All right. We're live. >> Okay. Thank you. Good evening everyone. Let me call to order the November 12th, 2026, hearing of the Clark County Land Use Hearings examiner. My name is Daniel Keirns, and I'll be presiding over tonight's agenda, which consists of two things. The Marcel Marcel subdivision. PLD 2026 dash 103 and Glenwood Landing Subdivision. PLD 2026-39. Let me begin with a brief introduction to me and an explanation of how the process is going to work this evening for both of these land use applications. First of all, I and one other person we serve by appointment from the Board of County counselors to hear and decide development proposals in unincorporated Clark County. I'm not a county employee. I'm not county staff. I'm an independent land use lawyer licensed in the state of Washington. And I have experience in land use matters. My job is to decide these in an impartial way. To do that, I review the record and I consult the code, the applicable code criteria, and then I take public testimony in a hearing such as this, and ultimately is to take all that information and decide whether the application meets or does not meet the applicable approval criteria. Those are the standards that were in the county's development code on the day that each one of these development applications came in, and those criteria are the outer limit of my discretion and my authority in these matters. I can't be more lenient nor more stringent than these criteria allow. I can't take into account other things that aren't encompassed within these criteria. I have to stick strictly with them and decide whether there's sufficient credible evidence in the record to demonstrate that the standards are met, or can be met through conditions of approval and and if the evidence in the record is sufficient, then I'm obligated by state law and the local code to approve these development proposals. As I mentioned, in doing that, I have to be impartial, and I believe that I am. With regard to both both of these items on the agenda tonight, I don't have any personal or business or familial connections with any of the parties at the applicant or the parties who have weighed in on each of these items. What I know about each of these is what I've gleaned from the record. I've had my record for approximately one week now on each of these items, and so I believe that I'm free of any conflicts of interest or biases. And I haven't had any ex parte contacts. If anyone wishes to question me about any of these disclosures, feel free to do so. During the public testimony portion of tonight's hearing. With regard to each of these items, here's the order of events on each of them. We'll begin each of these items in the order on the agenda with a staff report, which is a verbal rendition of the written staff report that was issued prior to tonight's hearing. In that report, staff will go over generally the approval criteria that apply and some of the major issues. But for those who of you who are interested in these items, I recommend you get a hold of the written staff report and it goes through chapter and verse, each one of the approval criteria that apply and control the outcome on each of these development proposals. After the staff report, I'll take the applicant's presentation. Applicant. You can assume I'm generally familiar with the proposal, but there are a couple of things I want to hear from you up front. First of all, what is the current version of the the development plan before me? A lot of times these proposals, they go through several iterations and revisions from between the time of first submitted until they go to hearing. So I need to know which exhibit in the record reflects the current proposal. Second, as I mentioned, staff has issued a written report that recommends findings on each of the approval criteria and conditions of approval that staff's recommendation, and I need to know the applicant's view of those. I need to know any corrections or objections to any of those findings or conditions with specificity, so that I and staff can figure out exactly what you're saying and the problem you have with any of these findings or conditions. And the third thing is, I want the applicant to take notes and keep track of issues that are raised by public testimony. And part of that is the written testimony. Both these applications, the records have multiple public comments in them. But I anticipate public testimony tonight. Applicant keep track of the issues raised in the public testimony and be prepared to respond in your rebuttal period to any of those that are appropriate. And I say that because a lot of times the testimony I get in these hearings is questions from affected neighboring property owners who want to know, what's the impact of this thing? How is the stormwater system going to work? How's the traffic going to affect my neighborhood or particularly bad intersection near me? And what's the layout going to be like? And landscaping and those sorts of things. And the applicant is usually in the best position to respond to those. So take a stab at that during your rebuttal. So after the applicant gives their presentation, I'll take testimony from anyone in favor of the application. After that, I'll take testimony from anyone with neutral testimony or questions. And then finally, I'll take testimony from anyone opposed to the proposal after everyone has had their chance to testify, I turn it back to the applicant for final rebuttal. In all of these cases, the applicant gets the last word, and that's because the applicant has the burden of proof, the burden of proving that they meet all of those approval criteria that I mentioned. So they get their chance to do that. And also after tonight's hearing, the applicant has up to one week after the record closes to everybody else to submit their final rebuttal in writing. So after the applicant's final rebuttal, the verbal rebuttal tonight, I will also turn it back to staff to see if there are any parting comments that staff has. Based on the public testimony that came in tonight. And it's my typical habit, then to close the public record. Once all that all the testimony is done and in. Though since the pandemic, we always leave the record open at least one week following the public hearing so that if anyone has any trouble getting in through this WebEx internet portal, or if they want to respond to something they hear at the hearing, they have one week to submit written comments following the hearing in which to do that. And so also for anyone who just needs additional time to formulate your testimony, you can ask for an extension of the record of one week, and oftentimes it goes longer than that depending upon the circumstances. If you want an open record longer than that one week, you need to make that request. While the record is still open during your public testimony. And so just kind of keep track. If you hear something tonight that warrants that, when it's your turn to testify, you can say, wait, I want to keep the record open longer. So give me an explanation as to why you want that. And we'll discuss the scheduling before we conclude on these items tonight. Remember though, while the record is open, you have to raise before me either orally tonight or in writing any issue that you want to preserve for a subsequent appeal to Superior Court. My decisions are the county's final decision in these matters, and they are appealable to Superior Court only by people who participate. And you can only take an appeal issue to Superior Court if you raise that issue before me. So you have to give me a chance at deciding it first. You also need to present to me any evidence that you want me to consider, or that you want to rely upon in a subsequent appeal to Superior Court. So be mindful of when the record is open and when it closes, because when it closes, that ends your ability to raise new issues or present evidence. So here are some basic do's and don'ts for participating. Tonight. We'll get a primer on how to function in this WebEx environment when I'm done from planning staff. But when it's your turn to testify, do so in that order. I just recited pro neutral con and there'll be a hand raising option. So we know who wants to testify. Your microphone will be unmuted and you'll have a chance. I think we have. Is it three minutes a pop, Richard. Three minutes. Each person gets three minutes to testify. But you have an unlimited ability to submit written comments. So here's kind of the worst kept secret in my hearings is that I'm a terrible note taker. And if you have written up some notes, some remarks that you want to make, submit that written summary I will take that'll come into the record. It'll become an official exhibit. I will have that before me when I sit down at my kitchen table to write the opinion. So it's a very useful thing to submit your testimony in writing. You do that by emailing to county staff following tonight's hearing. It's an easy thing to do. So when you testify, when your microphone unmuted, begin with your name. And I like to know kind of where you live relative to the development so I can understand your perspective. And a lot of times people, they live next door or in the neighborhood or along an arterial that will be impacted. So give me a notion as to where you live. And we have a couple maps that we can throw up to help orient me. So I want to know your name to start with, and then you can launch into your testimony. Remember that you need to stick to the approval criteria. So you have to tailor your testimony to those criteria. And because I can't take anything else into account, a lot of times people have kind of general, you know, the loss of privacy or kind of noise or glare, those sorts of things that come with urban development. When property was previously undeveloped, those those are not issues that are reflected in the approval criteria, but a lot of issues that bug neighbors that are concerned about are in those criteria. So I can help guide you, but you need to be mindful that my authority is pretty limited to those criteria in the code. If you agree with something that someone else has said, tell me that you don't need to repeat their testimony. I'll ascribe that point to you. You can move on. If you represent somebody else, let me know who you're speaking on behalf of so I know who has a stake in the outcome. Let's see. Remember to raise any issue you want to preserve for subsequent appeal. And remember to submit any evidence you want me to consider, or if you want to submit your comments in writing, do so by email and they'll become part of the record. So that's it. By way of my introduction. Before we get going, we'll hear from staff on how to navigate in this WebEx environment. So who's going to do that, Richard? >> That would be me, Mr. Examiner. Go for it. All right. Thank you, Mr. Examiner. For everyone participating in tonight's hearing, if you wish to testify about a specific agenda item, staff asks that you raise your hand so that we can gauge who wishes to testify. If you are a call in user, you can dial star three. Sorry, I had to switch the slide there. If you're a participant, you need to click on the hand icon located in the lower right hand corner of your screen or next to the name in the list of participants. Here is a graphic showing where you may find the hand icon shown by the Red arrows. You May 1st need to turn on the list of participants. You can do this by clicking on the participants button shown by the purple arrow. The hand icons are located in our sorry. The hand icon locations are indicated by the Red arrows. Once you have given your testimony, we would ask that you put your hand down. You can accomplish this action by either clicking the hand icon again or dialing star three again. We will also ask everyone to keep their microphones on mute at any time they are not speaking. I will show you how to do that in the next slide. Prior to the close of each agenda item, we will open all microphones for everyone in attendance to ensure that everyone who wants to testify has the opportunity. Please be aware that any noise in your personal environment will be broadcast at this time. If you miss your opportunity to testify for some reason, the record on each case will be open for a period of time, so you can submit your testimony in writing. Finally, the chat function has been disabled for public record purposes. As I mentioned, we asked everyone to keep their microphone muted at any time. They are not speaking. There are a few ways in which to mute yourself. If you're a web user and are using the computer for Areli for audio, you can simply click the mute button at the bottom of your screen or next to your name in the list of participants shown by the Red arrows. If you are a web user and using a phone for audio, you can either mute yourself on your computer or use your phone's mute capability. Phone only users can use the mute capability on their phone. We would ask that you stay muted any time you are not speaking, and I am the first hearing this evening as well, so I will jump into that. This is for the Marchel subdivision. Okay. Good evening again, Mr. Examiner, County staff and the general public. For the record, my name is Joe Kinsman and I am the land use planner for this project. The name of this project again is the Marchel Subdivision. The case before the hearings examiner this evening is a request to divide 2.5 acres into an 18 lot of compact subdivision in the R1 ten zone. As I said, my name is Joe Kinsman. I am the planner for this project and we have Alastair Dobson as our review engineer. Jason Noble reviewed this from the Fire Marshal's office, and Craig Caudill reviewed this proposal from transportation concurrency. We also have Mr. David Jardine here for transportation concurrency tonight as well. Okay. Tonight our during our presentation, staff will provide an overview and summary of the proposal, identify any major outstanding issues or concerns, and make our recommendation to the examiner. On the vicinity map. The subject property is identified by the black dot. For reference, North is oriented to the top of the page. We can see on this map that it lies south of northeast 139th Street. It is east of Interstate 205, west of 50th Avenue, and is abutting and just north of northeast 119th Street. Next we have the zoning map, which provides a closer look at the parcelization of the subject abutting lots. The site is highlighted in red here the site and surrounding parcels are zoned R1 ten. Other than the area to the south across northeast 119th Street, which is zoned R1 six. We have a budding other single family residences to the north, south, east and west. Okay, this is an aerial view of the subject area with the subject property lines in red. In this view, we can see the surrounding developments in the area. We can also see northeast 119th Street to the south. Northeast, 123rd Street to the north and northeast 50th Avenue to the east. And this view we have the proposed plan for the site. On this plan, North is oriented to the top of the slide in this view shows access from northeast 47th court into the site, as well as the general layout and configuration of the proposed lots. And next up, we have quite a few slides showing photos of the site. This would be facing the site north looking into the site on the south side of northeast 119th Avenue. Here we have looking