceiling tile and elements that are in those spaces, and then replacing drywall and paint in some of those areas. And next slide is Canopy Project. We reported this one, the smaller project with some interesting engineering elements, but connecting our two spaces together. So that project is complete with the exception of a little bit of electrical work. And then moving on to building some building repairs elements similar to the paving. We identify buildings that that need maintenance, maintenance aspects of those and painting. So there's a suite of projects and buildings working with our tenants. First Cascade Corporation has been working on, on, on these buildings. And you can see they've been painting those buildings. They have some repair work as well, and they've been able to paint a number of buildings prior to the weather. And they're currently working in progress on, on one of the other ones. So there's a couple more slides here that kind of show, that kind of perimeter painting around. And project is about, I guess maybe 75% complete as a whole. I think one final slide and I think that's it. So appreciate any questions that you have. Appreciate the support on all of these projects, many of them capital from the previous year's capital project budget and carrying over into this year. >> Thank you. >> Thank you Mark. It's for just a comment on the updates and the photos. It's really it's really great to to have these updates and to be able to see the progress. I'm curious how, how you're tracking on accomplishing the goals for this year. Now that we're coming up on the end of the year, just how is it looking for completion. >> Of I think we're we're on target for most of those projects. You know, periodically we have some projects with some challenges that sometimes slide in the schedule. Trail segment four five is an example of that. And, and so and, and so. But for the most part, I think we're, we're, we're pretty, pretty on track with a lot of the projects on delivery. So yeah. Thank you. Weather sometimes can play a role in that as well. In addition to sometimes procurement. So there's a couple projects that we have that are, are shifting a little bit into next year just because of, of some of those procurement lead time items. And, and then obviously some weather related pieces. So yeah. >> I was going to ask about terminal one. Are we, do we have any more in-water work that we're doing during this particular fish window? >> Yes. So we do we do have in the next in the next period of time until the end of January. We do have a Fender system, Fender system to install which of which the in-water work is the the piles. So we have another 50 or so, 55 or so piles to drive there. We also have a debris boom with some additional piles, I think five additional ones there. And so the contractor is kind of waiting for the right time that fits within their schedule, where the concrete crews that are out there are out of the way so that they don't get started and then kind of run into their work while they're waiting and stopping. So we can expect to see some of that pile installation work, probably in December and January. In that time frame. And we won't see impact hammering, we'll we'll see vibratory installation. So it should be, you know, a lot simpler for the noise impacts and things like that. So because these piles are not performing the same as the structural piles that are supporting on the dock. So we don't have to put an impact hammer on them and measure the capacities through that. In the same way, they're more of a lateral support system for future vessels and those types of things. >> I was going to mention, I drove out to Vancouver Lake, I don't know, a few days ago. And. Honestly, without the updates, I would not have any idea what all was happening there because from the road side, there's just not a ton that's visible quite yet. And so I'm appreciative of that. Yeah. So. I think we ran out of words. Thank you very much. >> Thank you commissioners. >> Thank you Mark. >> And that's all I have for updates. Commissioners. >> Thank you. Now let's try the commissioner reports. And I don't remember what direction it's supposed to go. So we'll start with you, Tim. >> All right. Last couple of weeks met with the CEO, had a constituent meeting, also attended the RTC. The Regional Transportation Council meeting for that commission. Council. Like every every agency around here, everybody's in budget. So RTC is working on its budget for next year and its work program and also working on a freight system plan, which is being done with a technical committee that includes folks from here. So it'll be exciting to see that come together and see a freight system plan for the southwest Washington region. Also went to Labor Roundtable, talked to some of our friends in labor, and there was a lot of discussion. It was right after the election, and candidates who were successful and those who weren't were there. And good to see people coming together. And then just a reminder that tomorrow is Veterans Day. So thank you to all of our veterans who are a part of the port community. And also, if you're available tomorrow, it's supposed to stop raining and the veterans parade will be down on the historic site at 11 a.m. >> Would you define freight system, please? >> A a system of freight. >> I didn't ask you to reverse it. What? Give me 25 words. >> That understanding how freight moves in, in, and through our community and how it can move better, the work they're working on. >> All right. Thank you. You're in. I don't I don't have a whole lot to report. I did have an opportunity to meet with our CEO just before, just before she headed out for a trip. And then also had a had an opportunity to meet with some folks from the Pacific Northwest Waterways Association, Inland Ports Navigation Group or Ipng, and got to learn a little bit more about what that group is focused on and what their priorities are. And. And that that's it for me. I had a relatively light period. And as temple spoke to thank you all that participated in, in the election. I think that's what it means to be a democracy. And when we get out and vote, maybe we can keep this democracy going. So. Upcoming events, please, Jonathan. >> Yes. So I do want to note that we have our next commission meeting scheduled for Tuesday, November 24th at 9:30 a.m. However, we anticipate that we'll be canceling that meeting because we don't have any business, but we'll confirm that by the end of the week. I also want to point out we're making a slight change to our commission meeting schedule in December. We're working around the holidays as well as some other conflicts, so we're going a little bit off our regular schedule and anticipate holding one final commission meeting for the year on December 15th. It'll be held in the afternoon at 1 p.m. rather than our normal morning slot. So please pay attention to our website to look at the most current updates on that. So also we have community events. Port, as mentioned, is closed November 11th and observation of Veterans Day. We have the I think it's pronounced low legacy Veterans Day parade. That is tomorrow, Wednesday the 11th, from 11 a.m. to 1 p.m. we have the are Not a Neighborhood Association Association meeting. Thursday, November 12th from 7 p.m. to 8 p.m. It's a hybrid meeting as well. And D.B. Cooper con. November 13th through 15 at the Kiggins Theater. It sounds interesting. So experience presentations, panels, Q&A sessions, and some local food and beverages during that event. Prices vary there. Esther Short Neighborhood Association meeting on Thursday, November 19th from 6 p.m. to 7:30 p.m. Fish Nature Day, Saturday, November 21st from 10 a.m. through 1 p.m. at Columbia Springs. It's an all ages. They're welcome to walk the site and learn about all things fish. This event is free and reindeer magic. Saturday, November 21st from 10 a.m. to 4 p.m. Meet Santa and his reindeer. Bring the whole family to this community. Favorite event for a magical holiday experience. Tickets are $11 and Merry and Bright Ornaments. November 22nd through the 28th at Kiln Folk decorate pre-made clay ornaments just in time for the holidays. Registration and tickets are available online. Last but not least, the ports closed Thursday, November 26th and Friday, November 27th for Thanksgiving. So lots of holiday events happening. >> Does that. Excuse me? My next job is to tell you that there is no workshop. Today. We're going to sign documents. And so basically this ends the public portion of this meeting. We'll adjourn it after we sign documents. Thank you all