east on northeast 119th Street, right in front of the subject parcel. Here we have the opposite view looking west onto northeast 119th Street. This view. We can see the. From the corner, the corner of the parcel on northeast 47th court. Looking northwest into the site. There's quite a bit of brush on this corner. And here is the southwest corner looking northeast into the site. >> Mr. Kinsman is how many houses, how many dwellings are on this property right now? >> Just the one. And there's a few random outbuildings. >> Just one. >> On this side. Yeah. In this view, we'll see from the northeast corner facing southwest across the site. There's the existing residence there, as well as some outbuildings over here on this left side. And this all the structures on this side over here are the adjacent parcels. In this image, we have the northwest corner looking southeast across the site. This is from standing on the middle of the east property line facing west. These structures are all on the adjacent parcel. And this is the middle of the west property line facing east, and the access road or proposed access road is right on the other side of this hedge here. And let's see here. Okay. And the staff report, the fully complete application was submitted on July 29th, 2026. The application was deemed fully complete on August 25th of 2026, and the Notice of Development application was issued on October 1st of 2026. Staff's recommendation to the Hearing Examiner, as well as the Party of Records, was issued on the. On October 28th, 2026 and is in the record as exhibit 24. Here we have the project issues that associated with this site. Several public comments have been received regarding the legality of the access to the site. Staff's comments regarding access are below. This proposal intends to access the site from northeast 47th court, which is shown as a non-exclusive easement on the adjacent Clark County plat the plat. >> I see you've got exhibit 31. My exhibits go as far as 28. So what's exhibit 31? >> That is, the associated plat that I'm referencing here. And I'll also I have that on the next slide as well. So okay. Reference the plat note for you there as well. That one I, I threw that in there today just so it was easily referenced in the, during the hearing for you. So and like I said, it's in the next slide here. Also, the applicant bears the burden of providing that legal asset access exists or has been obtained. And here's the adjacent plat, the the parcel in question is to the left of northeast 47th court here shown on this image. As you can see, the note that is circled in red says that all road easements shown are non-exclusive private road easements for ingress, egress, and utilities. And obviously we'll give Andrew. A moment to to speak to that as well here. Coming up. >> So right now, how many homes are served by 47th court? >> To my knowledge, there's three in this short plat. There's lot one here and there's two and three to the north. >> Okay. >> And I can, if you want the full plat, I can pull that up here on a separate screen and bring it over if you need that as well. Just let me know. >> Yeah, I'd like to see that. >> Okay, I'll pull that up then. As far as the recommendation staff recommends approval subject to the conditions of approval identified in the staff report as exhibit 24. Let me grab that full plat for you. There we go. Okay, so that is the full plat. The parcel in question is over here on this side. Well, it kind of extends further up. >> Does it go all the way up to the top end of this short plat or beyond? >> I it goes to like that. >> Okay. Yeah. The full, full plat. If you could make that the exhibit. >> Sorry, what do you mean by that? >> Rather than just that snippet you showed earlier, the full plats, the what I would like to see be able to look at. >> Oh the proposal. >> No, this, this short plat because the first slide you showed was just the bottom part of it. >> Correct. Yeah. And this, this is the exhibit that I put into the record. Good. So yeah, sorry about that. Sorry for the confusion. I just I only included that portion so that it was clearly visible within the, the PowerPoint presentation. Yeah. That's, that's it for, for staff's comments on this, I'll, I'll remain around for, for any questions that you may have or anyone has. >> I think the questions I have kind of relate to that 47th Street court. So I'll wait to hear what the applicant has to say about that. Let's see, Mr. Dawson, are any engineering issues that we need to know about in particular? >> No, I don't think so. >> Okay. And I didn't see concurrency as a big deal here any. Mr. Jardine, is just any thorny concurrency issues that you're aware of. >> Not to my knowledge, but I'll let Craig Cottle talk about that is the concurrency engineer that wrote the decision. >> Okay. Mr. Caudill, anything. We've had a few concurrency contested cases recently. This didn't seem like one of them. >> But no, this was not one of them. This one was fairly straightforward for concurrency. >> Okay. All right. That seems fine for the moment from staff. I'll take the applicant's presentation at this time, please. >> And I will start the 20 minute timer after they give their address and everything. >> Okay. >> Hi, Tevlin. My name is Kelly Hickok, I am an attorney at drew, and I. >> Did you. You're kind of garbled, miss Hickok, could you move closer to your computer? It sounds like you're too far away. >> Okay. Is this a little bit better? >> Yeah. That's good. Thank you. >> Okay. So, yes, I'm representing the applicant today on the subdivision PLD 2026 0001 3 or 1 zero three. And my address is 1211 Southwest Fifth Avenue, Portland, Oregon. And so I'd like to begin with just addressing, I know the hearings examiner asked for the current version of the development plan. And so it's the application package is found in exhibit one. And then supplemental materials were submitted by the applicant on 1014 in response to the county's early issues memo. >> So I'm looking at, I think the the last revision was exhibit 15. Is that right? >> So there's exhibit 16 was submitted by the applicant, and it looks like they're also. 21 and 22 were submitted on October 28th. >> Yeah. As far as the plans concerned. 15 sorry, this is the the plan is. 15. 21 is the Health Department letter. And then. 22 is the. Just a building like a first floor schematic. >> Yeah. Okay. Okay. Go ahead, Miss Hickok. >> Thank you. I'd like to begin with a brief explanation of how the application meets the applicable standards under the Clark County Code. And then I'd like to specifically address some of the public comments that we've received in opposition to this application. To begin, the key code provisions for this application are the compact LOT standards found in Clark County, code 426072 B one through three and compact lot development is a permitted use in the R-1 ten zone. This application meets these provisions for the following reasons. Compact lots are allowed on parcels of three acres or less. This parcel is approximately 2.27 acres. The second requirement is that the development must be served by public water and sewer and final plat. Public water from Clark Public Utilities and public sewer from Clark Regional Wastewater District are available in nearby streets. The third requirement is that the parcel was created prior to the compact LOT ordinance adoption. In this case, this parcel meets that requirement as well. And the fourth requirement is that the proposal is not part of a planned unit development. The first issue regarding the public comments that I'd like to address is northeast 47th court. County staff, appropriately directed access to northeast 47th court because of the existing conditions and to ensure consistency with the county's access management standards. As it stands, this site is not a blank slate as was explained by staff. Rather, the surrounding environment is already built out that North East 119th Street to the south is an existing arterial northeast. 47th court is an existing paved road that already intersects northeast 11 119th Street and northeast 47th Avenue is an existing paved road which was constructed by the Strawberry Hills two development and when the county approved that development, as well as the placement and construction of northeast 47th Avenue, the county actually contemplated future development at this site. And so because of these existing conditions, the applicant is unable to create a separate vehicle access to northeast 119th Street and adding a new separate access point so close to that existing northeast 47th court 47th Avenue intersection would not only be illogical, but also would present safety hazards by creating a new conflict point on that arterial. So because that 47th court roadway is already built, the applicant is providing safe access to the property in the way that the existing conditions allow. Under condition A, six E, the applicant will improve the road to urban private road standards. This will widen the pavement from 20ft to about 20ft to 24ft with curb gutter, a five foot sidewalk and a turnaround. And none of that exists currently today. So the residents of northeast 47th court would benefit from this too. Several public commenters have brought up the issue of easement rights. However, this application does not ask the hearing examiner to decide private easement rights. Those challenges relate to title and possession issues of real property, and thus those concerns would fall under the original jurisdiction of the Clark County Superior Court. Under article four, section six of the Washington State Constitution. The question today before the hearing examiner is much narrower. It's whether the proposal can meet the county's code with the conditions. As stated previously, condition A6 e requires the code to be built to county standards within that existing 30 foot easement, which is recorded as a non-exclusive private road easement for ingress, egress and utilities. It's applicant's position that if a condition was imposed requiring the neighbors to consent to the use of northeast 47th Court, this would essentially grant a de facto veto power to the neighbors. Regarding a project that meets county code. It's also the applicant's position that such a condition would be void for public policy due to the state of Washington and Clark County's clear preference for infill development, which I'll get into a little bit later. Several public comments also addressed the intensity of this use, in particular, concerns about increased traffic, construction vehicles and speeding along that road. Regarding traffic, the applicant has provided a traffic study as part of its initial application package. The estimates 155 new daily trips with 12 a.m. and 16 p.m. peak hour trips. The traffic study also shows that the northeast 47th Court, Northeast 119th Street intersection has operated safely since that northeast 47th Avenue was built regarding construction vehicles and speeding. The construction traffic would only be temporary and would end once the project is built out. And while the applicant does agree that speeding is a hazard, that's a traffic enforcement issue and the applicant can't control how fast drivers travel and can't be conditioned to control that in this case. Public commenters have also raised concerns regarding the entrance, intersection spacing and site distance. These concerns were addressed by the road modifications that the application requested, and staff supports approval of the northeast 47th Court and Northeast 47th Avenue. Intersections are offset by about 10.5ft, where the code generally allows five feet on these arterials. That offset is an existing condition that was created when Strawberry Hills two was built, and when it built that northeast 47th Avenue. And so. >> To be clear, you're not seeking a road mod to site distance, are, you. >> Know. >> Okay. >> Just to cross circulation. And then the spacing, intersection spacing and the cross circulation road is needed because it's a private road. Right? >> Right. >> Yes. And that was also the county recommends approval of both of the road lots requested by the applicant in this case. The other public comments also addressed seem to be kind of grouped into zoning density and lot size issues. This site is located inside the Vancouver Urban Growth Area with an urban low density residential Comp plan designation. The surrounding area is already developed at urban densities, including that Strawberry Hill subdivision. This project is continuing an established pattern of infill. It's not bringing urban density into a rural setting, and this type of development is actually fully encouraged at both the county and the state level. At the state level, the Growth Management Act directs growth to urban areas with adequate public facilities, discourages sprawl, and requires urban growth areas to permit urban densities. And that's our CW 3678020 and 3678110. At the county level, the comprehensive Plan uses its land use element and growth management framework to direct growth inward rather than outward policy. 1.2.5 restricts amendments to the urban growth boundary, specifically to encourage infill development such as this and policies 1.1.6 and 1.28 direct directly into areas that are already served by public facilities. The county also recently passed ordinance 2026 ten one, which was effective October 23rd of this year, and in that ordinance, the county consolidated residential zones in unincorporated Vancouver. UGA, roughly 6700 parcels were zoned, clearly showing that this is intended to intensive development due to current conditions. The recent 2026 updates also work to make smaller or irregular infill lots viable by lowering minimum parking requirements and revised density calculations, again showing a clear preference for increased density. To conclude, under Clark County Code 454040 D, the Hearing Examiner must approve a preliminary plat if the applicant shows that the application complies with the approval criteria, or that the application can comply with those criteria by complying with conditions of approval. As noted during the staff presentation, staff recommends approval with conditions and applicant accepts those conditions. The applicant respectfully requests that the hearing examiner approve the subdivision application with the conditions as listed in the staff report. If you have any questions about the application, Andrew Guenther from LS engineering and I are prepared to answer your questions. Thank you for your time. >> Okay. Thank you, thank you. I that pretty much covers the issues that I had. So I don't I don't think I have any additional questions. Okay. Thank you. Anything else from the applicant side of things for the moment? >> Unless, Andrew, you had anything that that was all about presentation. >> Yeah. No, I don't have any further comments at this time. Thank you. >> Okay, good. With that, I'll take testimony from anyone else in favor of this proposal. Anyone out there in that category, raise your click the Raise your hand button at the bottom. Anyone out there? Richard. >> I'm not seeing anybody yet. >> Okay, let me move on to those with neutral testimony or questions about this project. Raise your hand. >> Nope. >> Okay, let me roll on to those opposed. Anyone out there want to testify in opposition to this proposal? Click the Raise Your Hand button. >> Yes. >> Go ahead. >> We have Teresa Williams. >> Okay. >> Teresa, you should be able to unmute yourself. >> Okay. AM I unmuted? >> Yes, I can hear you. Go ahead. >> Great. First of all, I'm Teresa Wilson, not Williams, WILSON. My husband and I own the property located at 12015 northeast 47th court, which is the northernmost residential lot on northeast 47th court. Also adjacent to the proposed development. Okay, as has been noted, I mean, northeast 47th court is a private road on property owned by us and two other residential property owners. It was created by a covenant that established an easement when the two of the three houses were developed in 1991, the Marchel sorry, I'm going to pronounce it wrong. Marcel subdivision plan proposes use of northeast 47th court to access the proposed development. As has been discussed, our covenant for private maintenance of short plat approved private road which is part of our property title report, created the private roadway and governs the maintenance. The easement allows access to all three houses on that road. It was intended to allow access not just for the first original house, but to the other two houses, and therefore was non-exclusive. It wasn't wasn't just for one house, right? It appears that we're interpreting this, that the applicant's interpreting this to mean that his adjacent property can use northeast 47th court at will without owner permission. That clearly was not the intent of that covenant to allow other adjacent properties to use the road 35 years later, at our expense, without owner permission to do so. I will add that I don't see how this development benefits our properties at all. So I'm sure you'll hear from other commenters on that. But the fact is that they don't have permission to use the road, written or otherwise, and therefore it's not feasible as it's laid out. And as the county said in the comp, the staff reports for the pre-application in 2024 and the pre-application staff meeting in 2025. Both of those reports say the applicant shall provide written approval from the owners of the private road in order to show feasibility of the proposed access. So at this point, it sounds like the applicant has not shown feasibility of the proposed access without having permission to use that road. So. And then the final staff report also noted that in the in the plat notes this was section D seven plat notes. Item G indicates that the final plat must include the following. Note the lots have legal permission to enter and exit via a either public way or driveway easement or private road. They don't have that permission to use that road. It sounds like there might be. We might need to to get a lawyer for this. But at any rate, you know, we're not giving permission to use the road, which is clearly owned by us. So I'm not sure how the county can dismiss that. If it was originally stated as something that would be required to demonstrate feasibility. If the county code doesn't talk about feasibility, then I'm not that that doesn't make sense to me why the county code wouldn't, or why the county would not be interested in whether the project is feasible. So that. Thank you for your time, I appreciate it. >> Thank you. Question though. So this non-exclusive access easement, is it solely established by this plat or do you know, is there a separate easement document that was also recorded? >> Yes, it's the declaration of Covenant for private maintenance of short plat approved private road that was signed in 1991 by the developer of these, the two additional lots. >> So his 1991 this this was platted. >> Yes. >> And so it's a it's stated on the face of the plat. >> It is I, I apologize, maybe I'm not that familiar with the terminology. So we have the the declaration of covenant that is part of our title or it's part of it. It was it was handed to us obviously when we bought the property. So I'm not quite sure what the difference is between it being if you're asking if it's on the plat. >> So, Mr. Kinsman, can you throw up exhibit 31, the this short plat we're talking about there. So this the way it works these days is when there's an easement established or a road dedicated or something like that, it's shown on the plat and that's how it gets established. I haven't had a chance to study this thing, but used to be, and sometimes still today, that people will record a separate easement. It looks like a deed, but it's called an easement. And it'll say, you know, property owner X hereby grants a property owner Y an easement, a basically permission to use part of property owner X's property. But so you know what the lawyer for the applicant said is true, that, you know, the world doesn't care what I think about deeds and easements. It's really only a judge, someone in a black robe who gets to interpret them. But I would like to know I, I would be compiling a record for any subsequent review by a Superior Court judge. I would like to know just where all this easement is established. If it's purely as a plat note on this short plat, or if there's a separate easement that's been recorded conveying it, that would be good to know. So I'll just I'll just leave that with you. You may not know the answer to that. And the applicant might want to kind of enlighten me a bit on rebuttal, but I just want to see what's the universe of title documents, recorded documents that established this easement thing. See what I mean? >> Yes. Thank you. There is a separate document we can provide, and I think my some of my neighbors probably have more detail on that as well. >> Okay. >> Okay. Very good. Thank you, thank you. Who else? Who else out there would like to testify in opposition? Raise your hand. >> We have Scott Lewis up next. >> Go ahead, Mr. Lewis. >> Mr. Lewis, you should be able to unmute yourself. >> Perfect timing for me. I'm Scott Lewis, my wife Julie. We live right next to the Wilsons. Where? The middle house on 47th court. >> Okay. >> I'd like to note that that the pre app said that again. He was the developer was supposed to come talk to us. Told him twice to do that. He never said a word. So we got blindsided with this at October 28th or whenever it was when the letter came to us. So we've had a short period of time. I had a death in my family, so it's been a little, little hectic for us the last ten days, but I'm going to try to be as quick as I can. I'm glad you're attorney so. He thinks he doesn't say he has a right to access. He said he believes he thinks that it was the intent of the developer. Well, I'm going to go ahead and and read the road maintenance agreement to you. There's four items in it, and I want to see what you think. So the underside owners and developers of the covenant agree that the first one, there's four things. One, we as owners and developers of the efforts for described property, the plat, or of any lot which has been or subsequently created on the said property are plat shall be responsible for the maintenance. Okay. It said it twice there our plat number two maintenance methods within such effort four scribed property number three owners of lots within the above referenced short plat, it says it wants to are served by such private road may sue and recover blah blah blah within the short plat. So it says it twice there. Now here's the kicker that I think will explain the boilerplate that they think gives them access, because there's a lot of plats that have that exact boilerplate. And it had to be on there because it was granted by the developer. But let me read number four to you. It says the private road easements within this short plat, within this short plat. Are so stimulated on the plat. So all the roads on the are. >> You cut out. >> They all have the. >> You you cut out there. I didn't hear that. >> All the roads on the plat or the, all the. The private road would be non-exclusive because we. When he did the subdivision, the lots were bigger than twice what was allowed. So each one of us could have short platted. The houses weren't built yet. >> Well, so here's, here's the here's the problem. I don't think the maintenance covenant covenant decides the question. They're not asking whether they get to maintain it or not. They're asking whether they have legal access. >> Right. And that's and that's what it finishes saying. So on that same paragraph where it talks about it's just referring to our plat. It says all easements, unless otherwise noted, may be used to serve adjacent properties, as long as those properties are developed according to title 17. Well, this isn't the number four paragraph that's already been stated. It talks twice about our private lots and it talks about adjacent properties. If it was supposed to be for him, wouldn't you think that that would be paragraph number five and saying all easements. It's a whole separate issue. It's and it didn't. It's got the adjacent properties are right there in the same paragraph or number four that talks about our private roads. So I'll read it again. The private road assessments within the short plat are intended to be non-exclusive. That's why they got the boilerplate at the bottom. There's a lot of plots that have that same boilerplate. That boilerplate doesn't give them carte blanche to tear our hedge out and then make us join another road maintenance agreement. Our road, this road maintenance agreement is it runs with the land. I think you know what that means. That is passed on. I can't change it. The neighbor can't change it. None of us can. >> Change it. Have you have you submitted? Is there a copy of this maintenance agreement in the record? >> I can't believe you don't have it. That's blows me away that they would submit that. >> Did you submit it? >> I don't know if I did or not. >> It's kind of important that you do. >> Well, I will I would assume that you would have had it. I can't believe that the that that wasn't brought up because it explains exactly what the non-exclusive and adjacent properties are. And it's in paragraph number four. >> It's right. I go ahead and submit that, submit that. And you heard my question to Miss Wilson also about is there a separate easement or is the access spelled out purely in as a plat note, which I can't read right now until I actually see. >> This on the road mains agreement. It's just what they're going by is what is, is that that very bottom boilerplate? Now, now think about this. There could have been a total of eight lots made on this road. That's what it was designed for. It's a private road that's only allows up to eight lots. If his intent, because they're saying the intent was for them to be able to join it too, if his intent was for them to be able to join, it, wouldn't. They made a much bigger, stronger lot because it was only good for four and his house was already zoned for 110. >> Here's what you. >> Need here. >> Here's what you're going to need to do. That's that's a perhaps a reasonable interpretation of that. You should quote that and kind of spell out that argument and submit that. >> And if you want intended to for the neighboring properties to join it, why did they put the road five feet off the property line? We have this huge thing. It was so ugly over there. That's why he planted his hedge. I can't believe they didn't show you a picture of our hedge. We have the most beautiful road. We just resealed it. He's never come over to ask to see if he could maintain the hedge. Reseal the line. He has nothing to do with this road maintenance agreement, and I don't think that he can go in and cancel ours and make us join his road. You know, his road maintenance agreement makes us take care of what he's building on his lot. Right? >> Right. I understand it. Your time is kind of expired, though. Let me. I see you have an exhibit in the record, exhibit ten, a letter. I'll read that more closely, but any additional documents that you would like me to take into account? Make sure you kind of formulate your arguments and submit that the record would be left open at least one week following tonight's hearing. Okay. >> I appreciate your time. >> Okay. Thank you. So anyone else wants to testify in opposition? Raise your hand. Click the raise hand button. >> We have Robert Wilson. >> Robert Wilson. Okay. >> Robert Bestine, can you hear me? >> Yes. >> Okay. >> Good evening. My name is Robert Wilson. I live at 12015 northeast 47th court. I was the owner. Northernmost northeast 47th court. I. Yeah. >> I don't really have numbers in front of me. I know there are three lots on 47. >> I'm I'm I'm at lot three. >> The top one. >> The top one. Yeah. >> Okay. >> I'm one of the owners of 47th court. Now, what I'd like to point out is that the owner of 4700 northeast 119th Street also owns the adjacent parcel to the west, parcel 18629000. The west of that parcel, parcel 186302000 has a type two short plat application in with the county PD2022-0046, named the 1/19 street short plat. The road modification narrative for the Marchel subdivision. Exhibit 14 shows that part of the 1/19 Street short plat development is to connect northeast 45th and northeast 46th Avenue, which connects Greyhawk east to Greyhawk Ridge. The proposed design could be modified to extend to the property owned by the applicant. We heard that the applicant is not renewing the current lease to his current renters on the parcel, which suggests he is already planning its development. Having that 1/19 Street short plat modified in the way would give him access to develop both properties without using our private road. If this application to you. >> Wait wait wait wait. Yeah. >> You're assuming that I you you rattle off parcel numbers that I have a clue where these parcels are. Mr. kinsman, is there a map or schematic you can throw up that can help orient me because I'm. I'm really lost with this testimony. >> Oh. I'm sorry. Yeah. It's exhibit 14. >> Exhibit 14 appears to be preliminary stormwater report. Well. >> It's the one that actually. There you go. Yeah. If you can go down and go all the way down to, to, to the fifth page. Oh, is that not the right document? Hold on. >> I so a lot of times one way I orient myself is the adjacent development exhibit that comes in with the application. >> That parcel are you referring to. >> You've got the wrong one. I'm sorry. You're you've got to look at the exhibit 14. >> Okay. Here the subject parcel is highlighted. >> Road modification narrative. >> Okay. Do you want the road mod narrative. And you find that you. >> He's talking about tab 14. It's attached to exhibit one I think in the original application package. >> The traffic study. Yeah, yeah. >> It's the traffic study. >> Okay. And page five he said. >> Is it. >> Can you guys still hear me? >> Yeah. Yep. >> Okay. I got a weird screen on my. It is a, it is a top view aerial view photo of this of this property. >> Aerial photo. >> Yeah. I don't have that in this exhibit. I can use the Clark County GIS sheet if you want. I don't know, it's not going to show you referring to. >> Okay, so it's delayed delayed. It's if you keep that right there, right. If you look, I wish you guys could see my mouth mouse. If you look at Grayhawk East, which is. Right. So you look at the our road 47th court, then you look at his dirt driveway that goes up to those homes. And then you look at the the road just off to the left there, right. >> Right here. >> Well up there, yes. But then you look down to the go down to 119th Street. You go down 109th Street. Now go to your go to your left, go to your left, go to your left with the mouse. Keep going, keep going. >> 45th Avenue. >> Right there, 45th Avenue. >> Now go. >> Up. >> Up and then over. And then you can see there's a road up above there. >> Okay, so that parcel, you say, who owns that one? >> Well, I can certainly I mean, I could take me a while to try to find it, but that they already have that in the, the, the short, the type two short plat application is PLD2022-0046. >> But so it's not this property owner right. Somebody else. >> Correct. >> Yeah. >> But that connection is the connection is shadow platted there between 45th and 46th. So how does that help you. >> Well well how that helps me is, is if they're going to put that road in that, that that property where you see where the blue, the blue square is around the one square to the to the left of that he owns. >> Okay. >> So that they could get access right here. AM I understanding that correctly? >> Okay. >> He has not. And he has already not renewed his lease with his renters. He has told his renters that he's planning on developing that lot. So what that means is, is that when he develops that lot, if he uses our 47th court, he could add eight more homes onto our road. >> Okay, I think I get your argument now. I got it now. Okay. All right. Your your time is expired. Let me digest that. And also, I see you and your wife submitted exhibit nine. Your letter. So I'll I'll look at that with this information in mind. >> And well. >> You might want to like take, take, take the drawing and, you know, articulate this and >> Just drop down a few notes and submit that as an exhibit during the open record period. Okay? >> Okay, I will do that. But I just also want to point out that if we could do shared screen, I could show you directly, but I had to wait for your gentleman to try to find this stuff. So that took a lot of my time up just now. >> So I. >> Got it, I got it, we finally got there, we finally got there. But you understand, my constraint is that I really need pictures. And so we found it. >> Okay, okay. All right. Okay. But I also want to point out, I mean, we've been paying the taxes on this road for 25 years. We have done the right. >> I've seen, I've seen, I understand that argument. I've seen it in the record. And so you. The okay. >> You're right. >> With interpretation of deeds is nothing that any court defers to. So to defers to me about. So I understand your argument. And so we'll just hear what the applicant has to say by way of rebuttal. But I have a feeling I'm not going to be the final decider of this question. >> Okay. >> All right. Okay. Well thank you. >> All right. Thank you. Who else would like to testify in opposition? Anyone out there? Richard. >> We have on Andre's. I'm not probably not pronouncing that right on Andre's. You should be able to unmute yourself. >> Yes. >> Go ahead. Andres. >> Okay. >> Good evening everybody. Can you can you guys listen to me? >> Yes. >> Okay. My name is Andres. I own the property located at 4804 northeast, 119th Street. Has been the owner for the past five years. My property, my property title confirms that I, along with Bob and Scott, we are the rightful owners of the private road on 47 court. >> Okay, so your lot number one. >> Yeah. >> There's lots two and three. Yeah. >> Got it. The site plans also verify this. I sent three different separate letters drafted by my attorney, which I have gone unanswered. >> Yes. Your your letters. I see two of them. Exhibit six and exhibit 27 there in the record. >> Yeah. >> Thank you. >> The site plans and deeds clearly state that the Scott, Bob and myself are the owners of this private road. I have attached all the supporting documentation as. As a legal legal owner, I firmly object to the use of the private road on 47 court. The developer has two other access points available for the. For his project via 119 Street and 48 court. I'm not willing to suffer a significant loss in my property value, a loss of my privacy or emotional distress. Also, the developed developer can build more houses. That's my objection. Thank you. >> Okay. Thank you. And I'll take that into consideration. I've got your your letters, which spell that out in pretty good detail. Thank you, thank you. Anyone else wish to testify in opposition? Raise your hand. >> Scott Lewis has raised his hand again, but he's already testified. So I don't know what you want to do there. >> Yeah. Mr. Lewis, you've already testified. The most important thing you can do at this point for any of you is to submit, you know, focus your arguments and put them in writing and submit that. I mean, all of you have exhibits in a record already. So any additional documents, like if there's a separately recorded maintenance agreement, covenant, anything like that. Sometimes title reports are useful because they spell things out in pretty clear language that would be helpful to. So anyone who hasn't testified like to testify in opposition to this thing. >> No, there's nobody else. >> Okay. I'd like to hear the applicant's response to these arguments, if I could please, because I as I mentioned, I have not studied this short plat. If that's the only place this easement is established. So, Miss Hitchcock, you up? >> Yes. >> Go ahead. >> Thank you, Mr. Hearing Examiner. So, as I previously stated, this application is not asking you to decide private easement rights. Those would be decided by decided by the Superior Court and requiring the neighbors to consent to the use of northeast 47th court would grant a de facto veto power to these neighbors. Regarding this project, we've already argued that. So yeah, we've argued already that a condition like that would be void for public policy. Addressing some of the other comments. >> So just if you could, if I could interrupt here, if you could, is there a separately recorded easement or is this established entirely on the plat? >> So in my review I didn't find a separate easement. It was the place that I found it was on the plot. But that's something that we can address in our post-hearing brief as well. >> Okay. >> And when this was platted, the your property that you're developing, that was not part of that plat. Right? >> Yeah. Okay. >> Okay, good. It sounds like there just isn't a whole lot of, you know, there's not a whole lot of documentation about this. And as you know, it comes down to original grantor's intent as to how broad the easement is, but you're ultimately right that I don't wear a black robe. So I don't really get to interpret title documents. >> Title documents. >> And then I asked all the other issues that I think were brought up during the public comment. One of the commenters brought up why not a second access via northeast 119th? We addressed that where the frontage can't even reach that 100ft of separation against the 150ft driveway. The additional issues, the road maintenance agreement and the PLD202200046. The applicant would wish to address these issues in the Post-hearing brief as well. I don't have those documents in front of me and I don't feel comfortable arguing about those. >> Okay, that was that other chunk of land to the west. That was. Yes. Okay. Yeah, that I, I, I remember reading the letters in opposition letters. I couldn't make sense of them since those two stub streets are like far from this property. But I guess with the intervening parcel, maybe under common ownership or something, I guess the the argument makes sense, but I'd like to hear your side of the story for sure. >> Okay. >> We'll address that argument. >> Okay. >> Is that it for rebuttal for the moment? Wait I see pls has raised their hand. They get to rebut a little bit to yeah. >> Just real quickly, just to kind of. >> Introduce yourself for the record. >> Sure. Yep. Andrew Gunther with PLS engineering the engineering planner for the applicant. The just to clarify a little bit related to the, the off site proposed short plat further to the west of us. >> We don't have any call that. >> What's that. >> We'll call that one plan B. >> Okay, that sounds good. So so plan B does not provide us any legal access to their proposed street extension. That roadway does not. The right of way doesn't propose right of way. Doesn't extend onto adjoining properties east of that plat. And so even if we wanted to, we don't have any legal right. Furthermore, beyond that, we have no time frame for when that project might be completed. It does have preliminary plat approval. I've talked with the consultant that did the preliminary planning work on that site. They're not currently on under contract to proceed with any final engineering work. So it just at this point, it's not an access option for us, even if we wanted it to be. So just just wanted to give you that background. I'm sure that'll be backed up in our, in our brief as well. >> Okay. As I understand, the argument for plan B is the intervening parcel is owned by the same person who owns this one, the your project property, and they've terminated the renter's lease on it, indicating its development time or something like that. And so they're kind of projecting a connection through it in the future, which your stub, your private street stub would suggest is also the county's cross circulation plan for the future. But that future may be like way off in the future. So I think that's my sense of what the argument was. >> Yeah. And I'm not aware of any intent to develop that property or any terminated lease agreements of any nature. >> Not your deal. >> Not my deal. But I have a fairly high level of certainty that that's not the case. So. >> Okay. >> All right. Is that it for the moment then? >> Yep. That's it. >> Thank you. >> Okay. Thank you staff. Let's go back to staff. Anyone out there want to respond to anything you've heard tonight? >> This is Alistair Dawson with Development Engineering. I just wanted to state that it is not the county's preference to grant access onto 119th Street, as has been mentioned. That's an arterial. So an evaluation would need to be done to see if access is feasible. Things like driveway spacing or intersection spacing could come into play. The median channelization policy crash history. We know site distance is available. Currently, we'd have to evaluate site distance at a different entrance location, so it's not just as simple as, oh well, they could take access from 1/19. It'd be a very thorough and technical evaluation by the county. So I just wanted to throw that out there. >> Not an easy thing. May not be possible either, right? >> Yeah. I may not be feasible. >> Or I mean it would be contrary to the county spacing, correct? Yeah. >> Yeah. So my point in saying that is they may need a road modification that the county may not grant for access onto. >> 119 okay. >> I get that. Okay. Anything else? >> Nope. That's it. Thank you. >> Thank you. Okay. Is it time to talk about open record? I think since the applicant has the burden of proof applicant, how much time would you like? We have automatically one week, but usually I have. You know, the applicant in this case wants to submit additional material. I think the neighbors do. The first segment is usually anybody any relevant topic after which people can respond to what comes in during the first period. And typically in that scenario, the applicant might, if you're going to be submitting anything, any new evidence applicant, you'll want to submit during that first period so that people can respond to it. So applicant, I guess, Miss Hickok, how much time what do you suggest by way of schedule here? >> I think we would be comfortable with the typical seven. >> Okay. Okay. >> So what she just suggested is what we call in the business seven, seven, seven, seven days for this first period. Anybody any relevant topic to submit, including new evidence into the record? The second seven day segment is just to respond to things that have come in during the first segment. And then the last seven day segment is just for the applicant. Final rebuttal, no new evidence. So that's what you're suggesting, Miss Hickok. Okay, everyone, especially the opponents. Does that make sense to you and will that work. >> For you, that work for you? >> So the the Wilsons, Mr. Lewis and Andreas, does that make sense? >> Yeah. This is this is Theresa. Can you hear me? >> Yes, yes. >> I, I just want to add, I mean, that that it sounds great, but, you know, we're, we're still playing catch up here. So we also have I know that my husband and I have been trying to retain an attorney and we called a dozen attorneys and can't find anyone who has time to take on any case. So we're struggling a bit with the property issues and the legal side of it. So I don't know if that's enough time for us to really pull this together. So I can't really comment on that. >> Yeah, it may not be enough time to retain a lawyer and weigh in that way. I don't know that. The land use appeal is necessarily the way you would proceed anyway. >> Right. >> But I, I can't really delay this process. We're obligated by state law to move this along, you know, not not at lightning speed, but it has to progress at a pretty good clip. And we can't just put it on hold while people lawyer up. So unfortunately, you'll have to do the best you can to get a lawyer. I know that's not an easy thing, but my sense of the arguments and the testimony I've heard tonight and the exhibits, you people are on to the issue. So I think you've you've preserved the issue for a subsequent appeal, if that's where this goes. So my decisions come out approximately two weeks or so after the record closes, after which you have 21 days to appeal to Superior Court. So that gives you enough time to, to find a lawyer and file an appeal to Superior Court. All of you have standing at this point and can do that. And the issue has been framed in these proceedings. So I don't see that as a real detriment. But so I'm inclined to go ahead with this open record schedule, as I have just recited. So let me pin down the dates here. Today is November 12th. So the first segment would get us to close of business 5:00 on November 19th for the for the first seven day segment. So it'd have to be in county planner's hands. So you'd send it to Joe Kinsman in his hands by 5:00 on November 19th. The second segment would end 5:00 well on Thanksgiving Day. So let's push it to Friday. Okay, so you can prepare your comments over Thanksgiving and have it in the record by Friday, 5:00 PM. On November 27th. And then the applicant's final rebuttal would be the first Friday in December. That is the fourth at 5:00. Does that work for everybody? Does that make sense? Any objections to that schedule? Seven. >> Seven, seven. Seven, seven, seven. >> Hands raised. But I'm not sure if. >> See, Miss Hickok said, okay, who's got their hand raised? So here they say. Is someone out there. Richard. >> Yeah, I just Scott Lewis should be able to unmute. >> Mr. Lewis. >> Mr. >> Lewis hi. I actually I'm Julie Lewis, I'm Scott's wife, and I thought that I could talk on the same platform as him, but every time we tried to raise our hand to talk. You said you thought it was Scott. >> Okay, well, you you can you can testify. >> I just wanted to add just a couple things. I know she was talk. The attorney was talking about the intersection across from the street on 119th from us on 42nd Avenue, I think she called it. Or. First of all, I just wanted to you and you may already know this, but that street's 42ft wide. Our little private drive is 20ft wide. And then we own the 4 or 5ft after our private drive onto the where they are building the subdivision. >> So to the. >> To the west. >> Is that to the west. >> I think? Yes. >> So yeah, it's. >> Offset the road. >> It's the road. And then we own 4 or 5ft after that where our hedge is built. Yeah. So the road's not the road doesn't bud up to their property. But I'm. >> Just saying. >> They're, they kind of made it sound like everything was intersected that way to make it look like it's a cross street. It's not like that. That street across the street is 42ft. It has two lanes. Ours is a little private drive that can't even fit two cars at one time. >> Yes. >> I, I noticed that if you look at the drawing, they're, they're offset. And it's because the dimensions are different and you're all squished to the west. >> And our road is very small. It's not a road big enough. Even if they add four feet with curbs and parking, two cars aren't going to be able to drive on that road. You're going to have like 3 or 4in in between them. So I'm confused why why they're comparing. >> The thing that they would have to do is just build it to the county's private road standard, that they're set dimensions in the code as to what those dimensions are. And they said that they would meet them. So they would add on whatever additional width is needed and pavement. So they it appears that they can meet the private road standard. >> And then I was wondering, why is 46 not a option? Because he owns that street on the other side of his property butts up to it. So what? Why is that not an option? Everybody keeps talking about the other one down from there, but why can't that be his option? Instead of making our property values go down 100, $150,000 and making our our road so that we don't have any privacy, why can't he use his own road on 46th? >> That's one at a time, please. That is something the applicant should probably address in their written rebuttal. >> Okay. Because I just nobody has brought that road up. So I was just wondering. >> Okay. Good point. Okay. >> And I like the way the attorney said that tearing out my hedge and putting in a sidewalk benefit me. >> You, your wife got to testify. >> Yeah, he's already. >> Have two. >> Okay. >> Thank you. >> But everyone. So the schedule is as I recited seven, seven, 7th November. 19th, November 27th and December 4th. The record will remain open. The record will close, in theory, on December 4th, and my decision will issue approximately two weeks later. Anyone who hasn't already signed up to get a copy of my decision, get your contact information to Mr. Kinsman so that we can do that. And that concludes this item for tonight. And let's roll right into the next one. Glenwood Landing PL D2026-39 is Mr. Matson. Whenever you're ready. >> Thank you, Mr. Examiner. I gotta pull up my. >> Take your time. >> Get started here. Are you seeing my slideshow? >> Oh. >> Well. It's uploading. Sorry. >> Okay. >> Microsoft is having a rough day. >> It has been a bad day for Microsoft. It turns out to be a good thing that we don't use teams for these hearings, right? >> Okay. How about now? Yep. >> Yep. It's up. >> Perfect. Okay. Thank you. Sorry about the delay. The. Good evening, Mr. Examiner, County staff and the general public. For the record, my name is Brian Matson. I'm the land use planner for this project. The name of the project is Glenwood Landing Subdivision. Applicant proposes to subdivide the three parcels, consisting of approximately 45.2 acres, into 237 single family residential lots in the R1 Dash five zone, incorporating the narrow lot development standards where applicable. As I said, my name is Brian Matson. I'm the planner on this project. Allison Dosser Allison Dawson reviewed this project for development engineering. Jason Noble reviewed this project on behalf of the Fire Marshal's Office. Craig Caudill was our concurrency review concurrency engineer. And Ariel Whitaker. Ariel Whitaker is here tonight to who reviewed this for wetland and habitat compliance. The goal of staff tonight is to provide an overview and summary of the proposal, identify any major outstanding issues or concerns, make recommendations to the. And finally, make recommendations to the examiner. Okay. On the vicinity map, the subject properties are identified by the three black dots. Here North is oriented to the top of the page. The subject site lies south of 119th Street, and if you can see my cursor cursor, it's 1/19 Street is here. 87th Avenue is here, just to the west, 9090 seventh Avenue is the closest northwest street to the east, and you can't see it in this picture, but you'll see it in some of the plans and the photos. I'm going to share the Little League fields border. This property here for the Glenwood Little League. So. Curtin Creek is also off here to the to the west, which is probably of note. Okay, this map shows the parcelization of the lots, the subject site and all the lots to the west and south are zoned R1-5. The lots that abut it to the north here between the site and 119th Street are R-22. Actually that R20-20 2nd May not be accurate. The zoning has changed recently at Clark County. This may be a different higher density. Right? Right. This was probably set up earlier than that. I didn't catch that until just now, so I apologize. >> R 24. >> Yeah, I think you're right. But I just wanted to point that out that that is. >> Also how many how existing dwellings are on this, these three parcels we're talking about. >> Just one. There's a house right here in the westerly portion. >> Okay. >> That is proposed to be removed as part of the development. Got it. They're doing this in phases also though, so I'm not sure. I can't remember off the top of my head if that's phase four or phase three. So it may they may leave that house there during the initial phases. >> So okay. >> To the east here is R-5. So this is the current limits of the urban growth boundary. This has an urban holding urban I'm sorry urban reserve ten overlay on it. Probably not relevant specifically to this to this project. Okay, here we have an aerial photo of the site. Here's the existing single family home you just asked about. It's pretty big footprint. A lot of this appears to be attached shop or something. I couldn't really tell. The site here is shown in red. This line, this straight line down here along the south. This is the Prairie Railroad. It borders the entire southern. Southern is. It comprises the southern boundary of the site. When you see the plan later, it'll make more sense than me pointing out at this point. But they're proposing to access 119th over here at near the northeast corner. And then they're stubbing out several roads that won't be connected at this time, but they will be if they will be connecting to this road down here at the southwest corner. This is northeast 111th way. So they will have two two means of access in, into and out of the development. You can see kind of some of the tree groupings here. Some of these treed areas coincide with wetland areas. Also in the middle here you can kind of see this line. It's not as defined here, but there's like a drainage ditch. I have a photo of it that kind of cuts through the middle here. And I don't know if it's if it's draining from this area kind of off to the west. And, and it goes kind of northwest up here. Or if it's flowing the other way, I couldn't tell necessarily from being out there which way it was flowing, but I've got pictures of it. A lot of these treed areas correspond with wetland tracks that are preserved in their proposed plan. So. Okay, I put this photo first of the plan because I wanted you to be able to see it in a one page view, just for simplicity, because this is 40 some acres and it is comprised of different phases. And so it's kind of hard to see how they all fit together without this. I realize there's not a lot of definition in this view of the plan, but I've followed this up with smaller, more blown up sections of the plan in case we want to talk about anything in specific. You can see the access to 119th Street here, and then this right down here. If you can see my cursor cursor near the southwest corner, this is where it's going to connect to northeast 111th way. So those are the only two public street connections. These other stubs that you see are just stubs. They're not proposed to, to go through at this point. Okay. Probably not until presumably not until the abutting lot would develop. And that's when they would have to connect to those streets. >> And this is exhibit 28. Yes, sir. Okay. >> And like I said, I won't dwell on each of the following slides, but I want I wanted to include them in case we talked about anything in specific because it has a better view of stuff. Here's the north portion of the site along 119th Street. You can see this is wetland B, I believe here you can see kind of the lot layout and the roads and streets and sidewalks and that kind of thing here. This one of oh, before I go too much farther, you're going to see this in several of the photos. This parcel right here that my cursor circling these are the little league fields. And so you'll see some of these rounded outfield fences. I wonder I. >> Thought that was a center pivot irrigation or something. Yeah. >> Right. And I wanted to I forgot to point this out to you. And I don't know how relevant this is, but one of the fields and this is a smaller field here to the south, I'll call it just the tee ball field, for lack of a better descriptor. The this is over the line. It's a part of this field, which is. Yeah, but but I don't I don't think it's truly an encroachment, but I'll leave that up to the attorneys. Of course, the maintenance person I talked to at the Little League fields when I was out there, he knows that it's not on their property, and I think that they had some sort of private agreement with either the previous owners or current owners, just to lease it for a little while. So. >> Okay. >> They know that this is going away and then that field is I don't, I don't, I didn't get any indication that he wanted to pursue any kind of adverse possession for that. I don't know if that would even exist there. Anyway, just pointing that out because I had a conversation with him when I was out there. Here's the southeast portion of the site. This is the railroad right of way here that I talked about earlier, bordering the south portion of the south of the property. You can see that there's a larger wetland here, this square tract here that you can kind of see. It's not the wetland track isn't fully shaped like a square, but it looks like it here. I think this is kind of the area where that drainage ditch kind of runs through in that general area, but you can see kind of the street street configuration and how the lots are laid out. And you can also see the avoidance of these wetland tracks. So again, we can go back to this. If we start talking about anything. >> Do you know where wetland Z is. >> Wetlands. So some of the tracks are like driveway tracks. Also I don't know where wetland Z is off the top of my head, but I can find it for you. I'm gonna and I can share that with you once I finish here. Wetland Z. >> Wetland Z. >> I don't remember seeing that one, but that just. >> Maybe it's for maybe the applicant would want to talk about that. >> Okay. Right, right. They probably have a better idea where that is. This is kind of the northerly middle portion right here where my cursor is. This is where the little league fields are. They're going to stub this northeast Sitka drive to the north, and then you have 94th Avenue, which is an arterial that they're going to partially build. I, I can, I can allow Alastair to explain this a little more, but because the, the Laolagi Prairie Railroad forms a pretty good barrier at the South there, it's my understanding that they're not going to construct the arterial right up to the to the railroad, because if you had to build a bridge over it, you'd just be tearing out the road next to the railroad anyway. But I'll let him discuss that more if that's an issue you want to, to explore further. >> Railroads are kind of like impassable barriers in this world, right? >> You know, the the development wouldn't pencil out if a if a bridge had to be built over that. Right. And so this is the northwesterly portion of the site. There's a pretty considerable sized stormwater pond here. Retention area. This corner here at the southwest. This is where that existing home is. And okay, this they're not proposing to connect to this private road. I think that this, this little piece here is just being reserved as a tract, right. I guess if the the lots to the south or the other lots that take access from 113th, I think it is, or 112th, if those were to develop, maybe I don't, maybe they would connect to this road, but I still don't think this little driveway tract. Anything's really going to happen with that. The applicant can always correct me if I'm wrong. Okay, this is the southwesterly portion of the site. You see all the lots here lined up. There's a couple of tracks in here and there's a wetland area there avoiding through here. Again, here's the railroad tracks that I've mentioned a few times. This is the farthest southerly corner of the site. This is where that other public road connection is going to be. Other than the 119th connection, it's going to be this 111th way. And again, this is that 94th Avenue where where it stops at the railroad. And again, I'm not sure exactly how far back the road is proposed to stop. But again, it might be, I can't really tell, but at any at any point. Alastair can elaborate on that if you want to explore that. Okay, I this is a pretty large site and when I walked it, I took a few photographs. I'm going to rip through them, but I can always come back to anything you want to talk about. Okay. This is looking southerly at the posted sign that faces 119th Street. This is looking easterly at 119th Street near the northeast corner of the site. This is kind of close, not right on top of the proposed access to 119th. Looks like you have a decent amount of site distance here. This is looking westerly from the same spot. Also pretty good sight distance. Here you can see the light poles for the little league field right here along 1/19. This right here that you're looking at. These are gabion boxes, the wire boxes filled with rocks. There's a little bit of a wall here on the back of the sidewalk that the site's a little lower. If I had to guess, I'd say three, four feet, something like that. But. This is looking at the southerly at the site near that same spot that I took the other two pictures. This is near the northeast corner. This is looking southerly at the site from the northeast corner of the Little league fields. You can see the fences here. This is just kind of some shots into the field. This is the treed area in the northeast that you kind of saw from the aerial. This is some of the treed areas in there. Some of these are wetlands. Some of them aren't. This is the tee ball field I explained earlier, which had a little driveway to get close into. The site gives me a pretty good panoramic couple. Panoramic views of the flat nature basically looks like it had been a farm at one point. This is looking southeasterly at the site from the southwest corner, the little league fields. This is looking directly south. You might have noticed in the plan there's a there's a there's an electrical easement, I'm sorry, a utility easement for these power lines that run north south through the site. You can see a couple of these power lines. Some of my photos gives you an idea of where that easement lies. This is looking westerly from that same southwest corner of the Little League fields. Again, power lines I just mentioned gives you an idea of where that where that easement lies. This is looking northeasterly at wetland tract D. This one has a pretty good depression inside these trees that you can't see. I'm not a wetland biologist. So when I go out there, I'm taking a kind of a big guess at where I think these are as far as the map shows, but here's my picture of the drainage ditch near the middle of the site. It's kind of overgrown, but I couldn't tell which way it was flowing. You know, right now it's probably not the the highest water table either. So. This is looking southeasterly at wetland tract B, which is a little farther north than that tract D. And this is from the Little league fields. This is looking easterly at the site from the terminus of 114th Street. Now, this is a private road that they're not proposing to connect to at this point. If those those other parcels that abut the site to the west on 119 114th Street ever do develop, it's likely that they would have to connect here. This picture is looking easterly at the site from the terminus of 111th way. The field is beyond this gate here. This is the site. And then in this tree line here is the railroad grade. I'm looking northerly from that same spot, the terminus of 111th way. Again, here's the power poles. You can kind of see where the easement cuts across the site. This is looking northerly. Of course. I just said that this is a picture I just took back at 111th way. It has sidewalks on both sides of the street. That's public road. That's where they're proposing to connect in the aerial photo. Interestingly enough, you don't see a lot of these houses. This is almost this is almost completely built out at this point, but you don't see that in the aerial photo. I took this one just because I had to have a picture of the railroad tracks. So I picked this spot near the southwest corner of the site. This is all a straight stretch for the whole length of the site, so. This last one is just. I took a picture of the existing home. You can see that kind of the sprawling footprint of this structure. Again, I don't know when this will be demolished, but it'll be demolished at some point before they can build the phase that's to the west. The submittal was deemed Counter Complete March 3rd, 2026. It was deemed fully complete April 22nd, and the staff report and recommendation to the Hearing Examiner was issued July 29th, 2026, with staff recommending conditional approval. And that is exhibit 62. Some of the project issues original hearing was date of 813 was canceled and rescheduled until tonight. In order to resolve several early issues involving some miscellaneous zoning, stormwater transportation, road modification requests, and wetland and habitat. Habitat related items. Of course, none of this is is unique. A lot of projects do the same thing. There were several small several small edits that were identified in the staff report and recommendation by the applicant in which they requested clarification or modification of different findings and or conditions. Staff reviewed the applicant's request, and we and I created a memo of correction to address what I. What I feel are these minor changes. Some of them are typos, this kind of thing. The Washington Department of Ecology comments. >> Exhibit 65 for your. >> 65 is the memo of correction. Yes. The Washington Department of Ecology commented after the comment period closed that during their review of a section 401 water quality certification that they disagreed with the applicant's delineated wetland boundaries. And that is exhibit 40. The staff report and recommendation, as clarified by the memo of Correction, includes a condition that states that the applicant must separately ensure compliance with CW 90 .48 and that such compliance is the applicant's responsibility. Pursuant to Clark County Code section 40 .445.010 dot C dot three. >> So. So I was I was curious if I could the ecology comment that disputed the delineation. I was just an email, just a one page email back in August. August. Right, right. >> It's it's rare for me to get comments from ecology after the comment period closes too, but I put it in the. I put it in the record because it was. Comments from a regulatory agency. Yeah. Again, I didn't get there was quite. There's quite a few more exhibits. Get another. I didn't get another set of comments from ecology after these. So I'm not sure that the applicant did or did not. Mitigation plan. What's that? I did not I'm sorry. I did not receive anything further from ecology. So I'm I don't know if the applicant's revised mitigation plan resolve those issues with ecology or not. I just. >> I saw the applicant rebutted it. The their wetland consultant and their attorney both separate exhibits. >> But I didn't I didn't hear anything back from ecology after that. And I know that they've they've revised some of their wetland and habitat plans after the after those that exhibit 40 was entered into the record, so I'm unsure. Okay. The the advisory condition as as part of the EPA determination. So that so that that so that they can meet that on their own. >> So when the applicant provided you with some corrections and changes they wanted. That was after the ecology comments, right? Because that was exhibit 40 and the staff reports. 62. So presumably you've addressed Ecology's comments in a manner that's satisfactory to the applicant at least. >> Yeah. I can't speak for ecology, of course. I just haven't heard any thing. Nothing. And also Ariel Whitaker is gracious enough to to attend tonight so she can speak to much more knowledge on this subject than I can. >> Okay. Yeah, it is sort of inside baseball, it seems. I'd like to hear. >> I'm a land use planner. I've not a biologist. So that's why I need Ariel. Lastly, the applicant has submitted. Oh, sorry. Go ahead please. >> Did you want me to chime in there or wait. >> Till later? Maybe. Let let Joe let Brian finish and then you can take over. >> Well, do. >> Thanks, Ariel. Okay, I'll I'll wrap it up fast, I promise. The applicant has submitted a technical road modification, which is exhibit 37, asking for relief from cross circulation requirements, namely block length and block perimeter. And the Clark County Road Modification Review Team has supported this request. My final or my my recommendation to you, Mr. Examiner, is based on the application materials known as exhibit one, the revised development plans known as exhibit 28, the Revised Phasing Plan, known as exhibit 34, the revised Technical Road Mod request known as exhibit 37. The Revised Circulation Plan known as exhibit 45. The Revised Stormwater Plan, known as exhibit 46, and the findings and conclusions stated in the staff report and recommendation known as exhibit 62 and the Memo of Correction, known as exhibit 65. Staff recommends the hearing examiner conditionally approved this request and I will remain for any questions. Ariel, would you like to speak on the topic of the wetlands now? Yes. Thanks for being patient. >> Go ahead, Miss Whitaker. >> Oh yes I can. My name is Ariel Whitaker. Good evening, Mr. Hearings examiner. I'm with the Wetland and habitat program. Ecology did make comments, and it was after the official Sepa open period. And I don't I don't I hadn't had any follow up with them after their initial comment period. And I think part of that is to is that they weren't, you know, since the Sepa record was over, I'm not sure that any of the subsequent materials got forwarded to them. Not not entirely sure, but. I did also provide a memo kind of in response to Ecology's comments and to the applicant's comments. I don't have the exact exhibit number, exhibit 41. It's exhibit 50. So Ecology's comments are, I believe, exhibit. >> 4040. >> And my the applicant had a response that I believe was at exhibit 50. And then my response was exhibit 53. So if that if that gives you some background information, you can reference those those documents. But other than that, did you have any specific questions that I could answer for you regarding Ecology's comments? >> It was Ecology's comment struck me as very weird, not because it relates so much, but it's just a kind of a short email, not what you expect from a state agency disputing a delineation and a habitat mitigation plan. So that was sort of weird. And then the, the applicant's wetland consultant jumped on it and provided a responsive memo, quite a bit bigger than a single page email. And then their attorney also jumped on it. And it seemed. My sense is that. Was there any merit to Ecology's comment? They they dispute it, I think wetland, the delineation on wetland Z is like, far as I could tell. And did the applicant sufficiently in your mind respond to the issues raised. >> It's kind of a gray area, honestly, that I think that, you know, as far as the county's response goes, is, is that we made our our wetland determination based off of the wetland boundaries at the time of the Predetermination application. And so there the wetland boundaries may have been larger. But due to agricultural activities, they may have been some disturbance that. Affected the wetland boundaries. But we couldn't make a determination on the date of when that happened. And our prior wetland ordinance exempted preexisting agricultural activities in wetlands. So we based our determination off of the wetland boundaries. At the time of the Predetermination application, and we're unable to determine whether there were any violations in terms of wetland fill. But that doesn't mean that the state or the federal agencies who have jurisdiction couldn't also. >> Do something. >> Do something about that. Right? Yeah. So our basically we put an advisory condition that like, hey, you need to also comply with these other agencies, comply. >> With state law. I saw that, I thought that was I was perplexed, like, what would I do if I were in your shoes? And that's kind of the most I could do. And I saw at least one or a couple of public comments asserted that there were wetland fill violations, heavy equipment out there in the wetland at the time, and the county seemed to take that seriously. But as we know, that's a code enforcement matter. And, you know, doesn't really enter into the equation or enter into my jurisdiction as I evaluate whether these criteria are met for developing the whole site. So yeah, it was it was a perplexing sort of thing. So I guess we'll just have to wait to hear what the applicant has to say. If there's anything more to say beyond the memos that they submitted. So, okay. But as for your recommendation is this is Approvable. They've complied with the county's Wetland and habitat ordinance. >> Yeah. And and there were some there was a public comment about some clearing and grading activities that came up. And we brought that up during early issues. And part of the remedy is to restore and replant and mitigate the remaining portions of the wetland areas on within the proposed tracks. So just wanted to put that out there. >> Okay. Yeah, I saw the exhibit 22 was the the complaint about the wetland fill violations. Okay. All right. Thank you. Yep. Mr. Dawson, any engineering issues on this one? It seems like this is such a a nonlinear sort of configuration that cross-regulation road mod would be needed for it. >> Yeah. This is Alistair Dawson with Development Engineering. Although you can see they are providing a substantial road network. It still doesn't meet the code. So we still had to evaluate if they were doing the best job that they could. So yeah. >> It's a weird site to odd shaped site to deal with. So okay. And so it's just the, the that's the only road mod is cross circulation, block length. The things that are connected with cross circulation. Right? >> Correct. >> Okay. And I see how is stormwater? Are they able to infiltrate here or not? >> Let me pull that up. So warm water they are using wet pond. They're using detention. So I don't think they're it. >> Seems like if it were a very wet site. So it seemed like infiltration wasn't going to work. Okay. >> Yeah. >> Yeah, I think that's it. >> Mr. examiner, if I could add one quick thing. I cannot find a track to Z the I see a tract of V as Valentine. >> It's not. >> A track. >> It's a, it's a wetland. So it must be a designation out of wetland report. It's not a tract. >> Okay. >> It's wetland Z in the eighth dimension. >> I wasn't able to find it. >> Okay. Well, let's see what the what the applicant has to say. See if there's the dust. See if the dust has settled on the ecology comments. So. Okay. And Mr. Caudle, any anything you want to add by on concurrency front? >> Yeah, there are a couple things, Craig. For the record, under the concurrency staff report, under finding three in the corridor finding there are three corridors listed underneath that were analyzed using highway capacity, manual methodology for volume to capacity and the Northeast pattern. Parkway 205 to northeast 94th Avenue. Volume capacity figure is highlighted there. That figure was input into the staff report prior to the HCM calculation being completed. So that is incorrect. And that will be updated during the open record period. >> Okay. So I'm looking at it looks like page 25 of the staff report. Corridor findings. And you'll just issue an errata sheet on that and maybe anything else. >> Yeah. And then one other thing that I noticed under Unsignalized intersections, northeast 88th Street and northeast 94th Avenue, in the first sentence, it notes northeast 119th Street and northeast 132nd Avenue. That is, that's a typo. That should say northeast 88th Street, 94th Avenue. So. Got it. Both both of those items. >> That's page 23. Okay. Okay, so I'll look forward to that errata sheet. Thank you. Thank you. With that, I'll take the applicant's presentation please. >> Good evening, Mr. Examiner. My name is Jason Taylor with engineering. And I'm representing the applicant on on this matter. We have a sizable team assembled here today to help answer any questions that you might have. We have Steve Morasch with Fandrem, who's also representing the applicant. We have Bo Johnson with Ecological Land Services to answer any wetland related questions. And Daniel Stumpf, also with PLS. He's the one who prepared the traffic report. If there's any traffic related questions. And that's that's in addition to the applicant. We first off would like to start by thanking county staff for their work on this project and the detailed staff report that they. They provided. We agree with a majority of of what's in there, and we were able to coordinate with Brian Madsen to, to fix some and mostly, mostly typos that we found in our review of the staff report. So we agree. We. I do have one comment that I'll get to at the end of this, but for the most part agree with exhibit 62 and the memo of corrections as modified by the memo of correction that Brian submitted and exhibit 65. >> Okay. >> The the staff report shows at the end of the staff report it shows exhibit 28, which is the the current plan for the proposal. So that. And that's the plan that's displayed on the on the screen here. Originally >> We had a different configuration around around the wetland areas. And we modified that to minimize wetland impacts to the point where we don't have any direct wetland impacts. So there. Okay. So indirect wetland. >> I could tell through that with the communication with ecology, that the earlier proposal was going to require a four one water quality certification and was a much bigger wetland impact. And that seemed to inform Ecology's comments that came into this proposal. Is that your sense? >> Yeah. So if we if we had wetland fill there, there would be more more requirements that we would have to go through with potentially core and, and ecology. Okay. But by avoiding, but by avoiding direct impacts, we don't, we don't have to go through that. Okay. That permitting process. But Johnson is, is on is on the call as well. If you have any more detailed, detailed questions about, about the, the wetland. Wetland Z is in the center of the site. It's it's in tract N, so that's bounded by the roadways. It's in the center of 116th Street, 115th Street, Sitka Drive. Yeah, yeah. So that's that. And that was the wetland that was brought up by Casey Ecology. And, and yeah, it was, it was an email that wasn't extremely detailed and also didn't provide much, much evidence to support to support that claim. >> Okay. >> The, the other items that were brought up in Brian's presentation about the ball fields. Yes, yes, there is a private agreement between the applicant and the the little League that will allow for use of that field to cease at the time that development occurs on this parcel. But that's that's a private agreement and is not not within the record or nor does it need to be within this record. The the rail and the roadway stub. We are proposing to extend 94th Avenue all the way to our north property, property line and all the way to the railroad within within reason. We previously had a road mod request that was requesting to hold back those improvements away from the railroad with the argument that, you know, we've dealt with railroads in the past, and it's unlikely that they would be supportive of an at grade crossing. And there's likelihood that they would need to be a bridge. We don't know what the design of that is. So we were proposing to end those improvements at 14th Street so that the roadway. So that if we build the. The idea is if we build that roadway, there's a chance that it would have to be torn out. And there's, there's no use for that roadway because no lots will. It's a dead end roadway that doesn't serve any lots. So that argument classification. >> What's a classification of 94th. >> I believe it's a minor arterial. >> Okay. So no direct access. Yep. >> So all that is all putting all that aside, we the county wasn't supportive of that and we removed that from our road mod request. So the the current proposal, the current road mod that's been approved does show those improvements going all the way to the, to the south. >> Okay. >> To the railroad. So there, there will need to be some kind of a barricade or a temporary turnaround with those dead end roadway stubs that for the most part, don't, don't serve, don't serve any proposed lots. >> Yeah. >> Next question. >> This railroad is being used is like a, a. It's like a tourist railroad or something. >> So it is an active railroad. And they I think they're ambitious in expanding their, their operations. So they're, they are hauling freight gravel. Yeah. It is a freight railroad and it is actively being used. >> Okay. It's a. >> Railroad further further north. I believe it becomes more of a kind of hobby railroad where you can, I don't know, write it in, write it in December to visit Santa Claus. So that's that's up towards Brush Prairie. I think there's there's a section of it up there, this area down here, it's, it's actually being used for freight. >> Okay. All right. So that's, that's a serious impediment, I get it. >> There's some discussion about track J currently there. There really is no use plan for track J. It is kind of that awkward piece that is existing driveway on the western end of the site that that likely would be retained either either by the developer for future development. It could be sold to an adjacent development if they wanted to utilize that, or it would be if if they don't desire to hold on to it, it could be owned and maintained by the HOA or. It may just be absorbed by lot 224 so there are a few options there. There's not a clear plan today as to what's going on with with that tract. >> Okay. And this exhibit 28, what's the total number of lots? >> The total number. Let's see if I can. >> Find it. Is it still 237? Did that change? >> 237 okay. That's correct. >> Okay. >> Yeah, there was there was a bit of a reduction in the lot count due to the, the wetland avoidance. When we originally submitted, there were more lots and we, we reduced it just, we had to reduce it to, to avoid avoid those impacts. >> Yeah. >> That makes sense. Yeah. I can confirm that the we are proposing a wet pond which provides detention. There's no infiltration. The pond will. The pond is designed to provide both treatment and detention for. For the entire site. And that's that's all that I have. I do want to turn the time to Steve Morasch to address one of the conditions and possibly one of the public comments. He better suited. >> Question staff issued their correction sheet, which is exhibit 65. Do you where were your comments that. Inspired that? I don't see that as a separate exhibit. >> It's not a separate exhibit, something that Chad Stewart with Jaejin Group submitted or emailed to Brian Mattson. It's certainly could be added to the record by Brian if if needed. It's not. >> If you think it's it's useful. So did the exhibit 65 address all the concerns that you had. >> So there. So the very last item, the addition of condition H4. We had proposed a slightly different wording on that, which Brian was not supportive of this. I believe this was the original. Actually, there was no H4 to begin with. And in this when we saw this we had another comment regarding that. And that's. And that's what I want Steve Morasch to to address. >> Okay. Fair enough. Let's hear what he has to say. >> Good evening. Can you hear me? Okay, Mr. Examiner. >> Yep. I can hear you. Great. Welcome. >> Good. So, Steve Morasch, for the record, with 805 Broadway, Vancouver. And I'd be very brief. I really don't have anything to add because it sounds like everything has been pretty well addressed, but I can answer questions and wanted to touch on two points. The first, exhibit 65, condition H4, and I apologize because I had typed up an email to Brian this morning with just a real minor tweak to add to the record our request in writing, but I got caught up in the outlook. >> I know where that. >> Ended up. >> Yeah. So my email, I typed it. It didn't go anywhere. It's still in my outbox and now I can't even get into my outbox. But anyway, we just wanted to ask for a very small for words. We wanted to add the condition as it reads currently h4. It says the applicant is required to comply with RCW w 9048 as a response to exhibit 40, and our request is to add the words any applicable provisions of between with and CW9048. Just to make it clear that the County is not taking a position on whether we're in compliance with that statute or not, that, you know, that's a that's not a land use statute. It's beyond the scope of a land use hearing. It's something ecology has independent authority over. So we're not objecting to an advisory condition as long as it's really clear that it's just advisory and the county isn't making any determinations one way or another. And I think adding any applicable provisions really makes that clear. So that's our. >> Only noted. That that was my sense when I saw that condition, that that's pretty big chapter of state law. And so it may or may not be applicable. All of it, part of it. So it's basically comply with state law. State law. >> Correct. >> Okay. >> And then the only other comment I'm here to address is there was some there was an exhibit that was one of the tenants that's on the property right now complaining about eviction and also code enforcement. And I just want to say, I agree with staff. I think staff said those are irrelevant in this proceeding. And I just wanted to be on the record as agreeing that they're irrelevant. They're being handled separately. Outside of this proceeding. The code enforcement is something that during that time. >> That time. >> Is someone else talking. I thought I heard someone else talking, I. >> Did, whoever's out there, if you could mute your microphones. >> Okay, well, I'll continue because they're not I'm not hearing it anymore. Anyway, what I was saying was the code enforcement involved a shed that had been converted to some living units, which was all done by the prior owner, not the current owner. And so the current owner is in the process of, of resolving that. And their plan is to demolish the shed. There's I think one person is still living there that is in the process of moving out. And so they won't be able obviously demolish until the person moves out. But that's all being handled. It is being handled and it's separate. It's a code enforcement, so I don't think it's at all relevant proceeding, but just wanted to be on the record. >> These things come up occasionally and my the scope of my authority is very limited, very limited. >> Okay. And unless there's questions, that's really all I have at this point. >> Okay. I think that covers it. Your exhibit 51 is your letter, correct? Okay, okay. And L's in response to Ecology's comments is exhibit 50, I believe. >> Yeah. >> Okay. I think that covers that. Unless unless else wants to say more. >> They're available if you have questions for Bo else he's he's available to jump on. >> Let me just verify my understanding of Ecology's comments if I could, I could. So it's just yeah, we probably. >> Want to get. >> Both. >> Get Bo on for. Yeah, Bo is probably the one to answer that. I mean, I, my, my understanding is it's an email and I, I've read the email and it, it talked about aerial photos and lidar didn't talk about a site visit or anything beyond that. And I think Bo really drilled down on it at exhibit 50, but he, he would be the one to talk the technical details. >> Yeah. If he is there. >> Yes. Mr. Hearings examiner, I am here to answer any questions you might have. One thing I would just like to start off by clarifying is some of these comments come from just observing aerial imagery in the area. And as we can tell, historically, this property has been farmed extensively. As you can see in our response memo. And so that can cause some some challenges in determining what's actually wetland. And so as you can see in that memo as well, what we did is we went out and we collected additional test plot data to, to show that at two years after any kind of disturbance, that it was upland vegetation and that we were not seeing indicators of wet or evidence of wetlands in those areas. And that's how we defined the boundary and how we we define the boundaries of all wetlands that we delineate. >> And it's my sense that the ecology comments were based on aerial photographs and Google Earth images. Was that what what was your interpretation of exhibit 40, the ecology email? >> Yes, essentially that that, you know, again, any agricultural site in Clark County that you would look at, you're going to see years of disturbance and changes in vegetation in and how things look, whether it's been mowed, whether it's been hayed, whether it's been disked and tilled. And so the it's a reason we don't use aerial imagery to delineate wetlands. It can be a resource for us to, to look at and indicate areas we should investigate further, which we did. But in order to prove the the presence or absence of wetland, we have to collect test plot data. Looking at the soils, hydrology and the vegetation to to, to prove whether or not it's upland or wetland. >> Okay, that makes sense. Okay. I mean, I'm and there was nothing more from ecology after exhibit 40. Is that right? That's correct. Okay. All right. >> I think that. Mr. Mr. I didn't receive anything further. >> Okay, I think I think I think that's it. Issue was raised. Issue is responded to. And I, I agree with the condition each for kind of comply. Oh, by the way, comply with state law. Okay. All right. Anything else from the applicant side of things, at least at this moment. >> This is Jason again. >> Anything else? >> Okay, great. I'll take testimony at this time from anyone else in favor of the proposal. He went out there. >> Nope. Nobody's raising their hand. >> Anyone with questions or neutral testimony, raise your hand. >> Mister Examiner. This. I guess this is neutral. I just wanted, in light of today's difficulties in the tech sector, I did want to remind Mr. Morasch and anybody else that had things typed up and wanted to submit to me. Please send them to me when you can and I'll make them part of the record. >> Yeah, I'm hoping that the we'll have an open record period after this hearing of at least a week. I'm hoping Microsoft fixes this problem within that week. Otherwise we'll have to come up with some other arrangement. >> Right? Right, right. >> Okay. >> Heidi here waiting in the wings. She's got her hand up. >> Okay. So are we in the category of anyone opposed? Is that Heidi? So why don't you unmute Heidi's microphone? Let's hear what she has to say. >> Yeah. Heidi should be able to unmute herself. >> Thank you. This is Heidi Poso, and I'm not in the opposed category. I have questions. I had emailed Mr. Mattson earlier about a couple items that aren't in the record, the calculations that Mr. Caudill did to determine the road capacity and the concurrency report aren't there. So I just emailed earlier to ask that they be put on the record so we can review them and have time to look at them. Thank you. >> Okay, Mr. Caudle, does that make sense to you? I think this has come up recently in other cases, so that the explanation I think Miss Puzzle Puzzle was looking for is something you've responded before. >> Yes, absolutely. I can include the volume capacity calculations during the open record period. >> Perfect. Okay, so that was a neutral type comment. Anyone wish to testify in opposition to this proposal? Go ahead and raise your hand. >> Yes, we have one lady. >> Okay. >> I'm not going to try to pronounce the last name. >> Go ahead. >> Larry, you should be able to unmute yourself. >> Thank you. Good evening, Mr. Examiner. And everyone else attending. My name is Vlad Mikhailenko and I'm the tenant living in the main house at 8910 northeast 115th Street. We've been living here since March of 23, along with three other tenants. The property is inside the proposed Glenwood Landing subdivision. I would like to bring attention to existing property conditions and recent findings by the Clark County. On October 29th, 2026, Clark County Code Enforcement and Public Health conducted an on site inspection. There are no documented three separate residential units within the attached shop, two of which were occupied. The inspection also identified a discrepancy with the building permit, which originally described the shop as a one bedroom structure. Additionally, the inspection notes questioned whether the connection between the shop and the main house. The sunroom was covered under the original permit. My family lives in the main house and this connected sunroom serves as a living room. This raises further questions about whether connection and other modifications or additions to the main residence were properly permitted. On November 4th, 2026, Leet Code Enforcement Officer issued a formal notice confirming that Attached shop has been converted into multiple living units without the required building permits. The owner developer was directed to obtain the necessary permits within 30 days, and the county confirmed that occupancy approval is required. Separately, Clark County Public Health has been reviewed outstanding reviewing outstanding issues concerning the septic system and drinking water well, including whether they sufficiently serve the existing residential occupancy. I respectfully request that these documented conditions be considered when evaluating approval conditions. Specifically, I ask that subdivision approval be conditioned upon Jaejin group resolving outstanding unpermitted residential conversion, building occupancy, septic and drinking water compliance issues before further development proceeds. I'm not asking the hearing examiner to resolve matters outside the scope of this hearing. I am asking the outstanding compliance issues and applicable landlord related legal obligations not be bypassed simply because the property is transitioning into redevelopment. Thank you for considering my request. >> Okay. Thank you. And I see your you have two two comments at least in the exhibits and a record. And this is mostly from exhibit 66. So I, I read that so I understand your your points. Thank you. >> Thank you. And this is was not a shed as I think the attorney stated. This is a major shop with three tenants that was operated without permits by the previous landlord, and it continued to be operated in the same manner since December of 2025 by Jim Group. >> Right. I think I've got the I've got the picture. Okay. Thank you. Anyone else wish to testify in opposition? >> Yes, we have Zach Perry. Zach, you should be able to unmute yourself. >> Go ahead. Whenever you're ready. >> Zach Green thing is on. He should be able to talk. It's on. The green is on Perry. >> Hello. >> Oh, you're very faint. Speak up closer to your microphone. >> All right. Can you hear me? >> Yes. Better. Yeah. Go ahead. >> Okay. My name is Zach Perry. I live at 9705 northeast 1/19 Street, directly adjacent to the development in the northeast corner. You kind of see the duplex up there in the corner. I am responsible for exhibit 22. So first I just want to address my original comments. Public notice listed June 17th as the comment deadline. I submitted my comments around midnight that morning prior to the start of business. So. But they were identified later in the staff report as being received late basically, or after the comment period. >> They're in the record, aren't they? >> I believe. So that's coming into this. I wasn't sure if. >> That kind of that kind of that kind of tells the tale there. If they're in the record, they're in the record. Go ahead. >> Okay. I just want to make sure that those comments were addressed. I didn't notice anything specifically in the report. And then I guess there's one thing I wanted to note was that on November 2nd, there were two bald eagles found in that northeast corner near my property and my neighbor at 97. >> I read I read your comments pretty carefully. I saw the pictures. >> So that was a different instance. That was, I think, back in June or, or May when I submitted when I had those pictures, these this was a new incident November 2nd, two eagles that looked like they were fighting. They were taken by wild Fish and wildlife for rehabilitation. And my understanding is that they will be eventually re released back at the location where they were found. Okay. And then I, I guess I heard that the land clearing activity prior to any permitting is just being recognized as a code enforcement issue. >> It's a code violation, right? >> The code violation. I just wanted to state that I did have video evidence of tractors loading trees into trucks and everything like that. I just did not submit those in the comments because the videos were too large of files. There was a public records request that basically stated that they didn't witness any of that activity. The photos look like they were from the street. It didn't look like there was any photos on the actual property. And then, yeah, the last thing that I guess was in my comments was just the traffic and public safety, specifically with the railroad and the two way left turn lane. Just the speed on that road turning into our property is already hazardous as it is. >> So you're talking about. >> 119th Street, correct? >> Okay. Yeah. >> With Mr. Matson's photos looking, I guess that would have been east towards the railroad right there. We basically. >> That's looking. So what's the. >> What's your point about the railroad? >> So the. >> Railroad right here basically for us coming from that direction, traveling towards basically you're right in front of my neighbor's house right here. So for us turning into our property right here, we have to immediately slow down after that railroad track into that two way left turn lane where there's been multiple like near-miss accidents of neighbors that are turning on the other side of the street on the north side of the street. So with the basically where this photo is being taken is where the I think the proposed entrance into the development is. So I guess the concern, my concerns that I raised in the comments were that between the Little League fields and the pumpkin patch, at certain times of the year, there's. There's a lot of traffic right there and it's just hazardous. So I don't know if that location can be moved, but that's all I had to say tonight. >> Okay. >> Mr. examiner, I can confirm that I have Mr. Perry's comments in as exhibit 22. Yeah. >> I read them. >> Okay. Thank you. Anyone else wish to testify in opposition? >> Nobody's. Hands up. >> Okay. >> Anyone? >> Let's see then. Mr. Taylor. Mr. Morasch, you want to take a shot at rebuttal? We'll have the record open after this hearing. But it's always good to have see if there's a first stab at a verbal response. >> Yes. This is Jason Taylor with engineering again. In in response to public testimony, the the proposal includes the the demolition of that entire structure, which would bring that structure or bring that parcel into compliance with the code enforcement action. So I think that's already dealt with. I believe Jaejin Group is going to proceed with the demolition of that shop ahead of time to to comply with code enforcement's timing of bringing that into compliance. But once again, we don't we don't believe that that needs to be addressed with these proceedings. >> Right. It's not a land use issue. >> Yeah. >> The the other public comment. Zach Perry summarized his his comments found in exhibit 22. We submitted responses to that, both from a traffic perspective and habitat perspective, perspective and exhibit 56 and 57. So we we believe that those comments have been adequately addressed and those. And all that information is within the record. >> Okay. >> And also to add to add to the the access to the site and the constraints, the, you know, as, as these properties develop, some more roadways are connected with our various roadway stubs throughout this parcel. It, it'll improve the traffic situation as opposed to, you know, initially, at least for a phase one, a lot of those trips will rely on the intersection of the 119th Street. With construction of phase two, we'll have the secondary access and future development. Will will also provide the opportunity for other access locations into the site. So we believe that. So so one there there are no we don't believe that there are any safety issues or any concurrency issues with with the project as proposed. And things will only get better as properties around this one develop. >> Okay. Is that it by way of your rebuttal for the moment, then. >> That's all I have for now. Thank you. >> Okay. Thank you staff, anything you want to say based on tonight's testimony? >> No sir. I have nothing further to add. >> Okay. Is it time to talk about open records schedule then? >> I think I think we have to have some some open records, you know, mainly because because of the tech issues we've had today, I want to make sure that people that had something to say were able are able to submit their written comments. >> So here, here's what I propose given there are a couple reasons for this, but my proposal is to leave the record open for two weeks for anybody on any issue. And part of that is Miss Poso chimed in in a neutral capacity. And and she has appeared in other hearings, in other cases. And in those cases, she's raised a very interesting issue that I don't see raised yet. But I anticipate maybe during the open record period having to do with concurrency on street segments, as opposed to intersections that exceed 0.9 volume to capacity ratio. And so I believe that might be an issue here. And so she that's why she asked Mr. Cogdill to submit more detailed information on the volume to capacity on affected street segments here. So that's that's an issue that the applicant will want to pay close attention to in responding perhaps to things that come into the open record. So it even though no one else has really weighed in, I want to make sure that if that issue comes up, that everybody has a chance to consider it. So my inclination is, is two weeks and then I, I'm. Of several minds as to whether to just have the applicant's final rebuttal after that, or an opportunity for more of a substantive response to things that come in during that first period. So I guess, Mr. Morasch Morasch. >> You. >> You, you've been involved in some of these cases with the segment concurrency, concurrency. What do you think. >> Of that? Thank you. >> Well, I think, you know, if if if a new issue gets raised, it wasn't really raised, you know, squarely at the hearing tonight, we would like, you know, at least some time to submit factual rebuttal in addition to legal rebuttal, just because, as you. >> Know, to do that. >> These these records, once once that issue starts being discussed, then there's, there's a lot of sort of background information that both sides want to submit. And I'm hesitant to dump, you know, 500 pages of documents into the record. Now if the issue isn't raised. But if the issue gets raised sort of towards the tail end of the 14 days, then I would want seven days to be able to submit factual rebuttal on the issue, if that makes sense. >> Yes. So do you have a problem with 14, seven, seven seven? >> No, that would be fine. >> Thank you. Okay. Okay. So I'm. >> That would assume that Mr. Cathell gets his information in soon enough that interested parties have time to respond to it. During the first 14 days. >> Right. I would ask Mr. Caudle to do that. Okay. To do that? >> Yeah. >> Okay with that. Let me go through this. >> Is this is Jason with pls. Okay. Does it make more sense for the first period to be seven days? Because that would give Craig the ability, because I feel like the bulk of the response may come from responding to Craig's additional information. Right? So the first the first period is for Craig to get additional information in. And then the second period would be a potential response to that. >> Okay. That that makes better sense. You're right. That makes better sense. You're right. >> If we do that though, then we need a third period. A third period for factual rebuttal. >> Seven, seven, seven should cover it, would cover it. >> But if I'm a let's, let's assume during the first seven periods, Mr. Craig I'll say, Craig, I don't know how to pronounce his last name properly. If Craig submits something in the first seven days and then. And then that triggers. Someone else like, like Heidi to come in and submit a bunch of stuff, you know, raising this concurrency issue. Then we would want seven days of, of, of time to submit factual information. At that point, we wouldn't want to be limited only to the final legal argument. That's my concern about a pure 777 is, you know, we would have to gather a bunch of stuff and submit it to to build our factual record. And we don't know if that issue is going to be raised or not. We wouldn't know until the end of the second. Seven day period. Okay, so we need seven, seven, seven, and then the seven for the final legal argument. So for Seven's. >> Okay for seven. >> Or we could give or we could give Craig one day to submit his. >> Well listen, Mr. Caudle, let's what what do you need to submit the concurrency and volume capacity data and some summary memo. >> Seven days will be sufficient for me. I don't need any more time than that. >> What I would look for to not just the the data on this, but also what was most useful in these other cases was the memo that explains how concurrency evaluates how concurrency engineering evaluates the volume capacity in segments, but taking into account voluntary mitigation by an applicant or operation of adjacent intersections. So those memos as well as the information, the data on these segments would be useful. And you can whip that together in a in a week. >> Yeah, I don't I don't see how I would need any more time than that. >> Okay. So let's so the first segment will end on November 19th at 5:00. If. Mr. Cogdill, the focus is on you during this first segment. But people out in the public, if you have any issues or any information or comments you want to submit, do it during that first period as well. So the first one and 5:00 on Thursday, the 19th of November, the second seven day period will go till the 27th, 5:00 on November 27th, where people can respond to what came in during that first period. So the 19th, then the 27th, and then in anticipation of something the applicant will need to respond to with new factual information, there'll be another open record period that ends December 4th. New new evidence is fine. Anyone can respond to things that came in during the second period. And then after that, the applicant has final rebuttal. No new evidence that would take us to December 11th. So does that make sense to everybody and is that acceptable? Any objections? >> Lande staff is comfortable with that, sir. >> Okay, Mr. Caudle, you're in the first part. So you that you said a week will work for you. And Mr. Morasch and Mr. Taylor. >> Yes, that works for us. Thank you. >> Okay. And is Miss Poso still on line? Does this work for you? >> Yes it does, thank you. >> Okay, great. All right, that settles it. Then I will conclude tonight's hearing. But keep the record open according to that schedule. November 19th. November 27th, December 4th. December 11th. Those deadlines are 5:00 on those dates, the. Any submissions have to be in Mr. Madsen's hands by 5:00 that day. Then the record closes and I'll kick out my opinion approximately two weeks after the record closes, and that will end my part of it. Okay. Thank you very much, all of you, for participating. A number of moving parts in this application, but let's let's move it forward and bring it to a conclusion this year. Thank you very much. Good evening. >> Thank you. Mr. >> Thank you. Mr